Planning application
NCP Car Park Manchester Central Lower Mosley Street Manchester M2 3GX
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Application to discharge conditions: 7 (CMP - Energy Centre); 8 (Contaminated Land); 9 (Materials to be Approved); 10 (Surface Water Drainage); 11 (Metrolink Maintenance Access); 12 (fire strategy); 13 (EMC Control Plan); 14 (Earthing Electrode); 15 (Large Vehicle Access); 18 (NSE6 - Externally Mounted Equipment); 19 (External Illumination); 20 (Penetrative Methods); and 21 (Fume Extraction) attached to planning permission reference number 118869/VO/2018.
As published by the council, reference CDN/19/0684
Application record
- Reference
- CDN/19/0684
- Type
- Approval of condition application
- Status
- Decided
- Decision
- Approved
- Received
- 7 Aug 2019
- Validated
- 7 Aug 2019
- Decided
- 31 Oct 2019
- Ward
- Deansgate Ward
- Decision by
- Delegated Decision
- Postcode
- M2 3GX
Site history
Applications at this address on the Manchester register
This site has had 4 applications since 2018: 4 approved, 0 refused.
-
126436/JO/2020 Granted
NCP Car Park Manchester Central Lower Mosley Street Manchester M2 3GX
CITY COUNCIL DEVELOPMENT - Variation of condition 2 (Approved Drawings) imposed upon planning approval reference 118869/JO/2018 under section 73 of the Town And Country Planning Act 1990 to allow amendments to the approved design.
-
CDN/19/0478 Granted
NCP Car Park Manchester Central Lower Mosley Street Manchester M2 3GX
Discharge of Conditions 3 (Construction Management Plan), 4 (Arboriculture Method Statement), 5 (Archeaology) and 6 (Pavement Reinstatement) of application referenced 118869/VO/2018
-
118869/VO/2018 Granted
Ncp Car Park Manchester Central Lower Mosley Street Manchester M2 3GX
CITY COUNCIL DEVELOPMENT - full planning permission to: (i) construct and operate a combined heat and power (CHP) Energy Centre (with a total thermal capacity of approximately 27MW, fuelled by natural gas) together with externally located ancillary infrastructure including HV switch-room; gas-meter room; thermal stores; mezzanine gantry; access ladders and staircases, dry air coolers, supply / extraction fans and ductwork and security fencing ("The Energy Centre") and (ii) install a network of underground insulated heating pipes, electrical cabling, communications ducting beneath sections of the following adopted highways ("The Civic Quarter Heat Network").
Timeline
Dates from the published record
-
7 Aug 2019
Received by Manchester
-
31 Oct 2019
Decision issued: Approved
-
6 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
112 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Manchester granted permission on 31 October 2019, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Manchester Central Convention Complex Windmill Street Manchester M2 3GX
Discharge of condition 6 (Pedestrian Management Strategy) of application reference 122183/VO/2018
Granted Conditions 3 docs -
Manchester Central Convention Complex Windmill Street Manchester M2 3GX
Discharge of Condition 3 (Construction Management Plan) of application reference 122183/VO/2018
Granted Conditions 6 docs -
Manchester Central Convention Complex Windmill Street Manchester M2 3GX
Erection of memorial to commemorate the 200th anniversary of the Peterloo Massacre
Granted Other 32 docs -
Manchester Central Convention Complex Windmill Street Manchester M2 3GX
LISTED BUILDING CONSENT Erection of memorial to commemorate the 200th anniversary of the Peterloo Massacre
Granted Heritage and listed buildings 32 docs -
Peterloo Massacre Monument Windmill Street Manchester M2 3DW
90% historically approved · decision due ~6 Jun
Discharge of Condition 4 (Disabled Access) of application reference 122184/LO/2018.
Awaiting decision Conditions 2 docs -
Manchester Central Convention Complex Windmill Street Manchester M2 3GX
Discharge of Condition 3 (Materials to be Approved) of application reference 122184/LO/2018
Granted Conditions 7 docs
Other condition discharge and variation applications
In Manchester
-
OTH-2026-000655 Split decision
Land at Deansgate South Manchester M3 4LB
Discharge of Conditions 18b (Acoustics) and 19 (Plant Acoustics) attached to Planning Permission 129406/FO/2021.
-
OTH-2026-000582 Granted
Wythenshawe Park Sports Hub Wythenshawe Road Manchester M23 0AB
Discharge of conditions 4 (Demolition and Construction Management Plan), 29 (Hedgehog RAMS) and 41 (Contractors’ Compound) attached to planning permission 144282/VO/2025.
-
OTH-2026-000984 Granted
Crumpsall Park Visitors Centre (North West Corner of Crumpsall Park) Ash Tree Road Manchester M8 5RX
Discharge of Conditions 18a (Acoustic insulation), 19a (External Equipment) attached to Planning Permission 142985/VO/2025.
-
OTH-2026-000678 Refused
Car Park Great Jackson Street Manchester M15 4NJ
Discharge of Condition Condition 23a (Residential Amenity Noise Insulation) within Phase 1 attached to Planning Permission 143143/JO/2025
-
OTH-2026-000656 Granted
Land at Deansgate South Manchester M3 4LB
Discharge of Condition 11 (Public and Private Realm Works) attached to Planning Permission 129406/FO/2021