Planning application
Manchester Central Convention Complex Lower Mosley Street Manchester M2 3GX
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Application to discharge condition 3 (Light Spill) of application referenced 120299/FO/2018.
As published by the council, reference CDN/18/0958
Application record
- Reference
- CDN/18/0958
- Type
- Approval of condition application
- Status
- Decided
- Decision
- Approved
- Received
- 20 Dec 2018
- Validated
- 20 Dec 2018
- Decided
- 12 Feb 2019
- Ward
- Deansgate Ward
- Decision by
- Delegated Decision
- Postcode
- M2 3GX
Site history
Applications at this address on the Manchester register
This site has had 2 applications since 2018: 2 approved, 0 refused.
-
120299/FO/2018 Granted
Manchester Central Convention Complex Lower Mosley Street Manchester M2 3GX
LISTED BUILDING CONSENT for retention of existing lighting on the external roof of the entrance foyer and addition of new lighting on the front arch elevation of Manchester Central Convention Centre.
Timeline
Dates from the published record
-
20 Dec 2018
Received by Manchester
-
12 Feb 2019
Decision issued: Approved
-
13 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, a planning consultancy registered in Stockport
10 applications on PlanIndex · across 3 councils · 100% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
3 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Manchester granted permission on 12 February 2019, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Manchester Central Convention Complex Lower Mosley Street Manchester M2 3GX
LISTED BUILDING CONSENT for retention of existing lighting on the external roof of the entrance foyer and addition of new lighting on the front arch elevation of Manchester Central Convention Centre.
Granted Full applications 15 docs -
Manchester Central Convention Complex Windmill Street Manchester M2 3GX
Discharge of Conditions 6 (CIS), 7 (Cycle Parking), 9b (Noise 1 - the use),10a and b (Fumes, Vapours and Odours), and 11b (Noise 6 - Equipment) attached to Planning Permission 137413/FO/2023.
Granted Conditions 19 docs -
Manchester Central Convention Complex Windmill Street Manchester M2 3GX
Replacement of existing black patent glazed roof over the offices/event toilets extension with an insulated standing seam roof panel system
Granted Full applications Extension Windows or glazing 24 docs -
Manchester Central Convention Complex Windmill Street Manchester M2 3GX
LISTED BUILDING CONSENT for the replacement of existing black patent glazed roof over the offices/event toilets extension with an insulated standing seam roof panel system.
Granted Heritage and listed buildings Extension Windows or glazing 24 docs -
Manchester Central Convention Complex Windmill Street Manchester M2 3GX
LISTED BUILDING CONSENT for addition of lighting to the external roof of the entrance foyer and front elevation of Manchester Central convention centre.
Granted Heritage and listed buildings 16 docs -
Manchester Central Convention Complex Windmill Street Manchester M2 3GX
80% historically approved · decision due ~7 Sep
Proposed installation of roof mounted PV panels.
Awaiting decision Full applications 12 docs
Other condition discharge and variation applications
In Manchester
-
OTH-2026-000655 Split decision
Land at Deansgate South Manchester M3 4LB
Discharge of Conditions 18b (Acoustics) and 19 (Plant Acoustics) attached to Planning Permission 129406/FO/2021.
-
OTH-2026-000582 Granted
Wythenshawe Park Sports Hub Wythenshawe Road Manchester M23 0AB
Discharge of conditions 4 (Demolition and Construction Management Plan), 29 (Hedgehog RAMS) and 41 (Contractors’ Compound) attached to planning permission 144282/VO/2025.
-
OTH-2026-000984 Granted
Crumpsall Park Visitors Centre (North West Corner of Crumpsall Park) Ash Tree Road Manchester M8 5RX
Discharge of Conditions 18a (Acoustic insulation), 19a (External Equipment) attached to Planning Permission 142985/VO/2025.
-
OTH-2026-000678 Refused
Car Park Great Jackson Street Manchester M15 4NJ
Discharge of Condition Condition 23a (Residential Amenity Noise Insulation) within Phase 1 attached to Planning Permission 143143/JO/2025
-
OTH-2026-000656 Granted
Land at Deansgate South Manchester M3 4LB
Discharge of Condition 11 (Public and Private Realm Works) attached to Planning Permission 129406/FO/2021