Skip to content
PlanIndex Get alerts
Menu

Planning application

Building 401 Avro Way Manchester M90 5XR

Granted Manchester 135847/JO/2022 Removal/variation of conditions

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Application to vary the wording of condition 7 (Secured by Design) attached to planning permission 133408/JO/2022.

As published by the council, reference 135847/JO/2022

Application record

Reference
135847/JO/2022
Type
Removal/variation of conditions
Status
Final
Decision
Approve
Received
23 Dec 2022
Validated
23 Dec 2022
Decided
24 Mar 2023
Ward
Woodhouse Park
Decision by
Delegated Decision
Postcode
M90 5XR

Site history

Applications at this address on the Manchester register

This site has had 3 applications since 2022: 3 approved, 0 refused.

  • CDN/22/0892 Granted

    Building 401 Avro Way Manchester M90 5XR

    Application to discharge conditions 12 (contaminated land) and 17 (vehicle charging points) attached to planning permission 133408/JO/2022

    Decided 29 Mar 2023 Conditions
  • CDN/22/0858 Granted

    Building 401 Avro Way Manchester M90 5XR

    Discharge of Condition 16 (Travel Plan) attached to planning permission 133408/JO/2022

    Decided 24 Apr 2023 Conditions

Timeline

Dates from the published record

  1. 23 Dec 2022

    Received by Manchester

  2. 24 Mar 2023

    Decision issued: Approve

  3. 6 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file

1,203 applications on PlanIndex · across 153 councils · 94% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

5 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Manchester granted permission on 24 March 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About amendment applications

An amendment application makes limited changes to a permission that already exists; anything beyond modest adjustment needs a fresh application. More in our guide to planning application types.

Nearby applications

Within 500 metres

In Manchester

  • 144011/JO/2025 Granted

    271 Oldham Road Manchester M40 7PS

    Variation of planning application 127971/FO/2020 to vary conditions 2 (Specified Plans), 18 (Landscaping), 20 (Noise), and 29 (off site highways) to make elevational alterations, reduce car parking spaces and amend triggers in the conditions

    18 Sep 2025 Amendments
  • OTH-2026-001083 Granted

    Walkers Of Manchester Crabtree Lane Manchester M11 4GU

    Non Material Change to planning permission reference 143419/JO/2025 to allow increase in external floor levels of +100mm, area increase by 3%, roof plan updates following detailed design of PV and Rooflights arrangement, External Wall Louvres added and alterations to boundary treatments and hard landscaping finishes.

    20 Jul 2026 Amendments
  • PLA-2026-001061 Granted

    18 Kempton Road Manchester M19 2GJ

    Variation of Condition 2 (specified plans) attached to Planning Permission 145495/FH/2026 to allow changes to roof form.

    17 Jul 2026 Amendments
  • PLA-2026-000985 Granted

    Sunlight House Seventh & Eighth Floor Quay Street Manchester M3 3JZ

    Variation of condition 2 (Approved Plans) and 5 (Finishes) attached to Listed Building Consent 145027/LO/2026 to reflect internal layout changes and finishes.

    9 Jul 2026 Amendments
  • OTH-2026-001247 Granted

    Birtles House Unit 1 Market Place Civic Centre Manchester M22 5RE

    Non material amendment to planning permission referenced 144669/FO/2025 to allow alterations to the wording of conditions 5 (Metrolink CMP), 7 (electromagnetic compatibility plan), 9 (local labour), 13 (surface water drainage) and 31 (Bird Hazard Management Plan) in order to alter the timescales to facilitate demolition and site clearance works

    5 Aug 2026 Amendments