Planning application
Tesco Superstore 3 Victoria Avenue East Manchester M9 6HW
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Installation of 1x 42" LCD media screen and 3x 1250mm x 700mm flag pole signs with an overall height of 2450mm
As published by the council, reference 125391/AOH/2019
Application record
- Reference
- 125391/AOH/2019
- Type
- Advertisement Hoardings Consent
- Status
- Decided
- Decision
- Approved
- Received
- 7 Nov 2019
- Validated
- 7 Nov 2019
- Decided
- 13 Jan 2020
- Ward
- Charlestown Ward
- Decision by
- Delegated Decision
- Postcode
- M9 6HW
Site history
Applications at this address on the Manchester register
This site has had 2 applications since 2019: 1 approved, 0 refused.
-
NOT-2026-001300 Awaiting decision
Tesco Superstore 3 Victoria Avenue East Manchester M9 6HW
Prior-approval for the installation of 366 photovoltaic panels on a flat roof.
Timeline
Dates from the published record
-
7 Nov 2019
Received by Manchester
-
13 Jan 2020
Decision issued: Approved
-
6 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
9 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Manchester granted permission on 13 January 2020, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About advertisement consent applications
Advertisement consent is judged on two things only: amenity and public safety, not competition or other planning considerations. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
1200 Rochdale Road Manchester M9 6FR
Installation of 1 x 48 sheet sequential digital screen to replace existing static hoarding.
Refused Advertising 12 docs -
Tesco Superstore 3 Victoria Avenue East Manchester M9 6HW
81% historically approved · decision due ~5 Oct
Prior-approval for the installation of 366 photovoltaic panels on a flat roof.
Awaiting decision Prior approval 4 docs -
Footway Victoria Avenue East Manchester M9 6HB
Prior approval for the installation of a 20 metre high telecommunication column including 6 no. antennas, 2 no. transmission dishes and 2 no. equipment cabinets and ancillary development including GPS module and 3 no. remote radio units.
Granted Telecoms 13 docs -
1184 Rochdale Road Manchester M9 6ER
Replacement of existing 48 sheet advertisement display, with illuminated digital display digital poster panel
Refused Advertising 12 docs -
1176 Rochdale Road Manchester M9 6ER
Installation of internally illuminated sign and blue LED halo illumination to the ATM surround
Granted Advertising 7 docs -
1176 Rochdale Road Manchester M9 6ER
Installation of a external flue to rear of existing cafe
Granted Full applications 11 docs
Other advertisement consent applications
In Manchester
-
PLA-2026-001009 Refused
Site 3 - adjacent to No. 2 Circle Square along Symphony Park Circle Square Oxford Road Manchester M1 7ED
Erection of double-sided internally illuminated freestanding digital advertisement totem.
-
PLA-2026-000710 Granted
Ground Floor Alliance House 30 Cross Street Manchester M2 7AQ
Installation of 2no. externally illuminated hanging signs.
-
PLA-2026-000946 Refused
Corner of Oxford Road and Symphony Park Circle Square Oxford Road Manchester M1 7ED
Erection of double-sided internally illuminated freestanding digital advertisement totem.
-
PLA-2026-001327 Awaiting decision
Parrswood Entertainment Centre Wilmslow Road Manchester M20 5PG
Advertisement consent for the display of a 7m-high internally illuminated Totem sign and 12no. internally illuminated double-sided signage panels.
-
PLA-2026-000929 Granted
St Peter's Square Tram Stop Manchester M2 5PD
Installation of 3No. digital advert display for a temporary period of five years.