Planning application
Wythenshawe Forum Forum Centre Forum Square Manchester Wythenshawe M22 5RX
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
City Council Development for the erection of 1.1m high free standing roof edge protection
As published by the council, reference 123660/VO/2019
Application record
- Reference
- 123660/VO/2019
- Type
- Regulation 3 Consent
- Status
- Decided
- Decision
- Granted As published: Approved
- Received
- 14 Jun 2019
- Validated
- 14 Jun 2019
- Decided
- 6 Aug 2019
- Ward
- Woodhouse Park Ward
- Decision by
- Delegated Decision
- Postcode
- M22 5RX
Timeline
Dates from the published record
-
14 Jun 2019
Received by Manchester
-
6 Aug 2019
Decision issued: Approved
-
13 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
12 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Manchester granted permission on 6 August 2019, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About less common application types
This application sits outside the common categories, and the council record linked on this page sets out the specific procedure that applies. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Learning Zone The Forum Centre Forum Square Manchester M22 5RX
City Council Development for change of use of part of the ground, first and second floor of the Adult Learning Zone (Use Class D1) to Job Centre (Use class A2).
Granted Other 9 docs -
Wythenshaw Forum Centre Simonsway Manchester M22 5RX
Discharge of condition no. 4 (Travel Plan) of planning permission ref 116694/VO/2017
Granted Conditions 3 docs -
The Forum Centre Forum Square Manchester M22 5RX
Non-material amendment to planning approval reference 125699/VO/2019 to reduce the height of the flue and a minor lateral movement
Granted Amendments 8 docs -
The Forum Centre Forum Square Manchester M22 5RX
CITY COUNCIL DEVELOPMENT Installation of a flue to serve internally located Combined Heat and Power Unit, crane lift into the Plant room of the CHP, new louvered doors with additional louvers to be installed, new steelwork to support heat rejection radiator at 2.7m above ground level.
Granted Other 9 docs -
The Forum Centre Simonsway Manchester M22 5RX
Installation of Air Source Heat Pump within existing external compound
Granted Full applications 10 docs -
The Wythenshawe Forum Centre Forum Square Simonsway Manchester M22 5RX
Prior Notification application for the installation of 319 PV panels on the roof
Granted Prior approval 11 docs
Other less common application types
In Manchester
-
145299/DEM/2026 Granted
Virgin Media Concord Business Park Threapwood Road Manchester M22 0EY
Demolition of existing building.
-
145181/VO/2026 Granted
Land At Hillkirk Street Manchester M11 3EZ
City Council Development for creation of temporary surface car park for period of three years and retention of associated boundary treatment.
-
143948/VO/2025 Withdrawn
Albert Square Manchester
Temporary change of use of public open space for the purpose of a Christmas Market alongside high end fairground attractions for a period of 59 days.
-
ENF/15474/22 Awaiting decision
2 Albert Road Manchester M19 3PJ
Deemed application following ground (a) appeal against Enforcement Notice served under reference ENF/15474/22 for the erection of an external staircase (including landing platform), the replacement of a window with a door together with the installation of a canopy over and the formation and installation of a new window at first floor level to the rear (appeal ref APP/B4215/C/26/3377718)
-
144971/VO/2026 Granted
Piccadilly Gardens Manchester
City Council Development for the phased erection of a 2.4-metre-high hoarding for a temporary period of 18 months.