Planning application
Moston Lane Primary School Moston Lane Manchester M9 4HH
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
CITY COUNCIL DEVELOPMENT Siting of a two-storey 4 classroom temporary teaching block, with ramped and stepped access, for a temporary period to November 2017.
As published by the council, reference 113275/VO/2016
Application record
- Reference
- 113275/VO/2016
- Type
- Regulation 3 Consent
- Status
- Permitted
- Decision
- Granted As published: Temporarily Approved
- Received
- 27 Jul 2016
- Validated
- 27 Jul 2016
- Decided
- 21 Sep 2016
- Ward
- Harpurhey Ward (2004)
- Decision by
- Delegated Decision
- Postcode
- M9 4HH
Timeline
Dates from the published record
-
27 Jul 2016
Received by Manchester
-
21 Sep 2016
Decision issued: Temporarily Approved
-
28 Sep 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Manchester City Council Agent
160 applications on PlanIndex · across 2 councils · 99% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
10 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Manchester granted permission on 21 September 2016, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About less common application types
This application sits outside the common categories, and the council record linked on this page sets out the specific procedure that applies. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Moston Lane Community Primary School Moston Lane Manchester M9 4HH
Discharge of Condition 3 (Materials) from Planning Approval 142651/VO/2025.
Refused Conditions 6 docs -
MOSTON LANE COMMUNITY PRIMARY SCHOOL, MOSTON LANE, MANCHESTER, M9 4HH
89% historically approved · decision due ~25 Jun
Non-Material Amendment to Planning Permission 142651/VO/2025 to allow amendment to boundary treatment, and discharge of condition 3 (materials).
Awaiting decision Amendments 4 docs -
215-217 Moston Lane Manchester M9 4HE
Discharge of conditions 7 (waste management) and 11 (Construction Management Plan) associated with planning permission 115090/FO/2017
Granted Conditions 9 docs -
217 Moston Lane Manchester M9 4HE
Change of use from office (Class B1) to hot food takeaway (Class A5) together with associated fume extraction flue
Refused Full applications 5 docs -
215-217 Moston Lane Manchester M9 4HE
Change of use of ground floor from office (Class B1) to 2 retail units (Class A1), with 4 duplex flats (Class C3a) above.
Granted Full applications New dwelling 11 docs -
Pavement Adjacent To Edward Street/Moston Lane Manchester M9 4JD
Prior Approval for the installation of 20 metre high telecommunication monopole with 3 associated antennas and 2 dishes together with related works including equipment cabinets
Refused Telecoms 18 docs
Other less common application types
In Manchester
-
145299/DEM/2026 Granted
Virgin Media Concord Business Park Threapwood Road Manchester M22 0EY
Demolition of existing building.
-
145181/VO/2026 Granted
Land At Hillkirk Street Manchester M11 3EZ
City Council Development for creation of temporary surface car park for period of three years and retention of associated boundary treatment.
-
143948/VO/2025 Withdrawn
Albert Square Manchester
Temporary change of use of public open space for the purpose of a Christmas Market alongside high end fairground attractions for a period of 59 days.
-
ENF/15474/22 Awaiting decision
2 Albert Road Manchester M19 3PJ
Deemed application following ground (a) appeal against Enforcement Notice served under reference ENF/15474/22 for the erection of an external staircase (including landing platform), the replacement of a window with a door together with the installation of a canopy over and the formation and installation of a new window at first floor level to the rear (appeal ref APP/B4215/C/26/3377718)
-
144971/VO/2026 Granted
Piccadilly Gardens Manchester
City Council Development for the phased erection of a 2.4-metre-high hoarding for a temporary period of 18 months.