Planning application
Land Bound By Princes Bridge, The River Irwell, The Zig Zag Viaduct And Water Street Manchester
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Test piling works to inform construction methodology for the proposed Ordsall Chord. Comprises 2No. test piles and 6No. tension piles to be undertaken on land bound by Prince's Bridge, the River Irwell, the Zig Zag Viaduct and Water Street, Manchester
As published by the council, reference 107878/FO/2015/C1
Application record
- Reference
- 107878/FO/2015/C1
- Type
- Full Application Consent
- Status
- Permitted
- Decision
- Granted As published: Approved
- Received
- 23 Jan 2015
- Validated
- 23 Jan 2015
- Decided
- 31 Mar 2015
- Ward
- City Centre Ward (2004)
- Decision by
- Delegated Decision
Site history
Applications at this address on the Manchester register
This site has had 2 applications since 2015: 2 approved, 0 refused.
-
107879/LO/2015/C1 Granted
Land Bound By Princes Bridge, The River Irwell, The Zig Zag Viaduct And Water Street Manchester
LISTED BUILDING CONSENT Test piling works to inform construction methodology for the proposed Ordsall Chord Comprises 2no. test piles and 6no. tension piles to be undertaken on land bound by Prince's Bridge, the River Irwell, the Zig Zag Viaduct and Water Street, Manchester
Timeline
Dates from the published record
-
23 Jan 2015
Received by Manchester
-
31 Mar 2015
Decision issued: Approved
-
8 Oct 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Network Rail Infrastructure Ltd Agent, registered in London
Active · incorporated 1994 · London
172 applications on PlanIndex · across 47 councils · 98% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
9 documents on file for this application
A planning file usually holds the application form, the consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWorking a patch? Trade sends you every new job in your area each morning. 14 days free.
What this grant of permission means
Manchester granted permission on 31 March 2015, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Land Bound By Princes Bridge, The River Irwell, The Zig Zag Viaduct And Water Street Manchester
LISTED BUILDING CONSENT Test piling works to inform construction methodology for the proposed Ordsall Chord Comprises 2no. test piles and 6no. tension piles to be undertaken on land bound by Prince's Bridge, the River Irwell, the Zig Zag Viaduct and Water Street, Manchester
Granted Heritage and listed buildings 9 docs -
Railway Viaduct Over River Irwell Leading To Lower Byrom Street Warehouse Manchester M3 4AN
LISTED BUILDING CONSENT for structural investigation works, involving trial pits/opening up works and material samples.
Granted Heritage and listed buildings 7 docs -
Railway Viaduct Over River Irwell Leading To Lower Byrom Street Warehouse, Water Street
Listed building consent for the proposed reconstruction of two arches on the Zig Zag Viaduct in the Castlefield Area of Manchester
Granted Heritage and listed buildings 8 docs -
Network Arch Bridge Over River Irwell Manchester
Material Change to Vary Deemed Planning Permission. Alterations to design of proposed Network Arch bridge over River Irwell, next to Hampson Street
Granted Amendments 8 docs -
1830'S Railway Viaduct Linking Stephensons Bridge Over River Irwell To Liverpool Road Station Water Street Manchester
Minor Non Material Change to Vary Deemed Planning Permissions and 103617/LO/2013. Alterations to design of south abutment of proposed Network Arch bridge next to Hampson Street
Granted Amendments 19 docs -
Aviva Studios (Formerly Factory International) Water Street Manchester M3 4JQ
Installation of 1no. high level individual letter internally illuminated signage on south elevation.
Granted Advertising 14 docs
Other full applications
In Manchester
-
PLA-2026-000242 Withdrawn
Land to the north of 4 and 6 Mansfield Avenue Manchester M9 6RJ
Erection of 2 semi-detached family dwellinghouses (Use Class C3(a)) with associated, landscaping and boundary treatment and parking spaces.
-
PLA-2026-000622 Granted
Sainsburys's Heaton Park Retail Park Heaton Park Road Manchester M9 0QS
Installation of a We Buy Any Car customer pod (sui generis use) with associated allocated car parking and PV panels to the roof of the sales pod
-
145548/FO/2026 Refused
Land Adjacent To 4 Neswick Walk Manchester M23 0HY
Erection of two-storey detached dwellinghouse incorporationg rear roof dormer (Class C3) with associated landscaping.
-
PLA-2026-001186 Granted
St Pauls RC High School Firbank Road Manchester M23 2YS
Installation of modular classroom building.
-
PLA-2026-000910 Awaiting decision
Heathcote Hotel 107 Piccadilly Manchester M1 2DB
Creation of additional 20 no. rooms and associated elevational alterations including reconfiguration of plant deck and works to pavement lights.