Planning application
Victoria Wine Co Ltd 98 Portway Woodhouse Park Manchester M22 1SH
Works: Windows or glazing
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Installation of an automated teller machine (ATM) to shop front
As published by the council, reference 099528/FO/2012/S2
Application record
- Reference
- 099528/FO/2012/S2
- Type
- Full Application Consent
- Status
- Permitted
- Decision
- Granted As published: Approved
- Received
- 29 Jun 2012
- Validated
- 29 Jun 2012
- Decided
- 3 Aug 2012
- Ward
- Woodhouse Park Ward (2004)
- Decision by
- Delegated Decision
- Postcode
- M22 1SH
Timeline
Dates from the published record
-
29 Jun 2012
Received by Manchester
-
3 Aug 2012
Decision issued: Approved
-
25 Nov 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Newwave installations Agent
3 applications on PlanIndex · across 2 councils
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
12 documents on file for this application
A planning file usually holds the application form, the consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWorking a patch? Trade sends you every new job in your area each morning. 14 days free.
What this grant of permission means
Manchester granted permission on 3 August 2012, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Victoria Wine Co Ltd 98 Portway Manchester M22 1SH
Installation of illuminated signage to automated telling machine (ATM)
Granted Advertising 11 docs -
Portway Street Works Portway Manchester M22 1GS
Prior approval application for the installation of a 15m high telecommunications mast and associated equipment cabinets.
Granted Prior approval 10 docs -
5 Pitchcombe Road Manchester M22 1QZ
Erection of part single, part 2-storey rear extension to form additional living accommodation together with elevational alterations to the front.
Granted Householder Extension 4 docsDomestic -
20 Barrowfield Road Manchester M22 1RT
Prior Approval Notification for the erection of single storey rear extension extending beyond rear wall by 3.5 metres, a maximum height of 3.5 metres and height at eaves of 3.0 metres
Decided Prior approval Extension 3 docsSmall domestic -
18 Pitchcombe Road Manchester M22 1QZ
Erection of a single storey rear extension to form additional living accommodation
Granted Householder Extension 9 docsSmall domestic -
24 Plowden Road Manchester M22 1QY
Erection of a single-storey rear extension following demolition of existing outbuilding.
Granted Householder Extension Demolition 5 docsSmall domestic
Other full applications
In Manchester
-
PLA-2026-001843 Granted
Flat 75 Chepstow House 16-20 Chepstow Street Manchester M1 5JF
Installation of 4 skylights.
-
PLA-2026-000242 Withdrawn
Land to the north of 4 and 6 Mansfield Avenue Manchester M9 6RJ
Erection of 2 semi-detached family dwellinghouses (Use Class C3(a)) with associated, landscaping and boundary treatment and parking spaces.
-
PLA-2026-000622 Granted
Sainsburys's Heaton Park Retail Park Heaton Park Road Manchester M9 0QS
Installation of a We Buy Any Car customer pod (sui generis use) with associated allocated car parking and PV panels to the roof of the sales pod
-
145548/FO/2026 Refused
Land Adjacent To 4 Neswick Walk Manchester M23 0HY
Erection of two-storey detached dwellinghouse incorporationg rear roof dormer (Class C3) with associated landscaping.
-
PLA-2026-001186 Granted
St Pauls RC High School Firbank Road Manchester M23 2YS
Installation of modular classroom building.