Skip to content
PlanIndex Get alerts
Menu

Planning application

52 Avondale Road Luton LU1 1DJ

Granted Luton 26/00278/FUL Full Application

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Erection of a single storey side extension, conversion of external storage room to an indoor playroom and erection of a roof enclosure to create an outdoor playing area.

As published by the council, reference 26/00278/FUL

Application record

Reference
26/00278/FUL
Type
Full Application
Status
PER - Application Permitted
Decision
Application Permitted
Received
19 Mar 2026
Validated
8 Apr 2026
Decided
27 May 2026
Ward
DALLOW
Decision by
Delegated Decision
Postcode
LU1 1DJ

Timeline

Dates from the published record

  1. 19 Mar 2026

    Received by Luton

  2. 8 Apr 2026

    Validated

    Checked as complete and ready for consideration.

  3. 27 May 2026

    Decision issued: Application Permitted

  4. 19 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

16 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 6 Avondale Road Luton LU1 1DJ

    26/00429/FUL Submitted 27 Apr 2026 0m away

    Conversion and change of use of 6 person House in Multiple Occupation (HMO) Class C4 to 7 person large HMO (Sui-Generis)

    Refused Full applications 11 docs
  • 52 Avondale Road Luton LU1 1DJ

    26/00604/DOC Submitted 8 Jun 2026 2m away

    97% historically approved · decision due ~3 Aug

    Erection of a single storey side extension, conversion of external storage room to an indoor playroom and erection of a roof enclosure to create an outdoor playing area. Discharge of conditions 3 (Construction Management Statement) and 6 (Acoustic Treatment) of Planning permission 26/00278/FUL dated 27 May 2026.

    Decided Conditions Extension
    Small domestic
  • 104A Dunstable Road Luton LU1 1EW

    19/01372/RETRES Submitted 10 Oct 2019 134m away

    Request for Prior Approval Class M of Part 3 of Schedule 2 of the Town and Country Planning (General Permitted Development) Order 2015 - Change of use of a building from shops (Class A1), financial and professional Services to Dwellinghouses (Class C3) with associated building operations. Part of First Floor to a one bed flat.

    Granted 7 docs
  • 108 -112 Dunstable Road Luton LU1 1EW

    22/01491/FUL Submitted 18 Nov 2022 146m away

    Erection of single storey front extension and change of roller shutters

    Refused Full applications Extension 13 docs
    Small domestic
  • Pavement Outside 50 Dunstable Road Luton LU1 1EF

    22/01606/DOC Submitted 13 Dec 2022 167m away

    Installation of one new BT Street Hub after the removal of associated BT kiosk(s). Discharge of condition 3 (construction and future maintenance plan) of planning permission 22/00796/FUL dated 1st September 2022.

    Granted Conditions 8 docs
  • 120 Dunstable Road Luton LU1 1EW

    23/00116/PACOM Submitted 26 Jan 2023 171m away

    Request for a determination as to whether prior approval is required under Schedule 2, Part 3, Class MA of the Town and Country Planning (General Permitted Development) Order 2015 - Change of use of commercial floor space (Class E) to 1 one-bedroom flat on ground floor (Class C3)

    Granted 5 docs

In Luton

  • 26/00311/FULHH Withdrawn

    66 Hart Hill Drive Luton LU2 0AY

    Erection of single storey front, side conservatory, changing front roof from hip to gable end and raising of roof with two rear dormers, one rear and two front rooflights to facilitate a first floor extension

    30 Mar 2026 Full applications
  • 26/00224/FULHH Granted

    14 Shelley Road Luton LU4 0JA

    Erection of single storey side/rear extension together with access ramp to front and rear.

    3 Mar 2026 Full applications
  • 26/00470/FULHH Granted

    10 Rackham Drive Luton LU3 2AF

    Erection of a single storey rear extension

    5 May 2026 Full applications
  • 26/00129/FULHH Granted

    312 Old Bedford Road Luton LU2 7EJ

    Erection of a single and two storey rear extensions, roof alterations including the installation of three rear dormer windows and three front and four side rooflights.

    4 Feb 2026 Full applications
  • 26/00303/FUL Granted

    122 Ashcroft Road Luton LU2 9AX

    Erection of two x 4 bedroom dwellinghouses.

    27 Mar 2026 Full applications