Planning application

122 Oakley Road Luton LU4 9PZ

Granted Luton 26/00271/FULHH FUL Household

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Erection of a single storey rear and side extension with a front canopy.

As published by the council, reference 26/00271/FULHH

Application record

Reference
26/00271/FULHH
Type
FUL Household
Status
PER - Application Permitted
Decision
Application Permitted
Received
18 Mar 2026
Validated
7 Apr 2026
Decided
15 Jun 2026
Ward
CHALLNEY
Decision by
Delegated Decision
Postcode
LU4 9PZ

Timeline

Dates from the published record

  1. 18 Mar 2026

    Received by Luton

  2. 7 Apr 2026

    Validated

    Checked as complete and ready for consideration.

  3. 15 Jun 2026

    Decision issued: Application Permitted

  4. 19 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

8 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 57 Oakley Road Luton LU4 9PX

    24/01151/MMAMD Submitted 8 Oct 2024 95m away

    Change of Use from Dwellinghouse (Class C3) to Residential Institution (Class C2). Minor Material amendment of planning permission 16/01446/COU dated 18th August 2016. (new ground floor rear extension, altering external appearance by changing, adding or removing doors and windows and increasing number of residents from 3-5)

    Granted Amendments Extension Windows or glazing 8 docs
    Domestic
  • 127 Chester Avenue Luton LU4 9SH

    26/00883/PARES Submitted 19 Aug 2026 103m away

    82% historically approved · decision due ~14 Oct

    Request for a determination as to whether prior approval is required under Part 1 Class A of the Town and Country Planning (General Permitted Development) Order 2015 - Single storey rear extension. Depth 5.0m, Maximum height of extension 3.55m, Height to eaves 2.80m.

    Awaiting decision Extension 7 docs
    Small domestic
  • 4 Wyvern Close Luton LU4 9SX

    23/00827/FULHH Submitted 17 Jul 2023 158m away

    Erection of single storey rear and side extensions.

    Decided Full applications Extension 5 docs
    Small domestic
  • 158B Chester Avenue Luton LU4 9SH

    24/00885/FUL Submitted 25 Jul 2024 160m away

    Conversion and Change of use from Shop (former A1) to Restaurant E(b), erection of the mechanical extractor system to the rear and mitigation measures on the roof and associated internal alterations.

    Refused Full applications 12 docs
  • 49 Oakley Road Luton LU4 9PT

    22/01591/DOC Submitted 9 Dec 2022 166m away

    Erection of 2 three-bedroom and 2 two-bedroom semi-detached chalet bungalows with associated external works. Discharge of Conditions 5 (Management plan), 6 (Landscape scheme - hard and soft), 17 (Bin stores) of planning permission 20/00483/FUL dated 25th June 2020.

    Granted Conditions 8 docs
  • 49 Oakley Road Luton LU4 9PT

    21/00640/FUL Submitted 5 May 2021 168m away

    Erection of five dwelling houses (three 3-bed terraces and two 3-bed semi-detached), access, landscaping, and parking and associated works

    Refused Full applications 27 docs
    Several homes

In Luton

  • 26/00311/FULHH Withdrawn

    66 Hart Hill Drive Luton LU2 0AY

    Erection of single storey front, side conservatory, changing front roof from hip to gable end and raising of roof with two rear dormers, one rear and two front rooflights to facilitate a first floor extension

    30 Mar 2026 Full applications
  • 26/00224/FULHH Granted

    14 Shelley Road Luton LU4 0JA

    Erection of single storey side/rear extension together with access ramp to front and rear.

    3 Mar 2026 Full applications
  • 26/00470/FULHH Granted

    10 Rackham Drive Luton LU3 2AF

    Erection of a single storey rear extension

    5 May 2026 Full applications
  • 26/00129/FULHH Granted

    312 Old Bedford Road Luton LU2 7EJ

    Erection of a single and two storey rear extensions, roof alterations including the installation of three rear dormer windows and three front and four side rooflights.

    4 Feb 2026 Full applications
  • 26/00303/FUL Granted

    122 Ashcroft Road Luton LU2 9AX

    Erection of two x 4 bedroom dwellinghouses.

    27 Mar 2026 Full applications