Skip to content
PlanIndex Get alerts
Menu

Planning application

11 Culverhouse Road Luton LU3 1PX

Granted Luton 26/00240/FULHH FUL Household

Works: Extension Demolition Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Erection of a single storey side/rear extension after demolition of existing conservatory and rear outbuilding

As published by the council, reference 26/00240/FULHH

Application record

Reference
26/00240/FULHH
Type
FUL Household
Status
PER - Application Permitted
Decision
Application Permitted
Received
9 Mar 2026
Validated
15 Apr 2026
Decided
9 Jun 2026
Ward
SAINTS
Decision by
Delegated Decision
Postcode
LU3 1PX

Timeline

Dates from the published record

  1. 9 Mar 2026

    Received by Luton

  2. 15 Apr 2026

    Validated

    Checked as complete and ready for consideration.

  3. 9 Jun 2026

    Decision issued: Application Permitted

  4. 19 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

10 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 4 St Bernards Close Luton LU3 1QF

    21/00592/FULHH Submitted 27 Apr 2021 88m away

    Erection of a single storey front extension

    Granted Full applications Extension 10 docs
    Small domestic
  • 78 Cranleigh Gardens Luton LU3 1LT

    21/00722/FULHH Submitted 21 May 2021 108m away

    Erection of side extension to garage following part demolition.

    Withdrawn Full applications Extension Demolition 7 docs
  • 78 Cranleigh Gardens Luton LU3 1LT

    21/00723/LAWP Submitted 21 May 2021 108m away

    Erection of a single storey side extension.

    Granted Lawful development Extension 8 docs
    Small domestic
  • 37 Montrose Avenue Luton LU3 1HP

    26/00457/FULHH Submitted 4 May 2026 167m away

    76% historically approved · decision due ~29 Jun

    Conversion of existing garage to a detached annexe, including an increase in eaves height and associated changes to fenestration.

    Awaiting decision Full applications Windows or glazing 5 docs
  • 45 Cranleigh Gardens Luton LU3 1LS

    26/00761/FULHH Submitted 16 Jul 2026 174m away

    82% historically approved · decision due ~10 Sep

    Erection of a single storey rear extension and alteration to fenestration.

    Awaiting decision Extension Windows or glazing
    Small domestic
  • 44 Fountains Road Luton LU3 1LU

    23/00041/FULHH Submitted 13 Jan 2023 191m away

    Erection of first floor side extension and single storey side and rear extensions

    Granted Full applications Extension 10 docs
    Small domestic

In Luton

  • 26/00311/FULHH Withdrawn

    66 Hart Hill Drive Luton LU2 0AY

    Erection of single storey front, side conservatory, changing front roof from hip to gable end and raising of roof with two rear dormers, one rear and two front rooflights to facilitate a first floor extension

    30 Mar 2026 Full applications
  • 26/00224/FULHH Granted

    14 Shelley Road Luton LU4 0JA

    Erection of single storey side/rear extension together with access ramp to front and rear.

    3 Mar 2026 Full applications
  • 26/00470/FULHH Granted

    10 Rackham Drive Luton LU3 2AF

    Erection of a single storey rear extension

    5 May 2026 Full applications
  • 26/00129/FULHH Granted

    312 Old Bedford Road Luton LU2 7EJ

    Erection of a single and two storey rear extensions, roof alterations including the installation of three rear dormer windows and three front and four side rooflights.

    4 Feb 2026 Full applications
  • 26/00303/FUL Granted

    122 Ashcroft Road Luton LU2 9AX

    Erection of two x 4 bedroom dwellinghouses.

    27 Mar 2026 Full applications