Planning application
34 Faringdon Road Luton LU4 0EB
Works: Extension Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Erection of a single storey side and rear extension after removal of existing store
As published by the council, reference 26/00154/FULHH
Application record
- Reference
- 26/00154/FULHH
- Type
- FUL Household
- Status
- PER - Application Permitted
- Decision
- Application Permitted
- Received
- 11 Feb 2026
- Validated
- 16 Mar 2026
- Decided
- 15 Jun 2026
- Ward
- CHALLNEY
- Decision by
- Delegated Decision
- Postcode
- LU4 0EB
Timeline
Dates from the published record
-
11 Feb 2026
Received by Luton
-
16 Mar 2026
Validated
Checked as complete and ready for consideration.
-
15 Jun 2026
Decision issued: Application Permitted
-
19 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
12 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
54 Faringdon Road Luton LU4 0ED
Certificate of lawfulness of existing use - Erection of a rear outbuilding for use as gym/games room.
Granted Lawful development 5 docs -
Luton And Dunstable Hospital Lewsey Road Luton LU4 0DZ
Redevelopment and extension of the Hospital's urgent and emergency care department and main entrance, including new vehicular and pedestrian access, landscaping and associated works following the demolition of existing structures. Discharge of condition 3 (materials) of planning permission 20/01610/FUL dated 19th March 2021.
Granted Conditions Extension Demolition 5 docs -
Luton And Dunstable Hospital Lewsey Road Luton LU4 0DZ
Erection of an energy centre to comprise a two storey building, roof plant, chimney stack and underground tanks, with reconfiguration of car parking arrangements, construction of a new access/egress and additional planting and landscaping following the demolition of three existing buildings (Blocks 11, 17 & 83) - Minor Material Amendments to Planning Permission No. 19/01098/FUL dated 9th January 2020. Discharge of condition 4 (materials) of planning permission 20/00675/MMAMD dated 30th July 2020.
Granted Conditions Demolition 7 docs -
90 Lime Avenue Luton LU4 0EF
Erection of single storey side extension
Granted Full applications Extension 7 docsSmall domestic -
4 Lewsey Road Luton LU4 0EW
Certificate of Lawfulness of Proposed Development: Erection of a rear dormer window to facilitate a loft conversion and alterations to fenestration.
Withdrawn Lawful development Loft or dormer Windows or glazing 6 docs -
Front Of Properties 35 And 47 Lime Avenue, Luton LU4 0EF
Works to Trees: T1 Lime - Pollard by 3-4m back to previous to maintain canopy size and sever Ivy at base . T2 Lime- Pollard by 2-3m back to previous to maintain canopy size.
Granted Trees 9 docs
Other full applications applications
In Luton
-
26/00311/FULHH Withdrawn
66 Hart Hill Drive Luton LU2 0AY
Erection of single storey front, side conservatory, changing front roof from hip to gable end and raising of roof with two rear dormers, one rear and two front rooflights to facilitate a first floor extension
-
26/00224/FULHH Granted
14 Shelley Road Luton LU4 0JA
Erection of single storey side/rear extension together with access ramp to front and rear.
-
26/00470/FULHH Granted
10 Rackham Drive Luton LU3 2AF
Erection of a single storey rear extension
-
26/00129/FULHH Granted
312 Old Bedford Road Luton LU2 7EJ
Erection of a single and two storey rear extensions, roof alterations including the installation of three rear dormer windows and three front and four side rooflights.
-
26/00303/FUL Granted
122 Ashcroft Road Luton LU2 9AX
Erection of two x 4 bedroom dwellinghouses.