Planning application
109 St Ethelbert Avenue Luton LU3 1QW
Works: Extension Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Request for a determination as to whether prior approval is required under Part 1 Class A of the Town and Country Planning (General Permitted Development) Order 2015 - Single storey rear extension. Depth 6.0m, Maximum height of extension 4.0m, Height to eaves 3.0m.
As published by the council, reference 24/00943/PARES
Application record
- Reference
- 24/00943/PARES
- Type
- Prior - Larger Household Extensions
- Status
- Not Required
- Decision
- Prior Approval Not Required
- Received
- 9 Aug 2024
- Validated
- 16 Aug 2024
- Decided
- 27 Sep 2024
- Ward
- SAINTS
- Decision by
- Letter response
- Postcode
- LU3 1QW
Timeline
Dates from the published record
-
9 Aug 2024
Received by Luton
-
16 Aug 2024
Validated
Checked as complete and ready for consideration.
-
27 Sep 2024
Decision issued: Prior Approval Not Required
-
19 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
3 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
64 St Winifreds Avenue Luton LU3 1QT
Erection of single storey side and single storey rear extension with velux window and alterations to fenestration.
Granted Full applications Extension Loft or dormer +1 6 docsSmall domestic -
135 St Ethelbert Avenue Luton LU3 1QW
Erection of two storey and single storey rear extensions, 2 x front rooflights and rear dormer window to facilitate loft conversion and erection of rear outbuilding.
Refused Full applications Extension Loft or dormer +1 19 docsSmall domestic -
50 St Winifreds Avenue Luton LU3 1QT
Erection of a two storey side and single storey rear extension - Removal of Condition No. 03 (garage conversion into habitable room) of Planning Permission No. 98/00322/FUL dated 25th February 1998.
Granted Amendments Extension 7 docsSmall domestic -
45 St Lawrence Avenue Luton LU3 1QS
Erection of single storey side and rear extension
Granted Full applications Extension 11 docsSmall domestic -
38 St Ethelbert Avenue Luton LU3 1QJ
82% historically approved · decision due ~22 Sep
Erection of single and two storey side and rear extension.
Awaiting decision Extension -
44 St Winifreds Avenue Luton LU3 1QT
Request for a determination as to whether prior approval is required under Part 1 Class A of the Town and Country Planning (General Permitted Development) Order 2015 - Single storey rear extension. Depth 4.50m, Maximum height of extension 4.0m, Height to eaves 3.0m.
Granted Full applications Extension 3 docsSmall domestic
Other full applications applications
In Luton
-
26/00311/FULHH Withdrawn
66 Hart Hill Drive Luton LU2 0AY
Erection of single storey front, side conservatory, changing front roof from hip to gable end and raising of roof with two rear dormers, one rear and two front rooflights to facilitate a first floor extension
-
26/00224/FULHH Granted
14 Shelley Road Luton LU4 0JA
Erection of single storey side/rear extension together with access ramp to front and rear.
-
26/00470/FULHH Granted
10 Rackham Drive Luton LU3 2AF
Erection of a single storey rear extension
-
26/00129/FULHH Granted
312 Old Bedford Road Luton LU2 7EJ
Erection of a single and two storey rear extensions, roof alterations including the installation of three rear dormer windows and three front and four side rooflights.
-
26/00303/FUL Granted
122 Ashcroft Road Luton LU2 9AX
Erection of two x 4 bedroom dwellinghouses.