Planning application

Car Park 37 - 41 Cheapside Luton

Awaiting decision Luton 24/00800/DOC Conditions

Works: New dwelling Demolition Major scheme

Read from the description, not a valuation. How we read the register

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Erection of a three and five-storey building comprising 28 flats (12 one-bedroom and 16 two-bedroom), six commercial units (Class E), gym (Class E), and basement level (gym, storage and servicing), together with the de-culverting of the River Lea to create a new public thoroughfare and space, following demolition of car park and associated structures. Discharge of conditions 3 (Construction Environmental Method Plan), 20 (Detailed designs of the de-culverted section), 21 (Surface water drainage strategy ),25 (Noise impact assessment), 28 (Desktop study), 29 (Intrusive Phase 2 site investigation report ) and 30 (Remediation strategy ) of Planning permission 21/00047/FUL dated 27th May 2022.

As published by the council, reference 24/00800/DOC

Application record

Reference
24/00800/DOC
Category
Conditions
Status
Unknown
Received
2 Jul 2024
Validated
2 Jul 2024
Ward
SOUTH
Decision by
Delegated Decision

Site history

Applications at this address on the Luton register

This site has had 2 applications since 2024.

  • 26/00675/LAWE Decided

    Car Park 37 - 41 Cheapside Luton

    Certificate of lawfulness of existing use - Existing building works/material operations undertaken for the purpose of implementing planning permission 21/00047/FUL at Car Park 37-41 Cheapside, Luton, LU1 2HN. The works include site enclosure/security fencing, discontinuance of the previous car park use, setting out/laying out of the site/building footprint, site access arrangements and drainage-related works. The certificate is sought to confirm that the approved development has been lawfully commenced and that planning permission 21/00047/FUL remains extant.

    Submitted 24 Jun 2026

Timeline

Dates from the published record

  1. 2 Jul 2024

    Received by Luton

  2. 22 Sep 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 27 August 2024, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Luton took a median of 73 days over the applications it decided in the last year.

Cases linked to this one on the register

  • Application: 21/00047/FUL (PER - Application Permitted)

Documents

Plans, drawings, consultee responses and the officer's report

64 documents on file for this application

  • ENVIRONMENTAL PROTECTION Comment - Consultee · 09 Jul 2026
  • Remediation strategy Current Docs - AMENDED · 03 Jul 2026
  • 142526 - ACOUSTIC REPORT Current Docs - AMENDED · 14 Jul 2025
  • 592425 REV A - ACOUSTIC REPORT Current Docs - SUPERSEDED · 27 Jun 2025
  • DC42 - ACOUSTIC SURVEY AND NOISE MONITORING COMPLIANCE Current Docs - SUPERSEDED · 27 Jun 2025
  • DC41 - Dust Cover Letter 2 Current Docs - ADDITIONAL · 13 Jun 2025
  • DC42 - Dust Assessment & Management report - Supplementary Current Docs - ADDITIONAL · 13 Jun 2025
  • DC01 - CON 3 - Construction Environmental Method Statement Current Docs - AMENDED · 28 May 2025
  • DC07 - CON 25 - NOISE IMPACT ASSESSMENT Current Docs - SUPERSEDED · 28 May 2025
  • DC38 - Con 3 - Method Statement Current Docs - AMENDED · 28 May 2025
  • DC39 - Con 3 - Dust Cover Letter Current Docs - ADDITIONAL · 28 May 2025
  • DC40 - Con 3 - Dust Assessment Current Docs - ADDITIONAL · 28 May 2025
  • DC36 - Con 3 - ASBESTOS SURVEY Current Docs - AMENDED · 28 May 2025
  • DC01 - CON 3 - CONSTRUCTION ENVIRONMENTAL METHOD STATEMENT Current Docs - SUPERSEDED · 08 May 2025
  • DC36 - CON 3 - ASBESTOS SURVEY Current Docs - SUPERSEDED · 29 Apr 2025
  • DC01 - CON 3 - CONSTRUCTION ENVIRONMENTAL METHOD STATEMENT Current Docs - SUPERSEDED · 29 Apr 2025
  • DC38 - CON 3 - METHOD STATEMENT Current Docs - SUPERSEDED · 29 Apr 2025
  • DC07 - CON 25 - NOISE IMPACT ASSESSMENT Current Docs - SUPERSEDED · 29 Apr 2025
  • DC01 - CON 3 - CONSTRUCTION ENVIRONMENTAL METHOD STATEMENT Current Docs - SUPERSEDED · 22 Apr 2025
  • DC35 - CON 29, 30 - Response to consultation comments Current Docs - ADDITIONAL · 22 Apr 2025
  • DC07 - CON 25 - NOISE IMPACT ASSESSMENT Current Docs - SUPERSEDED · 22 Apr 2025
  • SWMP-01 - CON 21 - CHEAPSIDE_R.01_SUDS MAINTENANCE & MANAGEMENT SCHEDULE Current Docs - AMENDED · 25 Mar 2025
  • LM20010-DR-C-XX--500_P2 - CON 21 - DETAILED DRAINAGE STRATEGY PLAN Current Docs - AMENDED · 25 Mar 2025
  • DC34 - CON 21 - HYDRAULIC CALCULATIONS Current Docs - AMENDED · 25 Mar 2025
  • DC07 - CON 25 - NOISE IMPACT ASSESSMENT Current Docs - SUPERSEDED · 20 Mar 2025
  • DC33 - Response to Environmental Protection Comments Current Docs - ADDITIONAL · 20 Mar 2025
  • SWMP-01 - CON 21 - CHEAPSIDE_SUDS MAINTENANCE & MANAGEMENT SCHEDULE Current Docs - SUPERSEDED · 03 Feb 2025
  • LM20010-DR-C-XX--50 - CON 21 - DETAILED DRAINAGE STRATEGY PLAN Current Docs - SUPERSEDED · 03 Feb 2025
  • DC33 - CON 21 - HYDRAULIC CALCULATIONS Current Docs - SUPERSEDED · 03 Feb 2025
  • ENVIRONMENTAL AGENCY Comment - Consultee · 02 Oct 2024
  • Environmental Protection Air Quality comments Comment - Consultee · 13 Aug 2024
  • APPLICATION FORM Application Form · 10 Jul 2024
  • FEE CALCULATION Current Docs · 10 Jul 2024
  • DC01 - CON 3 - CONSTRUCTION ENVIRONMENTAL METHOD PLAN Current Docs - SUPERSEDED · 10 Jul 2024
  • DC05 - CON 21 - DRAINAGE STRATEGY AND SUDS ASSESSMENT Current Docs · 10 Jul 2024
  • DC06 - CON 24 - SCHEME FOR THE PRODUCTION OF RENEWABLE ENERGY Current Docs · 10 Jul 2024
  • DC07 - CON 25 - NOISE IMPACT ASSESSMENT REPORT Current Docs - SUPERSEDED · 10 Jul 2024
  • DC02 - CON 9 - SAMPLES OF MATERIALS PART 1 Current Docs · 10 Jul 2024
  • DC03 - CON 9 - SAMPLE OF MATERIALS PART 2 Current Docs · 10 Jul 2024
  • DC08 - CON 28 - SOIL REPORT DESKTOP STUDY PART 1 Current Docs · 10 Jul 2024
  • DC10 - CON 28 - SOIL REPORT DESKTOP STUDY - PART 2 Current Docs · 10 Jul 2024
  • DC17 - CON 29 - PHASE II DESKTOP STUDY -PART 1 Current Docs · 10 Jul 2024
  • DC19 - CON 29 - PHASE II DESKTOP STUDY - PART 2 Current Docs · 10 Jul 2024
  • DC09 - CON 28 -SOIL REPORT DESKTOP STUDY - PART 1 (1) Current Docs · 10 Jul 2024
  • DC11 - CON 28 -SOIL REPORT DESKTOP STUDY - PART 2 (1) Current Docs · 10 Jul 2024
  • DC12 - CON 28 - SOIL REPORT DESKTOP STUDY - PART 3 (1) Current Docs · 10 Jul 2024
  • DC13 - CON 28 -SOIL REPORT DESKTOP STUDY - PART 4 (1) Current Docs · 10 Jul 2024
  • DC14 - CON 28 -SOIL REPORT DESKTOP STUDY - PART 5 Current Docs · 10 Jul 2024
  • DC15 - CON 28 -SOIL REPORT DESKTOP STUDY - PART 6 Current Docs · 10 Jul 2024
  • DC18 - CON 29 - PHASE II DESKTOP STUDY - PART 1 (1) Current Docs · 10 Jul 2024
  • DC20 - CON 29 - PHASE II DESKTOP STUDY - PART 2 (1) Current Docs · 10 Jul 2024
  • DC21 - CON 29 - PHASE II DESKTOP STUDY - PART 3 (1) Current Docs · 10 Jul 2024
  • DC22 - CON 29 - PHASE II DESKTOP STUDY - PART 4 (1) Current Docs · 10 Jul 2024
  • DC23 - CON 29 -PHASE II DESKTOP STUDY - PART 5 Current Docs · 10 Jul 2024
  • DC24 - CON 29 -PHASE II DESKTOP STUDY - PART 6 Current Docs · 10 Jul 2024
  • DC25 - COND 29 -PHASE II DESKTOP STUDY - PART 7 Current Docs · 10 Jul 2024
  • DC26 - CON 30 - REMEDIATION STUDY PART 1 (1) Current Docs · 10 Jul 2024
  • DC27 - CON 30 - REMEDIATION STUDY PART 2 Current Docs · 10 Jul 2024
  • DC28 - CON 30 - REMEDIATION STUDY PART 3 (2) Current Docs · 10 Jul 2024
  • DC29 - CON 30 - REMEDIATION STUDY PART 4 Current Docs · 10 Jul 2024
  • DC30 - CON 30 - REMEDIATION STUDY PART 5 Current Docs · 10 Jul 2024
  • DC31 - CON 30 - REMEDIATION STUDY PART 6 Current Docs · 10 Jul 2024
  • DC32 - CON 30 - REMEDIATION STUDY PART 7 Current Docs · 10 Jul 2024
  • DC04 - CON 20 - DESIGN OF THE RIVER LEA Current Docs · 10 Jul 2024

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Luton for determination, against a statutory target of eight weeks. Over the last year Luton decided condition discharge and variation applications in a median of 64 days. More in our guide to how long planning decisions take.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

In Luton

  • 26/00961/DOC Awaiting decision

    Butterfield Great Marlings Luton LU2 8DL

    Development of land for mixed use development - Outline Planning Application, with all matters reserved, for the delivery of flexible commercial units (Class E(g)(ii), E(g)(iii), B2 and B8 uses), alongside parking, landscaping and other associated works. Discharge of Condition No. 21 (Refuse and Recycling Details) of Planning Permission No. 23/01319/OUT dated 5th September 2024.

    Received 17 Sep, published by the council 23 Sep 2026 Conditions
  • 26/00796/DOC Granted

    93 Stockingstone Road Luton LU2 7NE

    Alterations to ground floor from beauty salon to office (Class E) and conversion of first floor office space (ClassE) into a one two bedroom flat (Class C3). Discharge of conditions 4 (Bin Sorage Area), 5 (Electric Charging Point) and 6 (Sound Insulation) of Planning permission 26/01214/FUL dated 26 January 2026.

    Received 21 Jul, published by the council 28 Jul 2026 Conditions
  • 26/00949/DOC Awaiting decision

    2-4 Seymour Avenue Luton LU1 3NR

    Demolition of existing dwelling No. 4 Seymour Avenue and existing garage block to the west of the site and the erection of two and half storey building to provide 3 flats (2 x 2 bed and 1 x1 bed) with associated amenity space and surface parking area. Discharge of condition 14 (Noise Assessment & Acoustic Detail Report) of Planning permission 25/00548/FUL dated 21 November 2025.

    Received 11 Sep, published by the council 17 Sep 2026 Conditions
  • 26/00945/DOC Awaiting decision

    122 Ashcroft Road Luton LU2 9AX

    Erection of two x 4 bedroom dwellinghouses. Discharge of conditions 3 (Construction Method Statement), 5 (Habitat Management and Monitoring Plan) and 6 (Materials) of Planning permission 26/00303/FUL dated 13 August 2026.

    Received 10 Sep, published by the council 17 Sep 2026 Conditions
  • 26/00827/DOC Granted

    Lewsey Community Centre Landrace Road Luton LU4 0SW

    External alterations and relocation of the existing front entrance, new brick pillar and windows to support internal hall partition, blocking up of existing door opening, widening of existing door opening and installation of new roof lights. New render to match existing in areas shown and painting of existing render off-white cream. External works including new steps and ramp to support new entrance relocation. Discharge of condition 4 (Construction Method Statement) of Planning permission 24/00076/FUL dated 2 April 2024.

    Received 6 Aug, published by the council 11 Aug 2026 Conditions