Planning application
37 Orchard Way Luton LU4 9LT
Works: Demolition Domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Erection of 2 three bedroom dwellinghouses after demolition of existing dwellinghouse and change of use of grass verge to hardstanding/vehicle crossovers
As published by the council, reference 24/00733/FUL
Application record
- Reference
- 24/00733/FUL
- Type
- Full Application
- Status
- PER - Application Permitted
- Decision
- Application Permitted
- Received
- 13 Jun 2024
- Validated
- 26 Jul 2024
- Decided
- 24 Sep 2024
- Ward
- LEAGRAVE
- Decision by
- Delegated Decision
- Postcode
- LU4 9LT
Timeline
Dates from the published record
-
13 Jun 2024
Received by Luton
-
26 Jul 2024
Validated
Checked as complete and ready for consideration.
-
24 Sep 2024
Decision issued: Application Permitted
-
19 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
14 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
20 Orchard Way Luton LU4 9LT
82% historically approved · decision due ~14 Aug
Erection of a two storey side/rear extension. Non-Material Amendment of planning permission 21/01786/FULHH dated 23rd December 2021 (Alterations to stairs and installation of handrail)
Decided Extension -
The Orchard Centre Strangers Way Luton LU4 9ND
Development of Land for Residential Purposes - Erection of 48 residential units after demolition of existing Orchard Centre. - Discharge of Condition No. 06 (Mangement Plan) of Planning Permission No. 17/00791/OUT dated 17th October 2019
Granted Conditions Demolition 6 docs -
The Orchard Centre Strangers Way Luton LU4 9ND
Development of Land for Residential Purposes - Erection of 48 residential units after demolition of existing Orchard Centre. - Discharge of Condition No. 03 (Boundary Treatment) of Planning Permission No. 17/00791/OUT dated 17th October 2019
Granted Conditions Demolition 7 docs -
Lady Zia Wernher School Leagrave Strangers Way Luton LU4 9ND
Internal remodelling of the existing building along with minor elevation and fenestration changes and construction of two new extensions, parking, play and drop off area, to form Phase 2 of a new SEN school at the former Leagrave Educational Training Centre. Discharge of condition nos. 4 (Construction Management Plan); 5 (External Lighting); 7 (Boundary Treatment); 9 (Arboricultural Statement); 10 (Biodiversity); 11 (Surface Water Drainage); 12 (Additional Surface water run-off); and 13 (Landscaping) of planning permission of Planning permission 23/00957/REG3 dated 27th February 2024 and amended by planning permission 25/00914/MMAMD approved on 18th February 2026.
Granted Conditions Extension Windows or glazing 74 docs -
The Leagrave Centre Strangers Way Luton LU4 9ND
Conversion and change of use from use class E (training, conference venue and office accommodation) to use class F1 Special Education Needs (SEN) School and erection of a lobby extension with Internal & external alterations to include alterations to fenestration, gates and fences, creation of new vehicle entrance, car parking, mini bus drop off and playspace to the existing site and buildings.
Granted Other Extension Windows or glazing 48 docs -
23 Mayne Avenue Luton LU4 9LR
Erection of a single storey front, side and rear extensions following demolition of existing converted garage and rear conservatory.
Granted Full applications Extension Demolition 7 docsSmall domestic
Other full applications applications
In Luton
-
26/00311/FULHH Withdrawn
66 Hart Hill Drive Luton LU2 0AY
Erection of single storey front, side conservatory, changing front roof from hip to gable end and raising of roof with two rear dormers, one rear and two front rooflights to facilitate a first floor extension
-
26/00224/FULHH Granted
14 Shelley Road Luton LU4 0JA
Erection of single storey side/rear extension together with access ramp to front and rear.
-
26/00470/FULHH Granted
10 Rackham Drive Luton LU3 2AF
Erection of a single storey rear extension
-
26/00129/FULHH Granted
312 Old Bedford Road Luton LU2 7EJ
Erection of a single and two storey rear extensions, roof alterations including the installation of three rear dormer windows and three front and four side rooflights.
-
26/00303/FUL Granted
122 Ashcroft Road Luton LU2 9AX
Erection of two x 4 bedroom dwellinghouses.