Planning application

Duhallow Ely Way Luton LU4 9QN

Granted Luton 23/01349/FUL Full Application

Works: New dwelling Demolition Several homes

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Erection of two storey building to provide 5 flats ( 4 x 2 bedroom and 1 x 1 bedroom) with associated car parking, communal amenity space and landscaping, after demolition of existing house.

As published by the council, reference 23/01349/FUL

Application record

Reference
23/01349/FUL
Type
Full Application
Status
PER - Application Permitted
Decision
Application Permitted
Received
17 Nov 2023
Validated
24 Jan 2024
Decided
28 Oct 2024
Ward
LEAGRAVE
Decision by
Committee Decision
Postcode
LU4 9QN

Timeline

Dates from the published record

  1. 17 Nov 2023

    Received by Luton

  2. 24 Jan 2024

    Validated

    Checked as complete and ready for consideration.

  3. 28 Oct 2024

    Decision issued: Application Permitted

  4. 19 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

35 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Leagrave Lodge 91 High Street Leagrave Luton LU4 9JZ

    21/00651/FUL Submitted 7 May 2021 50m away

    Conversion and change of use on second floor from place of worship/educational establishment to student accommodation and construction of external escape staircase.

    Refused Full applications 26 docs
  • Kingfisher Filling Station 100 High Street Leagrave Luton LU4 9LQ

    22/01576/TPOS Submitted 6 Dec 2022 115m away

    Works to trees: E107/039 - Maple Tree to be felled - leaning over the building and over neighbours property causing damage.

    Withdrawn Trees 1 doc
  • Kingfisher Filling Station 100 High Street Leagrave Luton LU4 9LQ

    24/00910/ADV Submitted 30 Jul 2024 118m away

    Display of one internally illumunated digital freestanding sign.

    Granted Advertising 21 docs
  • Oakley House 213 Oakley Road Luton LU4 9QH

    22/01330/DOC Submitted 17 Oct 2022 159m away

    Redevelopment of site to provide 65 dwellings comprising 26 houses (5 four bed, 13 three bed and 8 two bed) and 39 flats (30 two bed and 9 one bed) and associated works after demolition of existing building and car park. Discharge of condition 11 (management & Maintenance Plan for drainage) of planning permission 21/00944/FUL dated 17th March 2022.

    Granted Conditions New dwelling Demolition 18 docs
    Major scheme
  • Oakley House 213 Oakley Road Luton LU4 9QH

    22/01209/DOC Submitted 22 Sep 2022 159m away

    Redevelopment of site to provide 65 dwellings comprising 26 houses (5 four bed, 13 three bed and 8 two bed) and 39 flats (30 two bed and 9 one bed) and associated works after demolition of existing building and car park. Discharge of condition 20 (Noise level) of planning permission 21/00944/FUL dated 17th March 2022.

    Granted Conditions New dwelling Demolition 5 docs
    Major scheme
  • Oakley House 213 Oakley Road Luton LU4 9QH

    22/01210/DOC Submitted 22 Sep 2022 159m away

    Redevelopment of site to provide 65 dwellings comprising 26 houses (5 four bed, 13 three bed and 8 two bed) and 39 flats (30 two bed and 9 one bed) and associated works after demolition of existing building and car park. Discharge of condition 19 (Noise Impact Assessment) of planning permission 21/00944/FUL dated 17th March 2022.

    Granted Conditions New dwelling Demolition 5 docs
    Major scheme

In Luton

  • 26/00311/FULHH Withdrawn

    66 Hart Hill Drive Luton LU2 0AY

    Erection of single storey front, side conservatory, changing front roof from hip to gable end and raising of roof with two rear dormers, one rear and two front rooflights to facilitate a first floor extension

    30 Mar 2026 Full applications
  • 26/00224/FULHH Granted

    14 Shelley Road Luton LU4 0JA

    Erection of single storey side/rear extension together with access ramp to front and rear.

    3 Mar 2026 Full applications
  • 26/00470/FULHH Granted

    10 Rackham Drive Luton LU3 2AF

    Erection of a single storey rear extension

    5 May 2026 Full applications
  • 26/00129/FULHH Granted

    312 Old Bedford Road Luton LU2 7EJ

    Erection of a single and two storey rear extensions, roof alterations including the installation of three rear dormer windows and three front and four side rooflights.

    4 Feb 2026 Full applications
  • 26/00303/FUL Granted

    122 Ashcroft Road Luton LU2 9AX

    Erection of two x 4 bedroom dwellinghouses.

    27 Mar 2026 Full applications