Planning application
6 Osborne Road Luton LU1 3HJ
Works: Extension Loft or dormer Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Erection of single/two storey side and single storey rear extensions, rear dormer and two front rooflights to facilitate a loft conversion
As published by the council, reference 22/01333/FULHH
Application record
- Reference
- 22/01333/FULHH
- Type
- FUL Household
- Status
- PER - Application Permitted
- Decision
- Granted As published: Application Permitted
- Received
- 17 Oct 2022
- Validated
- 10 Nov 2022
- Decided
- 10 Feb 2023
- Ward
- SOUTH
- Decision by
- Delegated Decision
- Postcode
- LU1 3HJ
Timeline
Dates from the published record
-
17 Oct 2022
Received by Luton
-
10 Nov 2022
Validated
Checked as complete and ready for consideration.
-
10 Feb 2023
Decision issued: Application Permitted
-
19 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Tecon Ltd Agent, registered in Middlesex
Active · incorporated 1995 · Middlesex
31 applications on PlanIndex · across 11 councils · 83% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
17 documents on file for this application
- Case Officer Report
- Decision Notice
- 205C - PROPOSED ELEVATIONS
- 204C - PROPOSED FLOOR PLANS
- DC02 - L2 FRA V2 AA
- DC01 FLOOD RISK ASSESSMENT
- 205 - PROPOSED ELEVATIONS
- 204B - PROPOSED FLOOR PLANS
- 206C - Block Plan
- APPLICATION FORM
- 11126-P-202 EXISTING FLOOR PLANS
- 11126-P-203 EXISTING ELEVATIONS
- DC01 FLOOD RISK FORM
- 201A SITE LOCATION & EXISTING BLOCK PLANS
- 11126-P-204A PROPOSED FLOOR PLANS
- 11126-P-205A PROPOSED ELEVATIONS
- 1126-P-206B BLOCK PLAN
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Luton granted permission on 10 February 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Hotel Site The Brache Leisure Complex Osborne Road Luton LU1 3HJ
Works to trees - Cut back 3m of trees (T1 - Elder, T2 - Beech, T3 - Norway Maple, T4 - Buddlea, T5 - Ash, T6 - Beech, G1 - Sycamore, G2 - Hazel)
Granted Trees 8 docs -
286 Park Street Luton LU1 3HD
82% historically approved · decision due ~13 Aug
Certificate of Lawfulness of Proposed Development - Erection of rear dormer window with two front rooflights to facilitate a change of use from dwellinghouse (Class C3) to a six person HMO. (Class C4)
Decided Loft or dormer Windows or glazing 8 docsDomestic -
222 Park Street Luton LU1 3HB
Change of use residential dwelling (Class C3) to residential care home (Class C2)
Refused Full applications 23 docsDomestic -
17 Alton Road Luton LU1 3NS
Erection of single storey rear extension
Granted Full applications Extension 7 docsSmall domestic -
57 Seymour Road Luton LU1 3NL
82% historically approved · decision due ~1 Dec
Certificate of Lawfulness of Proposed Development - Conversion of garage to habitable room
Awaiting decision 5 docs -
Prologis Park Griffin House 5 Osborne Road Luton LU1 3YT
Hybrid Planning Application for the phased demolition of all existing buildings and structures, site preparation works and the comprehensive employment-led redevelopment of the site comprising: 1) Detailed Planning Application for the construction of flexible employment floorspace (Use Classes E(g)(ii)/(iii), B2 and/or B8, with ancillary office floorspace) and all associated infrastructure works, access arrangements, internal road network, parking, and hard and soft landscaping; and 2) Outline Planning Application (with all matters reserved) for the construction of flexible employment floorspace (Use Classes E(g)(ii)/(iii), B2 and/or B8, with ancillary office floorspace), an on-site training & development facility (Use Classes E(g)(i)/F1(a)), and all associated infrastructure works, access arrangements, internal road network, parking, and hard and soft landscaping. - Approval of Reserved Matters full details of Access, Appearance, Layout, Landscaping, and Scale pursuant to Conditions 4 (Time Limits) and 5 (Reserved Matters) of Planning Permission No. 22/01334/HYBEIA dated 12th May 2023 (as they relate to Development Zone D) as amended (and superseded by LPA ref. 26/00452/MMAMD). An ES was submitted with the Hybrid Application.
Granted Reserved matters Demolition 45 docs
Other full applications
In Luton
-
26/01037/FUL Awaiting decision
126 Wilsden Avenue Luton LU1 5HR
Conversion and change of use from dwellinghouse (Use Class C3) to residential children's home (Use Class C2), for one child/young person aged 5 -18 years, with associated care staff.
-
26/00776/FUL Refused
Park House 28 Park Street Luton LU1 3ET
Installation of a commercial kitchen extraction and ventilation system to the rear
-
26/01005/FUL Awaiting decision
6 William Street Luton LU2 7RF
Installation of an ATM machine - Retrospective
-
26/00426/FUL Granted
Land Rear Of 9-13 Fallowfield Luton LU3 1UL
Erection of 3 no. 2-bedroom terraced dwellings on part of the rear garden land of Nos. 9-13 Fallowfield.
-
26/00253/FUL Granted
17 Hartley Road Luton LU2 0HX
Erection of three-storey residential building comprising 7 flats (5 x two-bedroom and (2 x one-bedroom) flats with associated landscaping after demolition of the existing industrial warehouse building.