Planning application
The Chalk Hills Academy Leagrave High Street Luton LU4 0NE
Works: Extension Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Erection of a single storey extension with a new Inclusion Provision to provide a space for all key stages. - Discharge of Condition No. 4 (Surface Water Drainage Scheme) of Planning Permission No. 20/01567/REG3 dated 22nd January 2021
As published by the council, reference 22/01226/DOC
Application record
- Reference
- 22/01226/DOC
- Type
- Discharge of Multiple Conditions
- Status
- PER - Application Permitted
- Decision
- Application Permitted
- Received
- 26 Sep 2022
- Validated
- 26 Sep 2022
- Decided
- 8 Feb 2023
- Ward
- LEWSEY
- Decision by
- Delegated Decision
- Postcode
- LU4 0NE
Timeline
Dates from the published record
-
26 Sep 2022
Received by Luton
-
8 Feb 2023
Decision issued: Application Permitted
-
19 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
9 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About conditions applications
How this application type works
This type of application deals with conditions attached to an existing permission, either by supplying the details a condition requires, called discharging it, or by asking to vary or remove one. It does not reopen the principle of the permission itself. Building often cannot lawfully start, or continue past a set stage, until the named conditions are discharged.
Nearby applications
Within 500 metres
-
The Chalk Hills Academy Leagrave High Street Luton LU4 0NE
Erection of a single storey extension with a new Inclusion Provision to provide a space for all key stages. Discharge of conditions 4 (Surface water drainage scheme) and 6 (Construction and environmental management plan) of planning permission 20/01567/REG3 dated 22nd January 2021
Refused Conditions Extension 14 docsSmall domestic -
The Chalk Hills Academy Leagrave High Street Luton LU4 0NE
Erection of a single storey extension with a new Inclusion Provision to provide a space for all key stages. Discharge of conditions 4 (Surface water drainage scheme) and 6 (Construction & environmental management plan) of Planning permission 20/01567/REG3 dated 22nd January 2021.
Decided Conditions Extension 15 docsSmall domestic -
Leagrave High Street Lewsey Farm Luton LU4 0PR
Telecommunication Installation: Installation of 18m Phase 8 Monopole C/W wrapround Cabinet at base and associated ancillary works.
Decided Telecoms 11 docs -
495 Leagrave High Street Luton LU4 0TH
Erection of single and two storey rear extension and single storey front extension, following the demolition of existing rear canopy structure, and alterations to the fenestration.
Granted Full applications Extension Demolition +1 5 docsSmall domestic -
9 Bracknell Close Luton LU4 0TL
Erection of a single storey rear extension and rear dormer window to facilitate a loft conversion.
Granted Full applications Extension Loft or dormer +1 9 docsSmall domestic -
8 Guernsey Close Luton LU4 0PR
Erection of two storey side and rear, single storey front, side and rear extensions
Refused Full applications Extension 7 docsSmall domestic
Other conditions applications
In Luton
-
26/00897/DOC Awaiting decision
Unit 2A1 Luton Retail Park Gipsy Lane Luton LU1 3JH
Installation of an external plant (HVAC) to facilitate restaurant. Discharge of condition 3 (Maintenance and Cleaning Schedule) of Planning permission 26/00600/FUL dated 7 August 2026.
-
26/00844/DOC Awaiting decision
10 Marsh Road Luton LU3 2NH
Erection of two external canopies with supporting structures. Discharge of conditions 1 (i) (a) (height & plans of acoustic fence), 1 (i) (b) (Details of two television screens) and 1 )i) (c) (Details of any extraction & ventilation system) of Planning Appeal decision APP/B0230/C/23/3333530 (20/00148/UBO) dated 10th April 2026.
-
26/00842/DOC Awaiting decision
11 New Bedford Road Luton LU1 1SA
Change of use from hair salon (Class E) to laundrette. Discharge of conditions 4 (Enhanced Sound Insulation) and 5 (Anti-vibration measures) of Planning permission 26/00142/FUL dated 14 April 2026.
-
26/00827/DOC Awaiting decision
Lewsey Community Centre Landrace Road Luton LU4 0SW
External alternations and relocation of the existing front entrance, new brick pillar and windows to support internal hall partition, blocking up of existing door opening, widening of existing door opening and installation of new roof lights. New render to match existing in areas shown and painting of existing render off-white cream. External works including new steps and ramp to support new entrance relocation. Discharge of condition 4 (Contstruction Method Statement) of Planning permission 24/00076/FUL dated 2 April 2024.
-
26/00305/DOC Granted
Griffin House 5 Osborne Road Luton LU1 3YT
Hybrid Planning Application for the phased demolition of all existing buildings and structures, site preparation works and the comprehensive employment-led redevelopment of the site comprising: 1) Detailed Planning Application for the construction of flexible employment floorspace (Use Classes E(g)(ii)/(iii), B2 and/or B8, with ancillary office floorspace) and all associated infrastructure works, access arrangements, internal road network, parking, and hard and soft landscaping; and 2) Outline Planning Application (with all matters reserved) for the construction of flexible employment floorspace (Use Classes E(g)(ii)/(iii), B2 and/or B8, with ancillary office floorspace), an on-site training & development facility (Use Classes E(g)(i)/F1(a)), and all associated infrastructure works, access arrangements, internal road network, parking, and hard and soft landscaping. Discharge of parts of condition 14 (Contamination scheme) of Planning Permission 22/01334/HYBEIA dated 12th May 2023.