Skip to content
PlanIndex Get alerts
Menu

Planning application

34 Bishopscote Road Luton LU3 1NY

Granted Luton 21/01516/FULHH FUL Household

Works: Extension Loft or dormer Windows or glazing Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Erection of two storey and single storey rear extensions and addition of front rooflight and window in flank elevation

As published by the council, reference 21/01516/FULHH

Application record

Reference
21/01516/FULHH
Type
FUL Household
Status
PER - Application Permitted
Decision
Application Permitted
Received
27 Oct 2021
Validated
5 Nov 2021
Decided
23 Feb 2023
Ward
SAINTS
Decision by
Delegated Decision
Postcode
LU3 1NY

Timeline

Dates from the published record

  1. 27 Oct 2021

    Received by Luton

  2. 5 Nov 2021

    Validated

    Checked as complete and ready for consideration.

  3. 23 Feb 2023

    Decision issued: Application Permitted

  4. 19 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

13 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 26 Bishopscote Road Luton LU3 1NY

    21/00663/FULHH Submitted 9 May 2021 31m away

    Erection of an extension to existing rear dormer window.

    Refused Full applications Extension Loft or dormer +1 8 docs
  • 42 And 44 Bishopscote Road Luton LU3 1NY

    24/01061/FUL Submitted 10 Sep 2024 36m away

    Redevelopment of land for erection of two semi-detached two bed dwellings with two allocated parking spaces

    Refused Full applications 11 docs
  • 12 Bishopscote Road Luton LU3 1NY

    26/00212/FULHH Submitted 26 Feb 2026 89m away

    Erection of a single storey rear extension

    Granted Full applications Extension 12 docs
    Small domestic
  • 6 St Monicas Avenue Luton LU3 1PJ

    24/01013/HHFT Submitted 27 Aug 2024 106m away

    Erection of two storey side and rear and single storey rear extension. - Fast Track

    Refused Full applications Extension 13 docs
    Small domestic
  • 20 St Monicas Avenue Luton LU3 1PJ

    22/01515/FULHH Submitted 23 Nov 2022 106m away

    Erection of a single storey rear extension and alterations to the existing rear extension's roof

    Granted Full applications Extension 10 docs
    Small domestic
  • 17 Bishopscote Road Luton LU3 1NZ

    21/00863/FULHH Submitted 21 Jun 2021 110m away

    Erection of two storey side and rear extension and single storey rear extensions

    Granted Full applications Extension 12 docs
    Small domestic

In Luton

  • 26/00311/FULHH Withdrawn

    66 Hart Hill Drive Luton LU2 0AY

    Erection of single storey front, side conservatory, changing front roof from hip to gable end and raising of roof with two rear dormers, one rear and two front rooflights to facilitate a first floor extension

    30 Mar 2026 Full applications
  • 26/00224/FULHH Granted

    14 Shelley Road Luton LU4 0JA

    Erection of single storey side/rear extension together with access ramp to front and rear.

    3 Mar 2026 Full applications
  • 26/00470/FULHH Granted

    10 Rackham Drive Luton LU3 2AF

    Erection of a single storey rear extension

    5 May 2026 Full applications
  • 26/00129/FULHH Granted

    312 Old Bedford Road Luton LU2 7EJ

    Erection of a single and two storey rear extensions, roof alterations including the installation of three rear dormer windows and three front and four side rooflights.

    4 Feb 2026 Full applications
  • 26/00303/FUL Granted

    122 Ashcroft Road Luton LU2 9AX

    Erection of two x 4 bedroom dwellinghouses.

    27 Mar 2026 Full applications