Planning application
4 The Crest Luton LU3 2LE
Works: Extension Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Request for a determination as to whether prior approval is required under Part 1 Class A of the Town and Country Planning (General Permitted Development) Order 2015 - Single storey rear extension. Depth 4m, Maximum height of extension 3.1m, Height to eaves 3m.
As published by the council, reference 19/01443/RES
Application record
- Reference
- 19/01443/RES
- Type
- Prior approval (Householder)
- Status
- Not Required
- Decision
- Prior Approval Not Required
- Received
- 25 Oct 2019
- Validated
- 8 Nov 2019
- Decided
- 9 Dec 2019
- Ward
- ICKNIELD
- Decision by
- Delegated Decision
- Postcode
- LU3 2LE
Timeline
Dates from the published record
-
25 Oct 2019
Received by Luton
-
8 Nov 2019
Validated
Checked as complete and ready for consideration.
-
9 Dec 2019
Decision issued: Prior Approval Not Required
-
19 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
3 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About prior approval applications
How this application type works
Prior approval applications arise where permitted development rights already grant the principle of the work, such as larger home extensions, changes of use to housing or agricultural buildings. The council may only consider the specific matters set out in the rules, for example transport, flooding or appearance, and in many classes the work may proceed if the council does not respond within the deadline, commonly 56 days.
Nearby applications
Within 500 metres
-
4 The Crest Luton LU3 2LE
Erection of front and rear dormer windows to facilitate a loft conversion.
Granted Full applications Loft or dormer Windows or glazing 5 docs -
4 The Crest Luton LU3 2LE
Erection of front and rear dormer windows to facilitate a loft conversion. Non-Material Amendment to planning permission 19/01414/FULHH dated 30th December 2019 - Insertion of one obscured window on the side elevation of rear dormer window.
Granted Amendments Loft or dormer Windows or glazing 5 docs -
177 Icknield Way Luton LU3 2BX
Erection of a single storey front extension
Granted Full applications Extension 9 docsSmall domestic -
201 Icknield Way Luton LU3 2JL
Erection of two-storey rear and single storey side and rear extensions, all brickwork to render and alterations to fenestration
Granted Full applications Extension Windows or glazing 6 docsSmall domestic -
203 Icknield Way Luton LU3 2JL
Extension of existing vehicle crossover
Refused Full applications Extension 5 docs -
320 Icknield Way Luton LU3 2JS
82% historically approved · decision due ~2 Sep
Request for a determination as to whether prior approval is required under Part 1 Class A of the Town and Country Planning (General Permitted Development) Order 2015 - Single storey rear extension. Depth 6m, Maximum height of extension 3m, Height to eaves 3m.
Awaiting decision ExtensionSmall domestic
Other prior approval applications
In Luton
-
19/01495/RES Refused
16 Overstone Road Luton LU4 8QZ
Request for a determination as to whether prior approval is required under Part 1 Class A of the Town and Country Planning (General Permitted Development) Order 2015 - Single storey rear extension. Depth 5m, Maximum height of extension 4m, Height to eaves 3m.
-
19/01497/COM Granted
Machins Solicitors Victoria Street Luton LU1 2BS
Request for determination as to whether prior approval is required under Part 3 Class O of the Town and Country Planning (General Permitted Development) Order 2015 (as amended) - Change of use from office(s) (ClassB1(a)) to dwellings (Class C3) - 16 x flats (11 x one-bedroom & five x two-bedroom).
-
19/01442/COM Granted
Oakley House 213 Oakley Road Luton LU4 9QH
Request for determination as to whether prior approval is required under Part 3 Class O of the Town and Country Planning (General Permitted Development) Order 2015 - Change of use from office(s) (B1(a)) to (C3). 30 x one bed flats.
-
19/01473/RES Granted
16 Cranleigh Gardens Luton LU3 1LT
Request for a determination as to whether prior approval is required under Part 1 Class A of the Town and Country Planning (General Permitted Development) Order 2015 - Single storey rear extension. Depth 6m, Maximum height of extension 4m, Height to eaves 3m.
-
19/01488/RES Granted
85 Halfway Avenue Luton LU4 8RA
Request for a determination as to whether prior approval is required under Part 1 Class A of the Town and Country Planning (General Permitted Development) Order 2015 - Single storey rear extension. Depth 6m, Maximum height of extension 3.610m, Height to eaves 2.350m.