Skip to content
PlanIndex Get alerts
Menu

Planning application

42 Wanstead Road, Belfast, BT16 2EL

Awaiting decision Lisburn and Castlereagh LA05/2026/0681/F Full

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Single storey rear extension

As published by the council, reference LA05/2026/0681/F

Application record

Reference
LA05/2026/0681/F
Type
Full
Status
Valid
Received
25 Aug 2026
Validated
25 Aug 2026
Ward
Ballyhanwood
Postcode
BT16 2EL

Timeline

Dates from the published record

  1. 25 Aug 2026

    Received by Lisburn and Castlereagh

  2. 27 Aug 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 20 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Lisburn and Castlereagh took a median of 93 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Agent on file, an architecture practice registered in Holywood

3 applications on PlanIndex

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

6 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with Lisburn and Castlereagh for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 23 Old Dundonald Road, Dundonald, Belfast, BT16 2EG

    LA05/2026/0282/F Submitted 14 Apr 2026 232m away

    Proposed new First floor extension above the existing kitchen to provide a new bedroom with en suite facilities and replacement shower room. This forms an extension to the existing first floor rear return situated above the existing flat roofed kitchen, to be finished with a slated pitched roof. The walls shall be built of red brick to match the existing walls.

    Granted Full applications Extension 10 docs
  • Lands to the rear of No. 7-11 Fernedene Park, Ballymaglaff, Dundonald, BT16 2ES

    LA05/2025/0101/F Submitted 6 Feb 2025 238m away

    Proposal for 2no. detached dwellings with new vehicular access onto Comber Road

    Granted Full applications 31 docs
  • Land bounded between 19 and 21 New Line, Dundonald, BT16 1UU

    LA05/2023/0921/RM Submitted 1 Nov 2023 290m away

    The proposed construction of 2 No. two storey, detached dwellings with a shared entrance and associated site works.

    Granted Reserved matters 27 docs
  • 46a Gransha Road, Belfast, BT16 2HD

    LA05/2024/0764/F Submitted 17 Oct 2024 320m away

    Roofspace conversion

    Granted Full applications 10 docs
  • 46d Gransha Road, Belfast, BT16 2HD

    LA05/2026/0586/F Submitted 8 Jul 2026 348m away

    98% historically approved · decision due ~4 Sep

    Attic conversion

    Awaiting decision Full applications Loft or dormer 9 docs
  • Land approximately 50 meters south of 240 Comber Rd, Dundonald, Belfast BT16 2BS

    LA05/2025/0270/F Submitted 10 Apr 2025 371m away

    Wastewater Pumping Station (WwPS) including chambers and associated sewers below ground level and a Motor Control Centre (MCC) Kiosk building, telemetry and lighting columns. Other works include associated site and access works.

    Granted Full applications 40 docs

In Lisburn and Castlereagh

  • LA05/2026/0693/F Awaiting decision

    161 Dromore Road, Hillsborough, BT26 6JA

    Alterations to existing Diner (161) and Service Station Shop (163) involving Internal refits to both buildings to accommodate new franchisees. External alterations to both buildings including alterations to existing entrances, formation of a new entrance to No163, addition of feature panelling external wall treatment to both buildings, construction of an access ramp and complimentary steps to No 161.

    31 Aug 2026 Full applications
  • Lands opposite Nos. 41 - 45, 60 - 67 & 72 - 75 Ballantine Gardens, Lisburn, BT27 5FB

    Proposed amendments to planning permission S/2011/0383/F including the conversion of approved first floor domestic storage areas into two apartments, additional parking, bin store and ancillary site works

    10 Dec 2025 Full applications
  • 12 Lurganville Road, Moira, Craigavon, BT67 0PJ

    Proposed new access to existing dwelling at 12A in lieu of shared access (use of shared access to laneway to 12A to cease)

    7 Jul 2026 Full applications
  • 37 Fairfields Manor, Magheralave, Lisburn, BT28 3WA

    Attic conversion with new rear flat roof dormer

    3 Jul 2026 Full applications
  • Land approximately 50 meters south of 240 Comber Rd, Dundonald, Belfast BT16 2BS

    Wastewater Pumping Station (WwPS) including chambers and associated sewers below ground level and a Motor Control Centre (MCC) Kiosk building, telemetry and lighting columns. Other works include associated site and access works.

    10 Apr 2025 Full applications