Skip to content
PlanIndex Get alerts
Menu

Planning application

7 Killynure Road West, Belfast, BT8 8EA

Awaiting decision Lisburn and Castlereagh LA05/2026/0638/F Full

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Rear single storey extension with first floor balcony

As published by the council, reference LA05/2026/0638/F

Application record

Reference
LA05/2026/0638/F
Type
Full
Status
Consultation Open
Received
5 Aug 2026
Validated
6 Aug 2026
Ward
Carryduff East
Postcode
BT8 8EA

Timeline

Dates from the published record

  1. 5 Aug 2026

    Received by Lisburn and Castlereagh

  2. 6 Aug 2026

    Validated

    Checked as complete and ready for consideration.

  3. 14 Aug 2026

    Added to PlanIndex

  4. 27 Aug 2026

    Status changed to Consultation Open

    Previously Valid.

  5. Decision

    Awaiting decision

    Decision expected by 1 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Lisburn and Castlereagh took a median of 93 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

9 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Lisburn and Castlereagh for determination, against a statutory target of eight weeks. Over the last year Lisburn and Castlereagh decided full applications in a median of 97 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

In Lisburn and Castlereagh

  • 12 The Hermitage, Dunmurry, Belfast, BT17 9NH

    Demolition of existing sunroom to rear, construction of a single-storey rear ground floor extension, comprising of a new Kitchen/Living/Dining room. Internal reconfigurations to include a new snug/study and utility room.

    8 Oct 2025 Full applications
  • Millars Lane WwPS 5 Millmount Quarry Close, Dundonald, BT16 1YT

    A wastewater storage tank for the existing Millars Lane Wastewater Pumping Station (WwPS) including chambers and associated sewers below ground level and a water booster set, telemetry and lighting aerial above ground. Other works include a 2.4m high paladin fence, access gate and associated site and access works.

    4 Feb 2025 Full applications
  • LA05/2026/0697/F Awaiting decision

    12 Culross Place, Belfast, BT16 2SN

    Proposed single storey extension to rear

    2 Sep 2026 Full applications
  • LA05/2026/0695/F Awaiting decision

    330m East of 24 Eglantine Road, Lisburn

    Dwelling and garage to replace vacant/derelict farm buildings (formerly pig crews)

    2 Sep 2026 Full applications
  • LA05/2026/0701/F Awaiting decision

    3 Breda Park, Belfast, BT8 6JR

    Construction of a two storey extension to gable and single storey extension to rear of existing property together with associated site works and landscaping.

    2 Sep 2026 Full applications