Skip to content
PlanIndex Get alerts
Menu

Planning application

Public footpath approximately 53 metres southeast of 1 Thornhill Manor, Dunmurry

Awaiting decision Lisburn and Castlereagh LA05/2026/0614/F Full

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Proposed installation of telephone kiosk on public footpath

As published by the council, reference LA05/2026/0614/F

Application record

Reference
LA05/2026/0614/F
Type
Full
Status
Consultation Open
Received
21 Jul 2026
Validated
29 Jul 2026
Ward
Lambeg

Timeline

Dates from the published record

  1. 21 Jul 2026

    Received by Lisburn and Castlereagh

  2. 29 Jul 2026

    Validated

    Checked as complete and ready for consideration.

  3. 7 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 23 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Lisburn and Castlereagh took a median of 93 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

14 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with Lisburn and Castlereagh for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Public footpath approximately 53 metres southeast of 1 Thornhill Manor, Dunmurry

    LA05/2026/0615/A Submitted 21 Jul 2026 0m away

    98% historically approved · decision due ~23 Sep

    Proposed digital advertisement unit on rear of telephone kiosk

    Awaiting decision Advertising 9 docs
  • Public Footpath approximately 80m south east of 1 Thornhill Manor, Dunmurry

    LA05/2026/0342/A Submitted 29 Apr 2026 31m away

    Proposed digital advertisement unit on rear of telephone kiosk

    Withdrawn Advertising 9 docs
  • Public Footpath approximately 80m south east of 1 Thornhill Manor, Dunmurry

    LA05/2026/0343/F Submitted 29 Apr 2026 31m away

    Proposed installation of telephone kiosk on public footpath

    Withdrawn Full applications 16 docs
  • 283-285 Kingsway, Belfast, BT17 9EP

    LA05/2025/0422/NMC Submitted 10 Jun 2025 360m away

    81% historically approved · decision due ~5 Aug

    No material change application to planning approval LA05/2022/0043/RM: Following Non Material changes to the Elevations, 1. Removal of Chimneys. 2. Single Patio doors in lieu of Double Patio doors at Juliette Balconies (With no change to the size openings) Minor Amendments to the Site Layout to Incorporate 3 no. Bin Stores to meet Waste Management Requirements.

    Awaiting decision Amendments Windows or glazing 5 docs
  • 283 Kingsway, Belfast, BT17 9EP

    LA05/2024/0494/NMC Submitted 20 Jun 2024 360m away

    The following non-material changes to the elevations: 1. Removal of Chimneys. 2. Removal of decorative banding to bays & windows. 3. Removal of railings to juliette balconies. 4. Windows proposed in lieu of patio doors. 5. Minor amendments to floor plans to suit DPG & NIE requirements, including provision of switch rooms to be accessed externally. 6. Minor amendments to the site layout to incorporate a larger bin store to meet waste management requirements.

    Granted Amendments Windows or glazing 12 docs
  • 1 Ashley Grove, Belfast, BT17 9EA

    LA04/2025/1658/F Submitted 2 Oct 2025 366m away

    Roofspace conversion with side dormers and new windows to front and rear elevations

    Granted Full applications Loft or dormer Windows or glazing 5 docs

In Lisburn and Castlereagh

  • LA05/2026/0693/F Awaiting decision

    161 Dromore Road, Hillsborough, BT26 6JA

    Alterations to existing Diner (161) and Service Station Shop (163) involving Internal refits to both buildings to accommodate new franchisees. External alterations to both buildings including alterations to existing entrances, formation of a new entrance to No163, addition of feature panelling external wall treatment to both buildings, construction of an access ramp and complimentary steps to No 161.

    31 Aug 2026 Full applications
  • Lands opposite Nos. 41 - 45, 60 - 67 & 72 - 75 Ballantine Gardens, Lisburn, BT27 5FB

    Proposed amendments to planning permission S/2011/0383/F including the conversion of approved first floor domestic storage areas into two apartments, additional parking, bin store and ancillary site works

    10 Dec 2025 Full applications
  • 12 Lurganville Road, Moira, Craigavon, BT67 0PJ

    Proposed new access to existing dwelling at 12A in lieu of shared access (use of shared access to laneway to 12A to cease)

    7 Jul 2026 Full applications
  • 37 Fairfields Manor, Magheralave, Lisburn, BT28 3WA

    Attic conversion with new rear flat roof dormer

    3 Jul 2026 Full applications
  • Land approximately 50 meters south of 240 Comber Rd, Dundonald, Belfast BT16 2BS

    Wastewater Pumping Station (WwPS) including chambers and associated sewers below ground level and a Motor Control Centre (MCC) Kiosk building, telemetry and lighting columns. Other works include associated site and access works.

    10 Apr 2025 Full applications