Planning application
LA05/2025/0707/F
211 Moira Road, Lisburn, BT28 2SN
Proposal
Section 54 application to vary condition 14 of planning approval LA05/2022/1167/F: Original text for this condition: The development hereby permitted shall not commence until all fuel storage tanks (and associated infra-structure) are fully decommissioned and removed and the quality of surrounding soils and groundwater verified. Reason: Protection of environmental receptors to ensure the site is suitable for use. Proposed amended text for this condition: Each fuel storage tank (and all associated infra-structure) on the site, must be fully decommissioned and removed and the quality of the surrounding soils and groundwater verified, prior to demolition of each building to which they are associated. Reason: Protection of environmental receptors to ensure the site is suitable for use.
As published by the council, reference LA05/2025/0707/F
Timeline
Dates from the published record
-
1 Oct 2025
Received by Lisburn and Castlereagh
-
17 Dec 2025
Decision issued: Granted
-
29 Jul 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
LA05/2026/0461/NMC Granted
211 Moira Road, Lisburn, BT28 2SN
The wording of Conditions 2 & 5 applied to LA05/2025/0707/F, which was misapplied in error.
-
LA05/2025/0806/DC Decided
Lands adjacent and west of Eastwood Motors, 197 Moira Road, Lisburn, BT28 2SN
Discharge of Condition 8 LA05/2017/0540/F- Prior to the commencement of any of the development on site, a final drainage assessment, containing a detailed drainage network design and compliant with Annex D of PPS15 must be submitted to the Planning Authority for its consideration and approval. Reason - To safeguard against flood risk to the development and elsewhere
Other full applications applications
In Lisburn and Castlereagh
-
LA05/2026/0606/F Awaiting decision
69 Wellington Park Drive, Lisburn, BT67 0UP
Proposed rear/side extension to form family room
-
LA05/2026/0212/F Granted
9 Islandkelly Park, Lisburn, BT28 3HB
2 storey side extension and alteration to front garden to allow for parking (Amended plans)
-
LA05/2026/0182/F Granted
52 Laverys Bridge Road, Craigavon, BT67 0PQ
Erection of detached garage, conversion of existing garage to living accommodation and sun lounge extension to dwelling. (Renewal of extant permission)
-
LA05/2026/0343/F Withdrawn
Public Footpath approximately 80m south east of 1 Thornhill Manor, Dunmurry
Proposed installation of telephone kiosk on public footpath
-
LA05/2026/0598/F Awaiting decision
13 Richmond Court, Lisburn, BT27 4QU
Internal alterations and loft conversion which includes dormer extension to rear.