Skip to content
PlanIndex Get alerts
Menu

Planning application

Baronsgrange Development (under construction) Comber Road, Carryduff, BT8 8AN

Granted Lisburn and Castlereagh LA05/2024/0082/F Full

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Amendments to planning permission reference LA05/2021/0635/F: change of house type and plot boundary amendments on approved sites Nos. 264 to 267 inclusive and removal/deletion of approved site No. 267 (3 dwellings in total, net reduction of 1 dwelling from LA05/2021/0635/F). Retention of roads/footways and open space as approved by Y/2009/0160/F and LA05/2021/0635/F with minor amendments to landscape proposals.

As published by the council, reference LA05/2024/0082/F

Application record

Reference
LA05/2024/0082/F
Type
Full
Status
Determined
Decision
Granted
Received
25 Jan 2024
Validated
30 Jan 2024
Decided
16 Sep 2024
Ward
Carryduff East
Postcode
BT8 8AN

Timeline

Dates from the published record

  1. 25 Jan 2024

    Received by Lisburn and Castlereagh

  2. 30 Jan 2024

    Validated

    Checked as complete and ready for consideration.

  3. 16 Sep 2024

    Decision issued: Granted

  4. 27 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, a planning consultancy registered in Belfast

38 applications on PlanIndex · across 3 councils

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

20 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Lisburn and Castlereagh granted permission on 16 September 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

In Lisburn and Castlereagh

  • 12 The Hermitage, Dunmurry, Belfast, BT17 9NH

    Demolition of existing sunroom to rear, construction of a single-storey rear ground floor extension, comprising of a new Kitchen/Living/Dining room. Internal reconfigurations to include a new snug/study and utility room.

    8 Oct 2025 Full applications
  • Millars Lane WwPS 5 Millmount Quarry Close, Dundonald, BT16 1YT

    A wastewater storage tank for the existing Millars Lane Wastewater Pumping Station (WwPS) including chambers and associated sewers below ground level and a water booster set, telemetry and lighting aerial above ground. Other works include a 2.4m high paladin fence, access gate and associated site and access works.

    4 Feb 2025 Full applications
  • LA05/2026/0697/F Awaiting decision

    12 Culross Place, Belfast, BT16 2SN

    Proposed single storey extension to rear

    2 Sep 2026 Full applications
  • LA05/2026/0695/F Awaiting decision

    330m East of 24 Eglantine Road, Lisburn

    Dwelling and garage to replace vacant/derelict farm buildings (formerly pig crews)

    2 Sep 2026 Full applications
  • LA05/2026/0701/F Awaiting decision

    3 Breda Park, Belfast, BT8 6JR

    Construction of a two storey extension to gable and single storey extension to rear of existing property together with associated site works and landscaping.

    2 Sep 2026 Full applications