Planning application
1 Ferndell, Lisburn, BT27 4HQ
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
New two storey dwelling, vehicular access and associated site works including revised driveway position to No1 Ferndell
As published by the council, reference LA05/2023/0998/F
Application record
- Reference
- LA05/2023/0998/F
- Type
- Full
- Status
- Determined
- Decision
- Granted
- Received
- 13 Dec 2023
- Validated
- 19 Dec 2023
- Decided
- 8 Nov 2024
- Ward
- Harmony Hill
- Postcode
- BT27 4HQ
Timeline
Dates from the published record
-
13 Dec 2023
Received by Lisburn and Castlereagh
-
19 Dec 2023
Validated
Checked as complete and ready for consideration.
-
8 Nov 2024
Decision issued: Granted
-
27 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, a planning consultancy
22 applications on PlanIndex · across 6 councils · 95% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
15 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
2 Kennedy Drive, Lisburn, BT27 4HY
Proposed single storey extension to side of dwelling
Granted Full applications Extension 10 docsSmall domestic -
Adjacent to No. 2 Skyline Drive, Lisburn, BT27 4HH
81% historically approved · decision due ~17 Oct
Non material change application to approval LA05/2026/0255/F- Change of 1.2m boundary wall to 1.8m boudary timber fence and section of estate railing, all proposed planting to remain as approved
Awaiting decision Amendments 4 docsSmall domestic -
Adj to no. 2 Skyline Drive, Lisburn, BT27 4HH
Change of house type to current approval LA05/2024/0023/F for a 2-storey detached dwelling & 1.2m High Boundary Wall.
Granted Full applications New dwelling 14 docsSmall domestic -
106 BELSIZE ROAD MAGHERALAVE (UPPER BELFAST) LISBURN BT27 4BP
Proposed single storey side extension to form kitchen extension and sunlounge to rear.
Granted Full applications Extension 7 docsSmall domestic -
25 Harmony Drive, Lisburn, BT27 4ED
Proposed single storey rear and single storey side extension to form new sunroom and additional bedroom and living space
Granted Full applications Extension 10 docsSmall domestic -
80a Belsize Road, Lisburn, BT27 4BP
This application is to build a new detached dwelling in a large 12m wide side garden located adjacent to 80 Belsize Road. An existing single story side extension on 80 Belsize Road will be removed to make way for the new dwelling
Granted Full applications New dwelling Extension 20 docsDomestic
Other full applications applications
In Lisburn and Castlereagh
-
LA05/2026/0693/F Awaiting decision
161 Dromore Road, Hillsborough, BT26 6JA
Alterations to existing Diner (161) and Service Station Shop (163) involving Internal refits to both buildings to accommodate new franchisees. External alterations to both buildings including alterations to existing entrances, formation of a new entrance to No163, addition of feature panelling external wall treatment to both buildings, construction of an access ramp and complimentary steps to No 161.
-
LA05/2025/0903/F Granted
Lands opposite Nos. 41 - 45, 60 - 67 & 72 - 75 Ballantine Gardens, Lisburn, BT27 5FB
Proposed amendments to planning permission S/2011/0383/F including the conversion of approved first floor domestic storage areas into two apartments, additional parking, bin store and ancillary site works
-
LA05/2026/0576/F Granted
12 Lurganville Road, Moira, Craigavon, BT67 0PJ
Proposed new access to existing dwelling at 12A in lieu of shared access (use of shared access to laneway to 12A to cease)
-
LA05/2026/0571/F Granted
37 Fairfields Manor, Magheralave, Lisburn, BT28 3WA
Attic conversion with new rear flat roof dormer
-
LA05/2025/0270/F Granted
Land approximately 50 meters south of 240 Comber Rd, Dundonald, Belfast BT16 2BS
Wastewater Pumping Station (WwPS) including chambers and associated sewers below ground level and a Motor Control Centre (MCC) Kiosk building, telemetry and lighting columns. Other works include associated site and access works.