Skip to content
PlanIndex Get alerts
Menu

Planning application

150m South of 5 Hannahstown Road, Slievenacloy, Lisburn, BT28 3TB

Granted Lisburn and Castlereagh LA05/2023/0355/F Full

Works: Extension

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Proposed amendment to the layout of a previously approved anaerobic digester plant (reference LA05/2015/0716/F). Works include relocation of approved office building, gas flare, treatment plant, and electrical cabinet. Proposal of additional 6no. container units to house CHP, processing and communications equipment, office building (19m2), 3no.additional electrical cabinets, weighbridge, associated cabling/ducting, extension of the internal access route, additional landscaping and any ancillary works. Dimensions and location of 3no. silos and 3no. digester tanks to remain as approved (AMENDED DESCRIPTION).

As published by the council, reference LA05/2023/0355/F

Application record

Reference
LA05/2023/0355/F
Type
Full
Status
Site Inspection Complete
Decision
Permitted
Received
3 Apr 2023
Validated
21 Apr 2023
Ward
Stonyford
Postcode
BT28 3TB

Timeline

Dates from the published record

  1. 3 Apr 2023

    Received by Lisburn and Castlereagh

  2. 21 Apr 2023

    Validated

    Checked as complete and ready for consideration.

  3. 27 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, a design practice

1 application on PlanIndex

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

57 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Lisburn and Castlereagh granted permission, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

In Lisburn and Castlereagh

  • 12 The Hermitage, Dunmurry, Belfast, BT17 9NH

    Demolition of existing sunroom to rear, construction of a single-storey rear ground floor extension, comprising of a new Kitchen/Living/Dining room. Internal reconfigurations to include a new snug/study and utility room.

    8 Oct 2025 Full applications
  • Millars Lane WwPS 5 Millmount Quarry Close, Dundonald, BT16 1YT

    A wastewater storage tank for the existing Millars Lane Wastewater Pumping Station (WwPS) including chambers and associated sewers below ground level and a water booster set, telemetry and lighting aerial above ground. Other works include a 2.4m high paladin fence, access gate and associated site and access works.

    4 Feb 2025 Full applications
  • LA05/2026/0697/F Awaiting decision

    12 Culross Place, Belfast, BT16 2SN

    Proposed single storey extension to rear

    2 Sep 2026 Full applications
  • LA05/2026/0695/F Awaiting decision

    330m East of 24 Eglantine Road, Lisburn

    Dwelling and garage to replace vacant/derelict farm buildings (formerly pig crews)

    2 Sep 2026 Full applications
  • LA05/2026/0701/F Awaiting decision

    3 Breda Park, Belfast, BT8 6JR

    Construction of a two storey extension to gable and single storey extension to rear of existing property together with associated site works and landscaping.

    2 Sep 2026 Full applications