Planning application

Royal Hillsborough Village, Royal Hillsborough. Includes Lisburn Street, Ballynahinch Street extending through Main Street and The Square to Dromore Road. This area also includes Park Street and Park Lane

Granted Lisburn and Castlereagh LA05/2023/0281/F Full

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Public Realm improvement works which include: enhanced civic spaces at The Square and Lower Main Street. Also upgrade of streetscape to include new high quality surfacing, rationalisation of parking with defined parking/loading bays introduced; upgraded street furniture and new cycle stands, lighting and street tree planting on lands within Royal Hillsborough village centre (amended drawing package)

As published by the council, reference LA05/2023/0281/F

Application record

Reference
LA05/2023/0281/F
Type
Full
Status
Determined
Decision
Granted
Received
31 Mar 2023
Validated
31 Mar 2023
Decided
29 Jun 2026
Ward
Hillsborough

Timeline

Dates from the published record

  1. 31 Mar 2023

    Received by Lisburn and Castlereagh

  2. 29 Jun 2026

    Decision issued: Granted

  3. 27 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

207 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

In Lisburn and Castlereagh

  • LA05/2026/0693/F Awaiting decision

    161 Dromore Road, Hillsborough, BT26 6JA

    Alterations to existing Diner (161) and Service Station Shop (163) involving Internal refits to both buildings to accommodate new franchisees. External alterations to both buildings including alterations to existing entrances, formation of a new entrance to No163, addition of feature panelling external wall treatment to both buildings, construction of an access ramp and complimentary steps to No 161.

    31 Aug 2026 Full applications
  • Lands opposite Nos. 41 - 45, 60 - 67 & 72 - 75 Ballantine Gardens, Lisburn, BT27 5FB

    Proposed amendments to planning permission S/2011/0383/F including the conversion of approved first floor domestic storage areas into two apartments, additional parking, bin store and ancillary site works

    10 Dec 2025 Full applications
  • 12 Lurganville Road, Moira, Craigavon, BT67 0PJ

    Proposed new access to existing dwelling at 12A in lieu of shared access (use of shared access to laneway to 12A to cease)

    7 Jul 2026 Full applications
  • 37 Fairfields Manor, Magheralave, Lisburn, BT28 3WA

    Attic conversion with new rear flat roof dormer

    3 Jul 2026 Full applications
  • Land approximately 50 meters south of 240 Comber Rd, Dundonald, Belfast BT16 2BS

    Wastewater Pumping Station (WwPS) including chambers and associated sewers below ground level and a Motor Control Centre (MCC) Kiosk building, telemetry and lighting columns. Other works include associated site and access works.

    10 Apr 2025 Full applications