Skip to content
PlanIndex Get alerts
Menu

Planning application

Lands to the rear of 21 and 21A East Down View, Lisburn, BT27 4UW

Granted Lisburn and Castlereagh LA05/2023/0211/F Full

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Proposed construction of single storey dwelling with private garden and in curtilage parking at lands to the rear of 21 & 21A East Down View, Lisburn. (Amended plans and site address)

As published by the council, reference LA05/2023/0211/F

Application record

Reference
LA05/2023/0211/F
Type
Full
Status
Determined
Decision
Granted
Received
2 Mar 2023
Validated
7 Mar 2023
Decided
28 Apr 2025
Ward
Hilden
Postcode
BT27 4UW

Timeline

Dates from the published record

  1. 2 Mar 2023

    Received by Lisburn and Castlereagh

  2. 7 Mar 2023

    Validated

    Checked as complete and ready for consideration.

  3. 28 Apr 2025

    Decision issued: Granted

  4. 27 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, an architecture practice registered in Armagh

23 applications on PlanIndex · across 4 councils · 100% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

23 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Lisburn and Castlereagh granted permission on 28 April 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • 34 Delacherois Avenue, Lisburn, BT27 4TR

    LA05/2025/0580/F Submitted 14 Aug 2025 169m away

    Proposed 2 storey extension at the side [to provide a ground floor garage & first floor bedroom] and a single storey replacement lean-to-extension at 34 Delacherois Avenue, Lisburn BT27 4TR (Amended Description)

    Granted Full applications Extension 22 docs
    Small domestic
  • Lands at 70 Belfast Road, Lisburn, BT27 4AU

    LA05/2026/0621/DC Submitted 30 Jul 2026 450m away

    96% historically approved · decision due ~24 Sep

    Discharge condition 23 of LA05/2025/0384/F relating to badger setts

    Awaiting decision Conditions 3 docs
  • Lands at 70 Belfast Road, Lisburn, BT27 4AU

    LA05/2026/0622/DC Submitted 30 Jul 2026 451m away

    96% historically approved · decision due ~24 Sep

    Submission of TSA Cover letter to notify of remediation works commencing in line with the requirements of condition 15 of LA05/2025/0384/F

    Awaiting decision Conditions 3 docs
  • Lands at 70 Belfast Road, Lisburn, BT27 4AU

    LA05/2026/0265/DC Submitted 2 Apr 2026 452m away

    Discharge of conditions 25 and 26 previously approved LA05/2025/0384/F

    Decided Conditions 8 docs
  • Lands at 70 Belfast Road, Lisburn, BT27 4AU

    LA05/2026/0401/DC Submitted 11 May 2026 452m away

    Discharge of Condition 30 of LA05/2025/0384/F: Submission of Piling Risk Assessment Report

    Decided Conditions 8 docs
  • Lands at 70 Belfast Road, Lisburn, BT27 4AU

    LA05/2026/0468/DC Submitted 1 Jun 2026 452m away

    Discharge of Condition 31 (Decommisioning of geotechnical boreholes) of LA05/2025/0384/F.

    Decided Conditions 7 docs

In Lisburn and Castlereagh

  • 12 The Hermitage, Dunmurry, Belfast, BT17 9NH

    Demolition of existing sunroom to rear, construction of a single-storey rear ground floor extension, comprising of a new Kitchen/Living/Dining room. Internal reconfigurations to include a new snug/study and utility room.

    8 Oct 2025 Full applications
  • Millars Lane WwPS 5 Millmount Quarry Close, Dundonald, BT16 1YT

    A wastewater storage tank for the existing Millars Lane Wastewater Pumping Station (WwPS) including chambers and associated sewers below ground level and a water booster set, telemetry and lighting aerial above ground. Other works include a 2.4m high paladin fence, access gate and associated site and access works.

    4 Feb 2025 Full applications
  • LA05/2026/0697/F Awaiting decision

    12 Culross Place, Belfast, BT16 2SN

    Proposed single storey extension to rear

    2 Sep 2026 Full applications
  • LA05/2026/0695/F Awaiting decision

    330m East of 24 Eglantine Road, Lisburn

    Dwelling and garage to replace vacant/derelict farm buildings (formerly pig crews)

    2 Sep 2026 Full applications
  • LA05/2026/0701/F Awaiting decision

    3 Breda Park, Belfast, BT8 6JR

    Construction of a two storey extension to gable and single storey extension to rear of existing property together with associated site works and landscaping.

    2 Sep 2026 Full applications