Skip to content
PlanIndex Get alerts
Menu

Planning application

5 Muskett Park Carryduff BT8 8QR

Granted Lisburn and Castlereagh LA05/2022/1013/F Full

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Proposed single storey extension to side of dwelling

As published by the council, reference LA05/2022/1013/F

Application record

Reference
LA05/2022/1013/F
Type
Full
Status
Determined
Decision
Granted
Received
28 Oct 2022
Validated
28 Oct 2022
Decided
22 Feb 2023
Ward
Carryduff West
Postcode
BT8 8QR

Timeline

Dates from the published record

  1. 28 Oct 2022

    Received by Lisburn and Castlereagh

  2. 22 Feb 2023

    Decision issued: Granted

  3. 27 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, a design practice

18 applications on PlanIndex · across 6 councils · 100% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

19 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 81 Ballynahinch Road, Belfast, BT8 8DP

    LA05/2026/0593/F Submitted 3 Jul 2026 100m away

    98% historically approved · decision due ~22 Sep

    Erection of entrance pillars, installation of sliding entrance gate and relocation of pedestrian gate and pathway into site.

    Awaiting decision Full applications 4 docs
  • 81 Ballynahinch Road, Belfast, BT8 8DP

    LA05/2026/0041/NMC Submitted 14 Jan 2026 101m away

    Increase in height of entrance pillars to 1.9m, addition of sliding entrance gate and relocation of pedestrian gate and pathway into site - LA05/2018/1135/F.

    Withdrawn Amendments 7 docs
  • 9 Winchester Gardens, CARRYDUFF, BT8 8QE

    LA05/2026/0201/F Submitted 16 Mar 2026 124m away

    Proposed single storey pitched roof bay window extension to front of dwelling. Proposed single storey flat roofed extension to rear of dwelling. Formation of ground floor window in side gable wall.

    Granted Full applications Extension Windows or glazing 12 docs
    Small domestic
  • 70 Ballynahinch Road, Belfast, BT8 8DP

    LA05/2023/0601/F Submitted 7 Jul 2023 136m away

    Proposed demolition of rear return and retention and extension of existing building for the erection of 6 no. x 1 bedroom living units, multi purpose room, ancillary staff offices and welfare facilities, amenity space, landscaping, car parking and associated site works’ (Amended plans received)

    Granted Full applications Extension Demolition 43 docs
  • 12 Winchester Crescent, Carryduff, BT8 8QB

    LA05/2025/0550/F Submitted 31 Jul 2025 221m away

    Proposed single storey integrated extension to the side of existing dwelling within the curtilage of the site to provide games room/garden storage room facilities.

    Granted Full applications Extension 12 docs
    Small domestic
  • 22 Winchester Road, Carryduff, Belfast, BT8 8QQ

    LA05/2026/0402/F Submitted 11 May 2026 294m away

    Addition of a single storey extension, to the side and rear of the existing dwelling, within the curtilage of the site. Demolition of existing conservatory.

    Granted Full applications Extension Demolition 9 docs
    Small domestic

In Lisburn and Castlereagh

  • LA05/2026/0693/F Awaiting decision

    161 Dromore Road, Hillsborough, BT26 6JA

    Alterations to existing Diner (161) and Service Station Shop (163) involving Internal refits to both buildings to accommodate new franchisees. External alterations to both buildings including alterations to existing entrances, formation of a new entrance to No163, addition of feature panelling external wall treatment to both buildings, construction of an access ramp and complimentary steps to No 161.

    31 Aug 2026 Full applications
  • Lands opposite Nos. 41 - 45, 60 - 67 & 72 - 75 Ballantine Gardens, Lisburn, BT27 5FB

    Proposed amendments to planning permission S/2011/0383/F including the conversion of approved first floor domestic storage areas into two apartments, additional parking, bin store and ancillary site works

    10 Dec 2025 Full applications
  • 12 Lurganville Road, Moira, Craigavon, BT67 0PJ

    Proposed new access to existing dwelling at 12A in lieu of shared access (use of shared access to laneway to 12A to cease)

    7 Jul 2026 Full applications
  • 37 Fairfields Manor, Magheralave, Lisburn, BT28 3WA

    Attic conversion with new rear flat roof dormer

    3 Jul 2026 Full applications
  • Land approximately 50 meters south of 240 Comber Rd, Dundonald, Belfast BT16 2BS

    Wastewater Pumping Station (WwPS) including chambers and associated sewers below ground level and a Motor Control Centre (MCC) Kiosk building, telemetry and lighting columns. Other works include associated site and access works.

    10 Apr 2025 Full applications