Skip to content
PlanIndex Get alerts
Menu

Planning application

St Peter In Eastgate Infants School Greetwell Gate Lincoln Lincolnshire LN2 4AW

Granted Lincoln 2021/0629/CCC County Council Consultation

Works: Demolition Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

To demolish existing Lincolnshire stone boundary wall to north, east and west elevations. Reclaim and use imported reclaimed Lincolnshire lime stone and build wall to existing height above footpath level. Include a new reclaimed brick string course and pan tile coping, all in gauged sand and lime mortar.

As published by the council, reference 2021/0629/CCC

Application record

Reference
2021/0629/CCC
Type
County Council Consultation
Status
Decided
Decision
Granted
Received
28 Jul 2021
Validated
28 Jul 2021
Decided
10 Sep 2021
Ward
Minster
Decision by
Planning Team Leader
Postcode
LN2 4AW

Site history

Applications at this address on the Lincoln register

This site has had 3 applications since 2021: 3 approved, 0 refused.

  • 2024/0661/CCC Granted

    St Peter In Eastgate Infants School Greetwell Gate Lincoln Lincolnshire LN2 4AW

    For the removal of an existing chimney and subsequent making good works externally.

    Decided 30 Oct 2024 Outline
  • 2024/0662/CCC Granted

    St Peter In Eastgate Infants School Greetwell Gate Lincoln Lincolnshire LN2 4AW

    For the removal of an existing chimney and subsequent making good works externally (Listed Building Consent).

    Decided 30 Oct 2024 Outline

Timeline

Dates from the published record

  1. 28 Jul 2021

    Received by Lincoln

  2. 10 Sep 2021

    Decision issued: Granted

  3. 5 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

1 document on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Lincoln granted permission on 10 September 2021, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About outline applications

An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • St Peter In Eastgate Infants School Greetwell Gate Lincoln Lincolnshire LN2 4AW

    2024/0661/CCC Submitted 10 Oct 2024 2m away

    For the removal of an existing chimney and subsequent making good works externally.

    Granted Outline 1 doc
  • St Peter In Eastgate Infants School Greetwell Gate Lincoln Lincolnshire LN2 4AW

    2024/0662/CCC Submitted 10 Oct 2024 2m away

    For the removal of an existing chimney and subsequent making good works externally (Listed Building Consent).

    Granted Outline 1 doc
  • 18 Wainwell Mews Lincoln Lincolnshire LN2 4BF

    2019/0950/TCO Submitted 25 Nov 2019 82m away

    T1 Silver Birch - Reduce height by 2m, reduce lateral spread by 2m, removal of 2 lower branches and crown lift to 1m (5m specified on application would be to great advise a maximum of 1m) T2 Silver Birch - Remove tree to ground level. T3 Silver Birch - Reduce height by 2m, reduce lateral spread by 2m and crown lift to 1m (5m specified on application would be to great advise a maximum of 1m)

    Granted Trees 1 doc
  • Winnowsty House Winnowsty Lane Lincoln Lincolnshire LN2 5RZ

    2023/0031/TRC Submitted 17 Jan 2023 130m away

    T1 (Birch) Reduce canopy spread by 4 metres to attain a canopy spread of 10 metres. T2 (Birch) Reduce canopy spread by 4 metres to attain a canopy spread of 10 metres T3 (Scots Pine) Fell T4 (Scots Pine) Fell T5 (Scots Pine) Fell

    Refused Trees 3 docs
  • The Stable Block Winnowsty Lane Lincoln Lincolnshire LN2 5RZ

    2026/0409/LBC Submitted 6 Jul 2026 135m away

    93% historically approved · decision due ~31 Aug

    Replacement of existing slate roofing. (Listed Building Consent)

    Decided Heritage and listed buildings 6 docs
  • Land Adjacent To Dell Cottage 30 Wragby Road Lincoln Lincolnshire LN2 4PD

    2026/0508/RD Submitted 17 Aug 2026 153m away

    93% historically approved · decision due ~15 Oct

    Submission of details to discharge conditions 7 (finished floor levels), 8 (external materials), 9 (brick sample panel) and 10 (window and door details) of planning permission 2023/0183/FUL.

    Awaiting decision Windows or glazing

In Lincoln

  • 2026/0283/RD Decided

    Land To The Rear Of 12 Wilson Street Lincoln Lincolnshire LN1 3JA

    Submission of details to discharge condition 3 (verification report) of planning permission 2025/0451/FUL.

    18 May 2026 Outline
  • 2026/0135/RD Decided

    Land Adjacent To Lindum And Minster Practice Cabourne Court Lincoln Lincolnshire LN2 2JP

    Submission of details to discharge condition 5 (Biodiversity Gain Plan) of planning permission 2024/0687/FUL.

    3 Mar 2026 Outline
  • 2026/0076/RD Decided

    Land Adjacent To Lindum And Minster Cabourne Court Lincoln Lincolnshire

    Submission of details to discharge conditions 3 (archaeology), 6 (habitat management) and 8 (ecological mitigation) of planning permission 2024/0687/FUL.

    2 Feb 2026 Outline
  • 2026/0231/RD Awaiting decision

    168 Sadler Road Lincoln Lincolnshire LN6 3RS

    Submission of details to discharge conditions 3 (Surface Water Drainage Strategy), 4 (Cycle Store Provision Statement), 5 (BNG Metric Data), 6 (Habitat Management and Maintenance Plan), 7 (Ecological Mitigation and Enhancement Plan) of planning permission 2025/0472/FUL.

    24 Apr 2026 Outline
  • 2026/0226/RD Awaiting decision

    The Pelham Centre Canwick Road Lincoln Lincolnshire

    Submission of details to discharge condition 8 (drainage scheme) of planning permission 2022/0427/FUL.

    23 Apr 2026 Outline