Planning application

Edial House Farm Edial Barn Lichfield Road Burntwood Staffordshire WS7 0HT

Granted Lichfield 26/00971/FUH

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Works to listed building to allow the installation of one electric vehicle charging point on external brick wall

As published by the council, reference 26/00971/FUH

Application record

Reference
26/00971/FUH
Status
Decided
Decision
Granted As published: Approve
Received
3 Aug 2026
Validated
12 Aug 2026
Decided
25 Sep 2026
Ward
Hammerwich With Wall
Parish
Hammerwich
Postcode
WS7 0HT

Site history

Applications at this address on the Lichfield register

This site has had 2 applications since 2026: 2 approved, 0 refused.

  • 26/00970/LBC Granted

    Edial House Farm, Edial Barn Lichfield Road Burntwood Staffordshire WS7 0HT

    Works to listed building to allow the installation of one electric vehicle charging point on external brick wall

    Decided 25 Sep 2026 Heritage and listed buildings

Timeline

Dates from the published record

  1. 3 Aug 2026

    Received by Lichfield

  2. 12 Aug 2026

    Validated

    Checked as complete and ready for consideration.

  3. 12 Aug 2026

    Added to PlanIndex

  4. 25 Sep 2026

    Decision issued: Approve

  5. 25 Sep 2026

    Status changed to Decided

    Previously Pending Consideration.

Documents

Plans, drawings, consultee responses and the officer's report

6 documents on file for this application

  • _staffordshire county council highways Consultation Responses · 20 Aug 2026
  • Locationplan Location / Site Plan · 11 Aug 2026
  • Applicationformredacted Application Form · 03 Aug 2026
  • Pl01_existing_side_elevation Existing Plans / Elevations · 03 Aug 2026
  • Dh01_design_and_heritage_statement Design and Access Statement · 03 Aug 2026
  • Ohme_home_pro_7.4kw_product_data_sheet Additional Information · 03 Aug 2026

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Lichfield granted permission on 25 September 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.