Skip to content
PlanIndex Get alerts
Menu

Planning application

Land West Of Farm Fields Hints Road Mile Oak Tamworth Staffordshire

Granted Lichfield 26/00347/OUT Outline Application

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Outline application for the erection of up to 4 No. dwellings, with all matters reserved (except access)

As published by the council, reference 26/00347/OUT

Application record

Reference
26/00347/OUT
Type
Outline Application
Status
Decided
Decision
Approve
Received
16 Mar 2026
Validated
19 Mar 2026
Decided
11 May 2026
Ward
Fazeley
Parish
Fazeley
Decision by
Delegated Decision
Postcode
B78 3DR

Timeline

Dates from the published record

  1. 16 Mar 2026

    Received by Lichfield

  2. 19 Mar 2026

    Validated

    Checked as complete and ready for consideration.

  3. 11 May 2026

    Decision issued: Approve

  4. 17 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

24 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About outline applications

How this application type works

An outline application tests the principle of developing a site before the detail is worked up. Some or all of the particulars, such as appearance, layout, scale, access and landscaping, are held back as reserved matters for later approval. Permission at outline stage does not by itself allow building to start; the reserved matters must be approved first.

More on outline applications in our guide

Nearby applications

Within 500 metres

In Lichfield

  • 25/01485/OUTM Refused

    Land At Coulter Lane Farm Coulter Lane Burntwood Staffordshire WS7 9EU

    Outline planning application (with all matters reserved except primary means of vehicular access from Church Road) for the demolition of 59 Church Road (and associated buildings) and the construction of up to 250 dwellings, associated access, drainage, green and blue infrastructure, ground remodelling and ancillary infrastructure.

    1 Dec 2025 Outline
  • 26/00425/OUTM Refused

    Land West Of Roman Lane And Little Aston Park Road Little Aston Sutton Coldfield Staffordshire

    Outline planning application (with all matters reserved apart from access) for the demolition of the dwellinghouse known as Priors, the provision of up to 100 dwellings (Use Class C3) and associated infrastructure including but not limited to new access road, sustainable urban drainage systems, public open space, landscaping, child play space, shop; and appropriate boundary treatment to the railway.

    31 Mar 2026 Outline
  • 26/00855/OUT Awaiting decision

    Land South Of The Farm House Church Road Stonnall Walsall Staffordshire WS9 9HL

    Outline application (with all matters reserved except for access) for up to 2 No. dwellings and associated works

    10 Jul 2026 Outline
  • 26/00630/OUTM Awaiting decision

    Land North Of Rake Hill Burntwood Staffordshire

    Outline planning application (with all matters reserved except for access) for demolition of all buildings and structures, residential development, open space, associated works and infrastructure

    18 May 2026 Outline
  • 26/00516/SCREE Decided

    Land North Of Claypit Lane Lichfield Staffordshire

    Screening Opinion: Erection of up to 300 dwellings including affordable housing, extension to existing country park, alongside sustainable drainage and other supporting infrastructure.

    8 Apr 2026 Outline