Planning application
Lichfield South Business Park Birmingham Road Wall Lichfield Staffordshire
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Hybrid planning application consisting of a Full planning application for an electric vehicle charging hub with associated drive-thru coffee shop (Class E/ sui generis), new office building (Class E) and Outline planning application for flexible employment development to include hi-technology uses and advanced manufacturing (to include Use Class E, Class B2 and Class B8) including new access, car parking, servicing, landscaping and associated works
As published by the council, reference 23/01040/OUTFLM
Application record
- Reference
- 23/01040/OUTFLM
- Type
- Outline and Full Application
- Status
- Decided
- Decision
- Granted As published: Approve
- Received
- 5 Sep 2023
- Validated
- 7 Sep 2023
- Decided
- 26 Nov 2024
- Ward
- Shenstone
- Parish
- Shenstone
- Decision by
- Committee Decision
Timeline
Dates from the published record
-
5 Sep 2023
Received by Lichfield
-
7 Sep 2023
Validated
Checked as complete and ready for consideration.
-
26 Nov 2024
Decision issued: Approve
-
8 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Pegasus Group Ltd Agent
1,231 applications on PlanIndex · across 171 councils · 91% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordLingfield Assets LLP Applicant, registered in Oldbury
Active · incorporated 2006 · Oldbury
2 applications on PlanIndex
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
99 documents on file for this application
- Conditions 16 and 20 decision notice unsigned
- Conds 4,11,13,14,20,& 35
- Out decision
- 24th jan supplementary report rev b.pdf
- Planning committee report 24 january 2024.pdf
- Bng metric update 15.1.24 15.1.24
- Illustrative bng metric plan
- Illustrative landscape masterplan
- _ ecology manager - ldc
- National highways
- _ arboricultural officer - ldc
- _ staffordshire highways
- _ active travel england
- Revised trasnport assessment
- _environment agency
- _flood risk officer (staffs)
- 23200-303-05 proposed block plan - full red line.pdf
- 23200-302-07 proposed site plan - full red line.pdf
- P23-0442_en_0001_g_0001 ilmp
- Naturespace comments
- _ ecology manager - ldc
- _active england
- _active england
- Technical file note 4
- Nsp report lichfield south business park 202307033 v02.pdf
- 202307033_impact_map_v02.pdf
- 231004 1736 rep v1 final.pdf
- Lin00780 2310113 planning llfa consultation response letter.pdf
- Covering email 23_01040_outflm - lichfield south - response to llfa comments.pdf
- 23_2657-sto-00-zz-dr-a-0001-s2-p05-proposed_site_plan.pdf
- 000780-jpl-zz-zz-rp-d-2501-a3-c01 suds operation and maintenance statement.pdf
- 000780-jpl-zz-zz-rp-d-2008-a3-c02 drainage strategy.pdf
- 000780-jpl-zz-zz-rp-d-2007-a3-c02 flood risk assessment.pdf
- _ staffordshire highways
- _ environmental health officer - ldc
- _environment agency
- _ environmental health officer - ldc
- _environment agency
- _flood risk officer (staffs)
- Mr duncan fisher
- _ severn trent water
- _ arboricultural officer - ldc
- _ spatial policy and delivery officer - ldc
- 23_2657-sto-00-zz-dr-a-2000-s2-p02-proposed_elevations.pdf
- 23_2657-sto-00-zz-dr-a-0004-s2-p02-proposed_floor_plans.pdf
- Mineral and waste (staffs)
- _ conservation officer - ldc
- Minerals and waste (staffs)
- Submission schedule v2 - lpa version.pdf
- _ joint waste officer-ldc
- P23-0442_en_0002_b_0001 ev station detailed soft landscape proposals.pdf
- P23-0442_en_0001_f_0001 ilmp.pdf
- Mi-ro-001a (site landscaping).pdf
- Lin0780 230817 starbucks unit swept path analysis.pdf
- Lichfield south - 04 - roof plan.pdf
- Lichfield south - 03 - external elevations 2.pdf
- Lichfield south - 02 - external elevations 1.pdf
- Lichfield south - 01 - general arrangement plan.pdf
- Bp typical details and canopy section sheet 1 of 2.pdf
- 3.8 - 01 - bp pulse typical details - bay layouts.pdf
- 23_2657-sto-00-zz-dr-a-3102-s2-p01-proposed plant enclosure.pdf
- 23_2657-sto-00-zz-dr-a-3101-s2-p02-proposed bin store.pdf
- 23_2657-sto-00-zz-dr-a-3100-s2-p01-proposed cycle store.pdf
- 23_2657-sto-00-zz-dr-a-2000-s2-p01-proposed_elevations.pdf
- 23_2657-sto-00-zz-dr-a-0004-s2-p01-proposed_floor_plans.pdf
- 23_2657-sto-00-zz-dr-a-0002-s2-p01-existing_site_plan.pdf
- 23_2657-sto-00-zz-dr-a-0001-s2-p04-proposed_site_plan.pdf
- 23200-321 proposed visual 2.pdf
- 23200-314-01 bp pulse and drive thru proposed site plan.pdf
- 23200-312 proposed cycle hub.pdf
- 23200-311-01 proposed site sections.pdf
- 23200-310-02 proposed street scenes.pdf
- 23200-303-04 proposed block plan.pdf
- 23200-302-06 proposed site plan.pdf
- 23200-301-01 existing site plan.pdf
- 23200-300-01 location plan.pdf
- 18691_t_ug_rev6 topographical survey.pdf
- 13739-25 - bp pulse typical proposed ev canopy.pdf
- 13739-24 - bp pulse typical proposed equipment elevations.pdf
- Out - k3415form006_england_en v3.pdf
- Full - k3415form006_england_en.pdf
- R006v3 - economic benefits statement.pdf
- R005v5 sustainability strategy final 010923.pdf
- R004v3 sequential assessment 310823 final.pdf
- R003v6 planning statement 050923 final.pdf
- Lin00780 04tt02b travel plan.pdf
- Lin00780 - 04tt01b transport assessment.pdf
- Lichfield south_air quality assessment_v2.0-issue.pdf
- 230901 1736 metric bng v1.xlsx
- 230901 1736 bng v1 final issue.pdf
- 230721 1736 pea v1a final issue.pdf
- 230714 1736 aia v1.pdf
- 23-2657 bloor homes design and access statement rev b.pdf
- 22300-800-06 design and access statement.pdf
- 000780-jpl-zz-zz-rp-d-2008-a3-c01 drainage strategy.pdf
- 000780-jpl-zz-zz-rp-d-2007-a3-c01 flood risk assessment.pdf
- 2023 - starbucks emea dt forward (002) v2.pdf
- (541)2344-jb-breeam pre-assessment-lichfield_units_r01.pdf
- (375)2349-sl-breeam pre-assessment-bloor homes_lichfield_r01.pdf
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Lichfield granted permission on 26 November 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About outline applications
An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Land At Lichfield South Birmingham Road Wall Lichfield Staffordshire
Screening Opinion: Hybrid application consisting of a full planning application for an electric vehicle charging station with associated building to incorporate payment area and coffee shop (Class E/ sui generis ), new office building (Class E) development and outline planning application for flexible employment to include hi-technology uses and advanced manufacturing development (to include Use Class E, Class B2 and Class B8) including new access, car parking, servicing, landscaping, ground remediation and associated works.
Decided Outline -
David Lloyd Clubs Birmingham Road Wall Lichfield Staffordshire WS14 0QP
Installation of 2no air source heat pumps to heat swimming pools and relocation of existing condensing units
Granted Full applications 12 docs -
McDonalds Restaurant Birmingham Road Wall Lichfield Staffordshire WS14 0QP
Installation of two electric vehicle charging stations and associated equipment
Granted Full applications 9 docs -
Jaama Ltd Two Lichfield South Birmingham Road Wall Lichfield Staffordshire WS14 0QP
Erection of 1no. double leg totem sign (Re-submission of 26/00281/ADV)
Granted Advertising 7 docs -
Land At Lichfield South Business Park Birmingham Road Wall Lichfield Staffordshire WS14 0QP
82% historically approved · decision due ~5 Nov
Installation of two freestanding, non-illuminated 2m high totem signs
Awaiting decision Advertising 3 docs -
McDonalds Restaurant Birmingham Road Wall Lichfield Staffordshire WS14 0QP
Refurbishment and redecoration of elevations, formation of new bin store, reconfiguration and refresh of patio area to include a new umbrella with associated works
Granted Full applications
Other outline applications
In Lichfield
-
26/00855/OUT Granted
Land South Of The Farm House Church Road Stonnall Walsall Staffordshire WS9 9HL
Outline application (with all matters reserved except for access) for up to 2 No. dwellings and associated works
-
25/01485/OUTM Refused
Land At Coulter Lane Farm Coulter Lane Burntwood Staffordshire WS7 9EU
Outline planning application (with all matters reserved except primary means of vehicular access from Church Road) for the demolition of 59 Church Road (and associated buildings) and the construction of up to 250 dwellings, associated access, drainage, green and blue infrastructure, ground remodelling and ancillary infrastructure.
-
26/00425/OUTM Refused
Land West Of Roman Lane And Little Aston Park Road Little Aston Sutton Coldfield Staffordshire
Outline planning application (with all matters reserved apart from access) for the demolition of the dwellinghouse known as Priors, the provision of up to 100 dwellings (Use Class C3) and associated infrastructure including but not limited to new access road, sustainable urban drainage systems, public open space, landscaping, child play space, shop; and appropriate boundary treatment to the railway.
-
26/00630/OUTM Awaiting decision
Land North Of Rake Hill Burntwood Staffordshire
Outline planning application (with all matters reserved except for access) for demolition of all buildings and structures, residential development, open space, associated works and infrastructure
-
26/00516/SCREE Decided
Land North Of Claypit Lane Lichfield Staffordshire
Screening Opinion: Erection of up to 300 dwellings including affordable housing, extension to existing country park, alongside sustainable drainage and other supporting infrastructure.