Planning application

Land West Of Main Road Haunton Tamworth Staffordshire

Granted Lichfield 22/01508/TCN Telecommunications Development

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Telecommunications Determination: Installation of a 30m high lattice style mast with headframe (Galvanised steel, Grey), 3No. antennas, 2No. dishes, 4No. cabinets and all ancillary development including compound area, security fencing, traffic barriers and new point of access/egress to public road

As published by the council, reference 22/01508/TCN

Application record

Reference
22/01508/TCN
Type
Telecommunications Development
Status
Decided
Decision
Prior Approval Required and Granted
Received
17 Oct 2022
Validated
17 Oct 2022
Decided
12 Dec 2022
Ward
Mease Valley
Parish
Clifton Campville
Decision by
Delegated Decision

Timeline

Dates from the published record

  1. 17 Oct 2022

    Received by Lichfield

  2. 12 Dec 2022

    Decision issued: Prior Approval Required and Granted

  3. 6 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

18 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About telecoms applications

How this application type works

Telecommunications applications cover masts, antennas and cabinets, most of which come forward as prior approval cases under permitted development rules. The council typically has 56 days to consider siting and appearance only. The need for the network itself is treated as established, so objections carry most weight where they address visual impact or siting.

More on telecoms applications in our guide

Nearby applications

Within 500 metres

In Lichfield

  • 26/00473/TCN Granted

    Land At Railway Bridge (111) Lichfield Road Armitage Rugeley Staffordshire

    Telecommunications Determination: Removal of the existing 12m telegraph pole to be replaced by 20m pole with a wraparound cabinet supporting 6no proposed antennas, together with the removal of 3 ground-based cabinets and the installation of 2 no proposed cabinets and ancillary development thereto.

    13 Apr 2026 Telecoms
  • 24/01150/TCN Withdrawn

    Land Adj Micklehome Drive Alrewas Burton Upon Trent Staffordshire

    Telecommunications Determination: Installation of 17.5m monopole, 6no. antenna, 1no. 0.3m dish, 3no. cabinets, 1no. meter cabinet with ancillary development thereto.

    23 Oct 2024 Telecoms
  • 24/00755/TCN Refused

    Land North Of Little Aston Road Aldridge Walsall Staffordshire

    Telecommunications Determination: Installation of a new 20m monopole accommodating 6no. antennas & 2no. microwave dishes, the installation of 2no. equipment cabinets, along with ancillary works

    5 Jul 2024 Telecoms
  • 24/00373/TCN Refused

    Land Adj Micklehome Drive Alrewas Burton Upon Trent Staffordshire

    Telecommunications Determination: Installation of a 17.5m M-Range V2 pole with 6nos antennas, 1no 300mm transmission dish, 3nos equipment cabinets, 1no meter cabinet and ancillary development.

    25 Mar 2024 Telecoms
  • 23/00045/TCN Refused

    Land Off Lichfield Street Fazeley Tamworth Staffordshire

    Telecommunications Determination: Installation of 15m pole inc. antennas, ground based apparatus and ancillary development

    12 Jan 2023 Telecoms