Planning application
HASELTINE PRIMARY SCHOOL, HASELTINE ROAD, LONDON, SE26 5AD
Works: Extension Demolition Windows or glazing Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
The change of use from ancillary educational use to Use Class C2 (Residential Institution),together with alterations to the elevations including removal, infilling and repositioning of windows, demolition of side lean to and construction of single storey extension, new boundary fencing and all associated works at former school keepers house, Haseltine Primary School, Haseltine Road SE26.
As published by the council, reference DC/25/141528
Application record
- Reference
- DC/25/141528
- Type
- Full Planning Permission
- Status
- Decided
- Decision
- Granted
- Received
- 22 Sep 2025
- Validated
- 30 Oct 2025
- Decided
- 18 Dec 2025
- Ward
- Bellingham
- Parish
- Does NOT need to go to BCAP
- Decision by
- Delegated
- Postcode
- SE26 5AD
Timeline
Dates from the published record
-
22 Sep 2025
Received by Lewisham
-
30 Oct 2025
Validated
Checked as complete and ready for consideration.
-
18 Dec 2025
Decision issued: Granted
-
10 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, registered in London
30 applications on PlanIndex · across 8 councils · 96% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
18 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
19 HASELTINE ROAD, LONDON, SE26 5AF
Application for a Lawful Development Certificate (Proposed) submitted under Section 192 of the Town & Country Planning Act 1990 (as amended) and Class B and C of Schedule 2, Part 1 of the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended) for the construction of a rear facing dormer and outridgger roof extension and the installation of two rooflights to the front roof slope at 19 HASELTINE ROAD, SE26 5AF
Granted Lawful development Extension Loft or dormer 18 docs -
ELWIS HOUSE, FLATS 1-7, BELL GREEN LANE, LONDON, SE26 5TP
The installation of replacement double-glazed uPVC windows at the front, side, and rear elevations, uPVC doors on the south elevation, and installation composite doors at the front and sides at Elwis House, Bell Green Lane SE26.
Granted Full applications Windows or glazing 11 docs -
STANTON SQUARE INDUSTRIAL ESTATE, 3 STANTON WAY, LONDON, SE26 5AB
Details submitted pursuant to Condition (6)(c) 'Site Contamination - Closure Report' of planning permission DC/17/102967 dated 28 March 2018 at Stanton Square Industrial Estate, SE26.
Granted Full applications 4 docs -
STANTON SQUARE INDUSTRIAL ESTATE, 3 STANTON WAY, LONDON, SE26 5AB
Application for the installation of 7x illuminated Fascia signs at Stanton Square Industrial Estate, 3 Stanton Way, SE26, together with the installation of 2x free standing totem signs.
Granted Advertising 7 docs -
RESTAURANT UNIT, BELL GREEN RETAIL PARK, LAND AT FORMER BELL GREEN GAS WORKS, BELL GREEN, LONDON, SE26 4PU
87% historically approved · decision due ~19 Oct
Installation of four rapid electric vehicle chargers and associated ancillary equipment, includin...
Awaiting decision -
361 SYDENHAM ROAD, LONDON, SE26 5SL
Details submitted pursuant to Conditions 4(a) Cycle Parking and 5(a) Refuse of Prior Approval DC/25/139298 dated 30th April 2025 at 361 Sydenham Road SE26.
Granted Full applications 4 docs
Other full applications applications
In Lewisham
-
DC/26/144712 Granted
111 SYDENHAM ROAD, LONDON, SE26 5UA
Details submitted pursuant to Condition 3-Shop Fronts and Condition 4-Windows of planning permission DC/25/142257 dated 20th March 2026 at 111 Sydenham Road SE26.
-
DC/26/144612 Refused
3 DAVID'S ROAD, LONDON, SE23 3EP
Alterations to the front elevation shopfront of 3 Davids Road, SE23.
-
DC/26/144621 Granted
FIRST FLOOR FLAT, 53 HOMECROFT ROAD, LONDON, SE26 5QN
Construction of a rear L-shaped roof extension and the installation of two rooflights in the front roof slope at First Floor Flat, 53 Homercroft Road, SE26, and associated works.
-
DC/26/142771 Granted
LAND REAR OF, 421 NEW CROSS ROAD, FRONTING STANLEY ST LONDON, SE14 6TA
Demolition of the existing building and construction of a new 4 storey building to provide flats (Use Class C3) with outdoor amenity space, cycle and refuse storage and all associated works at the rear of 421 New Cross Road, fronting onto Stanley Street SE14 and subject to a Legal Agreement pursuant to S106 of the Town and Country Planning Act 1990 (as amended).
-
DC/25/142252 Refused
139-141 LEWISHAM HIGH STREET, LONDON, SE13 6AA
The installation of a new shopfront, retractable awning and roller shutter at 139-141 Lewisham High Street SE13.