Skip to content
PlanIndex Get alerts
Menu

Planning application

59 TRESSILLIAN ROAD, LONDON, SE4 1YA

Granted Lewisham DC/19/111110 Householder Application

Works: Windows or glazing Domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

The installation of replacement double glazed timber sash windows to all elevations of 59 Tressillian Road, SE4.

As published by the council, reference DC/19/111110

Application record

Reference
DC/19/111110
Type
Householder Application
Status
Decided
Decision
Granted
Received
21 Feb 2019
Validated
21 Feb 2019
Decided
5 Apr 2019
Ward
Brockley
Parish
Does NOT need to go to BCAP
Decision by
Delegated
Postcode
SE4 1YA

Site history

Applications at this address on the Lewisham register

This site has had 3 applications since 2019: 3 approved, 0 refused.

  • DC/19/114506 Granted

    59 TRESSILLIAN ROAD, LONDON, SE4 1YA

    The installation of a replacement front door at 59 Tressillian Road, SE4.

    Decided 22 Apr 2020 Householder
  • DC/19/111703 Granted

    59 TRESSILLIAN ROAD, LONDON, SE4 1YA

    FRONT: ONE Yew (T1) FELL approx.ht.3m (clipped conical shape) FRONT: ONE Rowan (T2) FELL approx.ht.7-8m FRONT: ONE Viburnum (T3) FELL approx.ht.4m Works are to combat subsidence damage at the front elevation of 59 Tressillian Road. Informative: The removal of T1,T2,T3 will be detrimental to street visual amenity (especially with felling of T4 in the front garden of 57 Tressillian Road - see DC/19/111712 - and possibly the felling of cherry T1 street tree). It would be preferable if the vegetation removal could be phased, with some vegetation retained initially with crown reduction and the cracking continued to be monitored.

    Decided 16 May 2019 Trees

Timeline

Dates from the published record

  1. 21 Feb 2019

    Received by Lewisham

  2. 5 Apr 2019

    Decision issued: Granted

  3. 25 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

19 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Lewisham granted permission on 5 April 2019, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About householder applications

Householder applications cover work to an existing house and its garden, such as extensions, lofts and outbuildings, and cannot create a separate dwelling or change what the building is used for. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 65 TRESSILLIAN ROAD, LONDON, SE4 1YA

    DC/19/114558 Submitted 5 Nov 2019 50 yards away

    The construction of a ground-floor side and rear extension, together with new gated cycle and bin store area to the side of the dwelling, at 65 Tressillian Road, SE4.

    Refused Householder Extension 27 docs
    Domestic
  • 59 TRESSILLIAN ROAD, LONDON, SE4 1YA

    DC/19/114506 Submitted 4 Nov 2019 50 yards away

    The installation of a replacement front door at 59 Tressillian Road, SE4.

    Granted Householder 10 docs
    Domestic
  • 57A TRESSILLIAN ROAD, LONDON, SE4 1YA

    DC/19/111712 Submitted 2 Apr 2019 50 yards away

    FRONT: ONE Hawthorn (Crataegus prunifolia) (T4) FELL (works are to combat subsidence damage at 59 Tressillian Road). Informative: The removal of T4 in the front garden of no.57 Tressillian Road (coupled with T1,T2,T3 in the front garden of 59 Tressillian Road - see DC/19/111703 - and possibly the felling of cherry T1 street tree) will be detrimental to visual amenity. It would be preferable if vegetation removal could be phased, with some vegetation retained initially with crown reduction and the cracking continued to be monitored.

    Granted Trees 1 doc
  • 77 TRESSILLIAN ROAD, LONDON, SE4 1YA

    DC/25/142493 Submitted 18 Dec 2025 50 yards away

    Demolition and reconstruction of the chimney stack at 77 Tressillian Road, SE4.

    Granted Householder Demolition 10 docs
    Domestic
  • 59 TRESSILLIAN ROAD, LONDON, SE4 1YA

    DC/19/111703 Submitted 1 Apr 2019 50 yards away

    FRONT: ONE Yew (T1) FELL approx.ht.3m (clipped conical shape) FRONT: ONE Rowan (T2) FELL approx.ht.7-8m FRONT: ONE Viburnum (T3) FELL approx.ht.4m Works are to combat subsidence damage at the front elevation of 59 Tressillian Road. Informative: The removal of T1,T2,T3 will be detrimental to street visual amenity (especially with felling of T4 in the front garden of 57 Tressillian Road - see DC/19/111712 - and possibly the felling of cherry T1 street tree). It would be preferable if the vegetation removal could be phased, with some vegetation retained initially with crown reduction and the cracking continued to be monitored.

    Granted Trees 8 docs
  • 69D TRESSILLIAN ROAD, LONDON, SE4 1YA

    DC/25/142027 Submitted 3 Nov 2025 50 yards away

    Installation of replacement double-glazed timber sash windows in the front and rear elevations at 69D Tressilian Road, SE4.

    Granted Full applications Windows or glazing 8 docs

In Lewisham

  • DC/26/144603 Granted

    6 FRIENDLY STREET, LONDON, SE8 4DT

    Patial demoltion of existing rear additions, construction of a new single storey rear extension and all associated works at 6 Friendly Street, SE8

    Received 6 Jul, published by the council 3 Aug 2026 Householder
  • DC/26/145218 Awaiting decision

    24 THORNWOOD ROAD, LONDON, SE13 5RG

    The construction of a single-storey rear extension and rear terrace at 24 Thornwood Road, SE13.

    Received 28 Aug, published by the council 10 Sep 2026 Householder
  • DC/26/145157 Awaiting decision

    31 HAFTON ROAD, LONDON, SE6 1LW

    Construction of a single storey rear extension at 31 Hafton Road SE6.

    Received 24 Aug, published by the council 26 Aug 2026 Householder
  • DC/26/145156 Awaiting decision

    6 WALTERS WAY, LONDON, SE23 3LH

    The installation of an Air Source Heat Pump positioned on the flat roof of the front porch, together with the removal of the existing glasal fibre cement cladding board and overcladding the thermal envelope, ground floor rear and front porch extension, first floor rear extension and extension of roofline, installation of solar panels at roof level and all associated works at Walters Way SE23.

    Received 24 Aug, published by the council 26 Aug 2026 Householder
  • DC/26/145162 Awaiting decision

    78 DOWANHILL ROAD, LONDON, SE6 1SY

    Construction of a rear extension at 78 Downhill Road, SE6 1SY.

    Received 24 Aug, published by the council 26 Aug 2026 Householder