Skip to content
PlanIndex Get alerts
Menu

Planning application

16 PASTURE ROAD, LONDON, SE6 1JF

Granted Lewisham DC/19/110870 Householder Prior Approval

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Prior Approval for the construction of a single storey rear extension at 16 Pasture Road, SE6. The proposal would extend 6m beyond the rear wall of the property with a maximum height of 3m and an eaves height of 2.5m.

As published by the council, reference DC/19/110870

Application record

Reference
DC/19/110870
Type
Householder Prior Approval
Status
Decided
Decision
Approval Not Required
Received
7 Feb 2019
Validated
7 Feb 2019
Decided
19 Mar 2019
Ward
Whitefoot
Decision by
Delegated
Postcode
SE6 1JF

Site history

Applications at this address on the Lewisham register

This site has had 2 applications since 2018: 1 approved, 1 refused.

  • DC/18/108716 Refused

    16 PASTURE ROAD, LONDON, SE6 1JF

    Prior Approval for the construction of a single storey rear extension at 16 Pasture Road, SE6. The proposal would extend 6m beyond the rear wall of the property with a maximum height of 3m and an eaves height of 2.5m.

    Decided 4 Oct 2018 Prior approval

Timeline

Dates from the published record

  1. 7 Feb 2019

    Received by Lewisham

  2. 19 Mar 2019

    Decision issued: Approval Not Required

  3. 30 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

8 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Lewisham granted permission on 19 March 2019, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About prior approval applications

Prior approval applies where permitted development rights already grant the principle of the work, leaving the council only the specific matters the rules name, commonly within 56 days. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • 20 PASTURE ROAD, LONDON, SE6 1JF

    DC/11/078278/FT Submitted 1 Sep 2011 0m away

    Certificate of Lawful Development (proposed) in respect of the conversion of the existing garage at 20 Pasture Road SE6

    Granted Lawful development 3 docs
  • 20 PASTURE ROAD, LONDON, SE6 1JF

    DC/11/78278/FT Submitted 1 Sep 2011 0m away

    Certificate of Lawful Development (proposed) in respect of the conversion of the existing garage at 20 Pasture Road SE6

    Granted Lawful development 3 docs
  • 16 PASTURE ROAD, LONDON, SE6 1JF

    DC/18/108716 Submitted 27 Aug 2018 0m away

    Prior Approval for the construction of a single storey rear extension at 16 Pasture Road, SE6. The proposal would extend 6m beyond the rear wall of the property with a maximum height of 3m and an eaves height of 2.5m.

    Refused Prior approval Extension 6 docs
    Small domestic
  • 7 PASTURE ROAD, LONDON, SE6 1JF

    DC/19/112536 Submitted 31 May 2019 0m away

    Prior approval for the construction of a single storey rear extension at 7 Pasture Road, SE6. The proposal would extend 6m beyond the rear wall of the property with a maximum height of 3m.

    Granted Prior approval Extension
    Small domestic
  • 20 PASTURE ROAD, LONDON, SE6 1JF

    DC/13/84243 Submitted 18 Jul 2013 0m away

    The construction of a side extension at first floor level at 20 Pasture Road SE6

    Granted Householder Extension 6 docs
    Domestic
  • 20 PASTURE ROAD, LONDON, SE6 1JF

    DC/13/084243 Submitted 18 Jul 2013 0m away

    The construction of a side extension at first floor level at 20 Pasture Road SE6

    Granted Householder Extension 6 docs
    Domestic

In Lewisham

  • DC/26/144661 Refused

    29 CALMONT ROAD, BROMLEY, BR1 4BY

    Application for Prior Approval under Schedule 2, Part 1, Class A, Part (g) of the Town and Country Planning (General Permitted Development) Order 2015 (as amended) for the construction of a single storey rear extension at a depth of 5m, an eaves height of 2.75m and a maximum height of 3m to 29 Calmont Road BR1.

    9 Jul 2026 Prior approval
  • DC/26/144763 Awaiting decision

    21-23 DARTMOUTH ROAD, LONDON, SE23 3HN

    Prior Approval under Schedule 2, Part 3, Class G of the Town and Country Planning (General Permitted Development) Order 2015 (as amended) for the change of use of the first and second floors from Use Class E into two self contained flats at 21-23 Dartmouth Road, SE23.

    17 Jul 2026 Prior approval
  • DC/26/144609 Awaiting decision

    26 MERCHISTON ROAD, LONDON, SE6 1SH

    Application for Prior Approval under Schedule 2, Part 1, Class A, Part (g) of the Town and Country Planning (General Permitted Development) Order 2015 (as amended) for the construction of a single storey rear extension at a depth of 3.15m, an eaves height of 2.85m and a maximum height of 2.85m to 26 Merchiston Road, SE6.

    6 Jul 2026 Prior approval
  • DC/26/144616 Awaiting decision

    310 DOWNHAM WAY, BROMLEY, BR1 5NS

    Application for Prior Approval under Schedule 2, Part 1, Class A, Part (g) of the Town and Country Planning (General Permitted Development) Order 2015 (as amended) for the construction of a single storey rear extension with a depth of 6m, a maximum height of 2.9.m and an eaves height of 2.9m at 310 Downham Way BR1.

    6 Jul 2026 Prior approval
  • DC/26/143979 Refused

    4 BROWNHILL ROAD, LONDON, SE6 2EJ

    Prior Approval under Schedule 2, Part 3, Class MA of the Town and Country Planning (General Permitted Development) Order 2015 (as amended) for the change of use of existing commercial ground floor at the rear from (Use Class E) into a self-contained unit (Use Class C3), together with a separate access to the existing ancillary residential unit at first floor at 4 Brownhill Road SE6.

    11 May 2026 Prior approval