Planning application
8B MARLER ROAD, LONDON, SE23 2AD
Works: Windows or glazing
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
The Installation of replacement double-glazed, PVCu casement windows in the front and rear elevations of 8B Marler Road SE23.
As published by the council, reference DC/13/85291
Application record
- Reference
- DC/13/85291
- Type
- Full Planning Permission
- Status
- Decided
- Decision
- Granted
- Received
- 21 Oct 2013
- Validated
- 21 Oct 2013
- Decided
- 3 Dec 2013
- Ward
- Perry Vale
- Parish
- Does NOT need to go to BCAP
- Decision by
- Delegated
- Postcode
- SE23 2AD
Timeline
Dates from the published record
-
21 Oct 2013
Received by Lewisham
-
3 Dec 2013
Decision issued: Granted
-
20 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, registered in Manchester
230 applications on PlanIndex · across 26 councils · 94% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
8 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
8B MARLER ROAD, LONDON, SE23 2AD
The Installation of replacement double-glazed, PVCu casement windows in the front and rear elevations of 8B Marler Road SE23.
Granted Full applications Windows or glazing 8 docs -
FIRST FLOOR FLAT, 24 MARLER ROAD, LONDON, SE23 2AD
The construction of an extension in the rear roof slope to the first floor flat at 24 Marler Road SE23, together with the installation of three roof lights in the front roof slope.
Granted Full applications Extension Loft or dormer 4 docs -
FIRST FLOOR FLAT, 24 MARLER ROAD, LONDON, SE23 2AD
The construction of an extension in the rear roof slope to the first floor flat at 24 Marler Road SE23, together with the installation of three roof lights in the front roof slope.
Granted Full applications Extension Loft or dormer -
4 Marler Road, Catford, London, SE23 2AD
Lawful Development Certificate in respect of a single storey extension to the side/rear of 4 Marler Road SE23 to provide additional living accommodation.
Granted Lawful development Extension 6 docsSmall domestic -
24 MARLER ROAD, LONDON, SE23 2AD
Certificate of Lawful Development (Proposed) for the construction of a roof extension in the rear roof slope at 24 Marler Road SE23 together with the installation of three roof lights in the front roof slope.
Withdrawn Lawful development Extension Loft or dormer -
4 MARLER ROAD, LONDON, SE23 2AD
Lawful Development Certificate for the construction of extensions to the rear roof slopes and installation of two rooflights to the front roof slope of 4 Marler Road SE23, in connection with the conversion of the loft space.
Granted Lawful development Extension Loft or dormer 3 docs
Other full applications applications
In Lewisham
-
DC/26/144712 Granted
111 SYDENHAM ROAD, LONDON, SE26 5UA
Details submitted pursuant to Condition 3-Shop Fronts and Condition 4-Windows of planning permission DC/25/142257 dated 20th March 2026 at 111 Sydenham Road SE26.
-
DC/26/144612 Refused
3 DAVID'S ROAD, LONDON, SE23 3EP
Alterations to the front elevation shopfront of 3 Davids Road, SE23.
-
DC/26/144621 Granted
FIRST FLOOR FLAT, 53 HOMECROFT ROAD, LONDON, SE26 5QN
Construction of a rear L-shaped roof extension and the installation of two rooflights in the front roof slope at First Floor Flat, 53 Homercroft Road, SE26, and associated works.
-
DC/26/142771 Granted
LAND REAR OF, 421 NEW CROSS ROAD, FRONTING STANLEY ST LONDON, SE14 6TA
Demolition of the existing building and construction of a new 4 storey building to provide flats (Use Class C3) with outdoor amenity space, cycle and refuse storage and all associated works at the rear of 421 New Cross Road, fronting onto Stanley Street SE14 and subject to a Legal Agreement pursuant to S106 of the Town and Country Planning Act 1990 (as amended).
-
DC/25/142252 Refused
139-141 LEWISHAM HIGH STREET, LONDON, SE13 6AA
The installation of a new shopfront, retractable awning and roller shutter at 139-141 Lewisham High Street SE13.