Skip to content
PlanIndex Get alerts
Menu

Planning application

Salts Recreation Ground Marine Parade Seaford East Sussex

Awaiting decision Lewes LW/26/0350 Planning Application

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Proposed siting of a shipping container for ancillary football club and community use

As published by the council, reference LW/26/0350

Application record

Reference
LW/26/0350
Type
Planning Application
Status
Awaiting decision
Received
3 Jul 2026
Validated
5 Aug 2026
Ward
Seaford Central
Parish
Seaford

Timeline

Dates from the published record

  1. 3 Jul 2026

    Received by Lewes

  2. 5 Aug 2026

    Validated

    Checked as complete and ready for consideration.

  3. 15 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 30 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Lewes took a median of 57 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Agent on file, an architecture practice

11 applications on PlanIndex · across 3 councils

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

12 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with Lewes for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Salts Recreation Ground Marine Parade Seaford East Sussex

    LW/22/0777 Submitted 25 Nov 2022 114m away

    Security fence around the perimeter of cricket nets

    Granted Full applications 14 docs
    Small domestic
  • 62 Dane Close Seaford East Sussex BN25 1EB

    LW/19/0789 Submitted 31 Oct 2019 181m away

    Single storey rear extension with creation of first floor balcony, internal layout modifications and replacement facade finishes

    Granted Full applications Extension 15 docs
    Small domestic
  • Dane Lea Dane Road Seaford East Sussex BN25 1DU

    LW/25/0475/CD Submitted 4 Aug 2025 185m away

    Discharge of Condition 2 (Electric Car Charging Points) in relation to the approval of LW/22/0011

    Granted Conditions 4 docs
  • 50 Dane Road Seaford East Sussex BN25 1DU

    LW/21/0508 Submitted 16 Jun 2021 224m away

    prior approval under The Town and Country Planning (General Permitted Development)(England) Order 2015 Schedule 2 Part 1 Class A for the erection of a single storey rear extension to measure 4m total length, 3.9m total height and 2.6m eaves height

    Granted Outline Extension 6 docs
    Small domestic
  • 5 Beach Close Seaford East Sussex BN25 2PJ

    LW/25/0610 Submitted 14 Oct 2025 267m away

    Replacement of existing hip roof with full gable ends, addition of 1no. rear double dormer, repositioning of existing front dormer with addition of 1no. window, conversion of existing detached garage into habitable space with erection of side extension and alterations to fenestration to the main house and garage

    Granted Householder Extension Loft or dormer +1 19 docs
    Domestic
  • 5 Beach Close Seaford East Sussex BN25 2PJ

    LW/26/0108/CD Submitted 2 Mar 2026 267m away

    Discharge of Condition 2 (Materials) in relation to approval LW/25/0610

    Granted Conditions 5 docs

In Lewes

  • LW/25/0178 Granted

    Keepers Valebridge Road Burgess Hill West Sussex RH15 0RT

    Construction of 1no. dwelling with attached garage

    27 Mar 2025 Full applications
  • LW/26/0241 Granted

    17 Pelham Place Pelham Road Seaford East Sussex BN25 1LH

    Replacement of metal windows with UPVC in basement and ground floor, addition of bay window and alterations to ground floor layout

    6 May 2026 Full applications
  • LW/25/0617 Refused

    Mill Farm Hayes Lane Barcombe East Sussex BN8 5BT

    Change of use of existing redundant farm buildings to mixed Class E (g)-Commercial, Business and Service and Class B8-Storage & Distribution

    16 Oct 2025 Full applications
  • LW/26/0028 Granted

    Plumpton Racecourse Ashurst Lane Plumpton East Sussex BN7 3AL

    Change of use of existing driver training school to sports centre for padel courts and associated infrastructure

    19 Jan 2026 Full applications
  • LW/26/0202 Granted

    Berrymead Spatham Lane Westmeston East Sussex BN6 8XL

    Creation of access track (retrospective)

    17 Apr 2026 Full applications