Planning application
LW/25/0552
Penlee Lewes Road Ringmer East Sussex BN8 5QH
Proposal
Conversion of two flats into one dwelling house, including internal and external alterations
As published by the council, reference LW/25/0552
Timeline
Dates from the published record
-
19 Sep 2025
Received by Lewes
-
24 Oct 2025
Validated
Checked as complete and ready for consideration.
-
18 Dec 2025
Decision issued: Approved
-
25 Jul 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
LW/26/0220/CD Awaiting decision
1A Penlee Lewes Road Ringmer East Sussex BN8 5QH
Discharge of Condition 4 (CEMP) in relation to approval of LW/25/0552
-
TW/26/0018/TCA Granted
St Hughes Lewes Road Ringmer East Sussex BN8 5QH
T1-T3 - Lime - cut back to previous pollard points
-
LW/25/0605 Granted
Ivydene Vicarage Way Ringmer East Sussex BN8 5EX
Erection of single-storey front extension
-
LW/26/0172 Granted
The Yews Lewes Road Ringmer East Sussex BN8 5ET
Erection of single-storey infill extension linking main house with existing garage, minor enlargement and partial conversion of garage into habitable space
-
LW/26/0173 Granted
The Yews Lewes Road Ringmer East Sussex BN8 5ET
Erection of single-storey infill extension linking main house with existing garage, minor enlargement and partial conversion of garage into habitable space
-
TW/25/0086/TPO Granted
Delves House Delves Close Ringmer East Sussex BN8 5EW
T671- Cedar - selective excavation of 5 No. surface roots - remove surface roots, cut back to grass edge and stump grind root Tree roots are causing a trip hazard
Other full applications applications
In Lewes
-
LW/26/0080 Granted
Rafters Chiltington Lane East Chiltington East Sussex BN7 3QU
Change of use from agricultural barn to commercial studio (Class E) with associated landscaping to provide access
-
LW/24/99999 Awaiting decision
Southover House Southover Road Lewes East Sussex BN7 1AB
EXACOM TEST CCF THIS IS A TESTN13.07.26
-
LW/26/0150 Granted
79 Vale Road Seaford East Sussex BN25 3HA
Demolition of existing dwelling and erection of 3no. terraced dwellings
-
LW/26/0186 Granted
Seaford Football Club Bramber Road Seaford East Sussex
Erection of football stand and covered standing area, installation of advertisement boards to picket fence immediately adjacent to the clubhouse and fascia signage to the clubhouse/football stand
-
LW/26/0238 Granted
The Southern Stables Ashurst Lane Plumpton East Sussex BN7 3AP
Replacement of an existing stable block, stable yard and annex building with a two-storey, four-bedroom dwelling and associated open car port structure