Skip to content
PlanIndex Get alerts
Menu

Planning application

Land Adjoining Oakfield House Station Road Plumpton Green East Sussex

Granted Lewes LW/21/0466 Advertisement Consent Application

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

illustrative graphics and information on hoarding

As published by the council, reference LW/21/0466

Application record

Reference
LW/21/0466
Type
Advertisement Consent Application
Status
Decided
Decision
Approved
Received
14 Jun 2021
Validated
16 Jun 2021
Decided
9 Sep 2021
Ward
Plumpton Streat E.Chiltington St John W
Parish
Plumpton
Decision by
Delegated Decision
Postcode
BN7 3BT

Site history

Applications at this address on the Lewes register

This site has had 3 applications since 2021: 3 approved, 0 refused.

  • LW/23/0186/CD Granted

    Land Adjoining Oakfield House Station Road Plumpton Green East Sussex

    Discharge of Conditions 2 (Tree Protection), 6 (Cycle Store) and 7 (Electric Car Parking) in relation to variation application LW/22/0291 of LW/18/0953

    Decided 28 Apr 2023 Conditions
  • LW/21/0221 Granted

    Land Adjoining Oakfield House Station Road Plumpton Green East Sussex

    variation of Condition 1 (Plans) - elevational material changes, changes to porch styles and detaching Plots 18 & 19 (from semi-detached) in relation to planning approval LW/17/0873 & LW/20/0361

    Decided 13 Dec 2021 Conditions

Timeline

Dates from the published record

  1. 14 Jun 2021

    Received by Lewes

  2. 16 Jun 2021

    Validated

    Checked as complete and ready for consideration.

  3. 9 Sep 2021

    Decision issued: Approved

  4. 8 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

6 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Lewes granted permission on 9 September 2021, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About advertisement consent applications

Advertisement consent is judged on two things only: amenity and public safety, not competition or other planning considerations. More in our guide to planning application types.

Nearby applications

Within 500 metres

In Lewes

  • LW/26/0274 Granted

    Land North Of Lewes Road Ringmer East Sussex

    Installation of 1no non-illuminated single stack sign

    20 May 2026 Advertising
  • LW/26/0206 Granted

    Bus Shelter Nearby Waste Depot New Road Industrial Area Newhaven East Sussex

    Installation of internally illuminated double-sided digital panels as part of the bus stop advertisement

    17 Apr 2026 Advertising
  • LW/26/0211 Granted

    Bus Shelter Station Approach Seaford East Sussex

    Installation of internally illuminated double-sided digital panels as part of the bus stop advertisement

    17 Apr 2026 Advertising
  • LW/26/0205 Granted

    Advertising Right 2405 0008 On Bus Shelter Buckle Bypass Seaford East Sussex

    Installation of internally illuminated double-sided digital panels as part of the bus stop advertisement

    17 Apr 2026 Advertising
  • LW/26/0204 Granted

    Advertising Right 2405 0005 Opposite 4 Sutton Park Road Seaford East Sussex

    Installation of internally illuminated double-sided digital panels as part of the bus stop advertisement

    17 Apr 2026 Advertising