Planning application
Brockwells Industrial Estate The Broyle Ringmer East Sussex
Works: Extension
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
retrospective application for the extension of a B8 Storage and Distribution building
As published by the council, reference LW/21/0317
Application record
- Reference
- LW/21/0317
- Type
- Planning Application
- Status
- Decided
- Decision
- Approved
- Received
- 30 Apr 2021
- Validated
- 22 Jun 2021
- Decided
- 8 Sep 2021
- Ward
- Ouse Valley & Ringmer
- Parish
- Ringmer
- Decision by
- Delegated Decision
Timeline
Dates from the published record
-
30 Apr 2021
Received by Lewes
-
22 Jun 2021
Validated
Checked as complete and ready for consideration.
-
8 Sep 2021
Decision issued: Approved
-
8 Sep 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, a planning consultancy registered in Hove
44 applications on PlanIndex · across 19 councils · 85% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
11 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Acorn House The Broyle Ringmer East Sussex
Discharge of condition 2 (Risk Assessment report) and 5 (Structural Engineers Foundation Design) relating to approval LW/22/0499
Granted Conditions 10 docs -
Acorn House The Broyle Ringmer East Sussex
Variation of condition 8 (Parking) and 10 (Turning Circle) relating to approval LW/22/0499 - Alternative car parking layout to accommodate safe manoeuvering of articulated HGV entering, turning and exiting the site, improvement to flow of car park and enhanced pedestrian access and provide additional green space
Granted Conditions 17 docs -
Acorn House The Broyle Ringmer East Sussex
Discharge of Conditions: 8 (Parking) and 10 (Turning Circle) in relation to approval LW/22/0499
Granted Conditions 10 docs -
3 Elphick Road Ringmer East Sussex BN8 5PR
94% historically approved · decision due ~16 Sep
Single storey side extension to form garage with utility room/WC to rear and alterations to existing conservatory to replace polycarbonate roof with solid insulated tiled roof
Awaiting decision Householder Extension 10 docsSmall domestic -
Caburn Enterprise Park The Broyle Ringmer East Sussex
Demolition of 2nos. existing buildings, removal of external storage and erection of 1no. building, addition of car/cycle/motorcycle parking spaces with associated soft landscaping
Granted Full applications Demolition 28 docs -
Land Between The Broyle And Roundhouse Road The Broyle Ringmer East Sussex
Modification of S106 linked to Planning Application LW/22/0255 - variation to definitions including Affordable Rents, Local Housing Allowance, Mortgagee in Possession and Protected Tenant, as well as removal of Definition of Chargee and Chargees Duty
Granted Conditions 9 docs
Other full applications applications
In Lewes
-
LW/25/0178 Granted
Keepers Valebridge Road Burgess Hill West Sussex RH15 0RT
Construction of 1no. dwelling with attached garage
-
LW/26/0241 Granted
17 Pelham Place Pelham Road Seaford East Sussex BN25 1LH
Replacement of metal windows with UPVC in basement and ground floor, addition of bay window and alterations to ground floor layout
-
LW/25/0617 Refused
Mill Farm Hayes Lane Barcombe East Sussex BN8 5BT
Change of use of existing redundant farm buildings to mixed Class E (g)-Commercial, Business and Service and Class B8-Storage & Distribution
-
LW/26/0028 Granted
Plumpton Racecourse Ashurst Lane Plumpton East Sussex BN7 3AL
Change of use of existing driver training school to sports centre for padel courts and associated infrastructure
-
LW/26/0202 Granted
Berrymead Spatham Lane Westmeston East Sussex BN6 8XL
Creation of access track (retrospective)