Skip to content
PlanIndex Get alerts
Menu

Planning application

151 Abbey Lane

Awaiting decision Leicester 20261051 Operational development - full application

Works: Demolition Windows or glazing

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Partial demolition of building; change of use from tool hire centre (Sui Generis) to two commercial units with ancillary first floor storage (1 x flexible drive-through unit including café/ restaurant (Class E) and hot food takeaway (Sui Generis); 1x flexible unit including commercial (Class E) and hot food takeaway (Sui Generis); removal of cladding, installation of external fire escape, replacement windows and doors, installation three EV chargers, substation and waste storage area to front; landscaping, fencing, alterations

As published by the council, reference 20261051

Application record

Reference
20261051
Type
Operational development - full application
Status
Pending decision
Received
10 Jul 2026
Validated
5 Aug 2026
Ward
Abbey
Decision by
Delegated
Postcode
LE4 5NZ

Timeline

Dates from the published record

  1. 10 Jul 2026

    Received by Leicester

  2. 5 Aug 2026

    Validated

    Checked as complete and ready for consideration.

  3. 14 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 30 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Leicester took a median of 56 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

29 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Leicester for determination, against a statutory target of eight weeks. Over the last year Leicester decided full applications in a median of 61 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 5 Corporation Road, Prospect Works

    20260667 Submitted 13 May 2026 100 yards away

    Retrospective change of use from general industrial (Class B2 ) to storage/distribution warehouse with ancillary cash-and-carry/trade counter sales, customer collection/payment counters, associated offices, servicing, loading and parking (Class B8)

    Granted Full applications 7 docs
  • 123 Abbey Lane

    20260153 Submitted 5 Feb 2026 100 yards away

    80% historically approved · decision due ~1 May

    Construction of 3 (2 Storey) industrial units (Class E(G)(iii)/B2/B8); associated landscaping, parking, vehicular access onto classified road Abbey Lane), infrastructure (amends received)

    Awaiting decision Full applications 47 docs
  • 14 Beaumont Leys Lane

    20213032 Submitted 16 Dec 2021 150 yards away

    Notification of proposed single storey extension at rear of dwellinghouse of dimensions: 6 metres beyond the rear wall of the original dwellinghouse; maximum height 2.8 metres; height of the eaves 2.6 metres (Class C3)

    Granted Extension 4 docs
    Small domestic
  • 13 Anchor Street

    20211069 Submitted 29 Apr 2021 150 yards away

    Construction of three storey (2 bed) dwelling (Class C3) adjacent to 13 Anchor Street

    Withdrawn Full applications 4 docs
    Domestic
  • 15 Sudeley Avenue

    20211930 Submitted 3 Aug 2021 150 yards away

    Construction of single and two storey extension at side; single storey extension at rear; dormer at rear of house (Class C3) (amended plans received)

    Granted Full applications Extension Loft or dormer 1 doc
    Small domestic
  • 54 Corporation Road

    20212490 Submitted 4 Oct 2021 150 yards away

    Notification of proposed single storey extension at rear of dwellinghouse of dimensions: 6 & 3.5 metres beyond the rear wall of the original dwellinghouse; maximum height 3.9 metres; height of the eaves 2.7 metres (Class C3)

    Granted Extension 6 docs
    Small domestic

In Leicester

  • 20251275 Granted

    176-180 Loughborough Road

    Demolition of part of rear; change of use from former police station (Sui Generis) to 6 flats (4x1bed) (2x2bed)(Class C3); construction of first floor extension at rear; alterations to roof at front; associated car parking; bin and cycle storage; boundary treatment; alterations (Amendments received)

    Received 1 Aug, published by the council 22 Jul 2026 Full applications
  • 20261147 Granted

    3 Romway Avenue

    Construction of single storey extension at front and rear; first floor extension at side; increase in height of existing two-storey side extension; construction of hipped roof over existing two storey side extension; alterations to dwellinghouse (Class C3)

    Received 3 Aug, published by the council 27 Aug 2026 Full applications
  • 20261109 Granted

    65 Stoughton Drive North

    Construction of single storey extension at rear; alterations to dwellinghouse (Class C3)

    Received 24 Jul, published by the council 14 Aug 2026 Full applications
  • 20261018 Granted

    37 Ashfield Road

    Construction of single storey extension at rear with raised patio; alterations to the house (Class C3)

    Received 6 Jul, published by the council 14 Aug 2026 Full applications
  • 20261183 Granted

    12 Bunten Green

    Construction of single storey extension to rear of dwellinghouse (Class C3)

    Received 7 Aug, published by the council 9 Sep 2026 Full applications