Skip to content
PlanIndex Get alerts
Menu

Planning application

93 Parker Drive

Refused Leicester 20241934 Operational development - full application

Works: Windows or glazing

Refused. Only the applicant can appeal, within the statutory time limit, and a revised scheme can be submitted instead.

Proposal

Change of use of part ground floor from warehouse (Class B8) to retail shop (Class E); installation of shopfront and alterations to front elevation; & alterations to side elevation; ancillary parking, cycle and bin storage

As published by the council, reference 20241934

Application record

Reference
20241934
Type
Operational development - full application
Status
Refusal
Decision
Refusal
Received
30 Oct 2024
Validated
31 Oct 2024
Decided
24 Dec 2024
Ward
Abbey
Decision by
Delegated
Postcode
LE4 0JP

Timeline

Dates from the published record

  1. 30 Oct 2024

    Received by Leicester

  2. 31 Oct 2024

    Validated

    Checked as complete and ready for consideration.

  3. 24 Dec 2024

    Decision issued: Refusal

  4. 3 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

15 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What refusal means

The process from here

The council refused this application for the reasons set out on the decision notice, which the council portal holds in full. Only the applicant can appeal a refusal; the time limit runs from the decision date and is shorter for householder schemes.

Refusal does not prevent a fresh attempt. Applicants often address the reasons for refusal and resubmit, so a refused scheme is not necessarily the end of proposals for the site.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 39 Galleywood Drive

    20261252 Submitted 18 Aug 2026 197m away

    81% historically approved · decision due ~27 Oct

    Variation of condition 3 (Approved Plans) attached to planning permission 20260014 to raise ridge to match existing, install two rooflights to front, construction of two dormer extensions to rear of house (Class C3); alterations

    Awaiting decision Full applications Extension Loft or dormer 7 docs
  • 25 Welbeck Avenue

    20260752 Submitted 1 Jun 2026 251m away

    Construction of single storey side and rear extension; alterations to house (Class C3)

    Granted Full applications Extension 8 docs
    Small domestic
  • 19 Sheringham Road

    20241770 Submitted 3 Oct 2024 261m away

    Demolition of existing garage at side; construction of single/two storey extension at side/rear of house; hardstanding to front (Class C3)

    Granted Full applications Extension Demolition 9 docs
  • 4 Homemead Avenue

    20260716 Submitted 20 May 2026 313m away

    Demolition of single storey store at side; construction of two storey extension at side; single storey extension at rear; alterations (Class C3)

    Refused Full applications Extension Demolition 6 docs
    Small domestic
  • 4 Homemead Avenue

    20261182 Submitted 6 Aug 2026 313m away

    81% historically approved · decision due ~2 Oct

    Demolition of single storey garage, store and covered area at side; construction of two storey extension at side; single storey extension at rear; alterations (Class C3)

    Awaiting decision Full applications Extension Demolition 6 docs
    Small domestic
  • Somerset Avenue, John O'Gaunt

    20251816 Submitted 13 Nov 2025 351m away

    81% historically approved · decision due ~3 Mar

    Demolition of public house; construction of 10 two-storey dwellings (6x 3bed, 4x 2bed) (Class C3) (Amended plans)

    Awaiting decision Full applications Demolition 49 docs

In Leicester

  • 20261135 Granted

    11 Lyncote Road

    Construction of two storey extension at rear; alterations to dwellinghouse (Class C3)

    30 Jul 2026 Full applications
  • 20261001 Granted

    21 Lindsay Road

    Construction of single storey extension at rear of house (Class C3)

    1 Jul 2026 Full applications
  • 20261029 Granted

    14 Abbeymead Road

    Demolition of store and conservatory at rear; construction of single storey extension at side and rear; alterations to dwellinghouse (Class C3)

    7 Jul 2026 Full applications
  • 20260839 Granted

    9 Lutterworth Road

    Installation of new shopfront and replacement roller shutter at front; installation of extraction system, AC units at rear; alterations (Class E) (amendments received 16/07/2026)

    9 Jun 2026 Full applications
  • 20260985 Granted

    104 High Street

    Installation of replacement windows to ground floor

    26 Jun 2026 Full applications