Planning application
11 Lady Hay Road
Works: Extension Demolition Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Demolition of conservatory; Construction of single storey extension at rear of dwellinghouse (Class C3)
As published by the council, reference 20241798
Application record
- Reference
- 20241798
- Type
- Operational development - full application
- Status
- Determined
- Decision
- Conditional approval
- Received
- 9 Oct 2024
- Validated
- 10 Oct 2024
- Decided
- 4 Dec 2024
- Ward
- Beaumont Leys
- Decision by
- Delegated
- Postcode
- LE3 9QW
Timeline
Dates from the published record
-
9 Oct 2024
Received by Leicester
-
10 Oct 2024
Validated
Checked as complete and ready for consideration.
-
4 Dec 2024
Decision issued: Conditional approval
-
14 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
4 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Anstey Lane, Land West of
Screening opinion as to whether an Environmental Impact Assessment is required
Decided Outline 2 docs -
Groby Road, Glenfield Hospital
Notification of works to six (6) trees and the felling of six (6) trees with Tree Preservation Orders (TPO 213 & 214)
Granted Trees 10 docs -
Glenfield Hospital, Groby Road
Notification of work to four (4) trees and the felling of two (2) trees protected by a TPO (TPO 213)
Granted Trees 4 docs -
5 Blakeshay Close
Construction of single storey conservatory at rear of house (Class C3) (amended plans 12/11/2024 & 13/11/2024)
Granted Full applications Extension 10 docsSmall domestic
Other full applications applications
In Leicester
-
20261135 Granted
11 Lyncote Road
Construction of two storey extension at rear; alterations to dwellinghouse (Class C3)
-
20261001 Granted
21 Lindsay Road
Construction of single storey extension at rear of house (Class C3)
-
20261029 Granted
14 Abbeymead Road
Demolition of store and conservatory at rear; construction of single storey extension at side and rear; alterations to dwellinghouse (Class C3)
-
20260839 Granted
9 Lutterworth Road
Installation of new shopfront and replacement roller shutter at front; installation of extraction system, AC units at rear; alterations (Class E) (amendments received 16/07/2026)
-
20260985 Granted
104 High Street
Installation of replacement windows to ground floor