Skip to content
PlanIndex Get alerts
Menu

Planning application

19 Meadow Gardens

Granted Leicester 20241744 Operational development - full application

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Construction of single storey extension at side of house (Class C3)

As published by the council, reference 20241744

Application record

Reference
20241744
Type
Operational development - full application
Status
Determined
Decision
Conditional approval
Received
30 Sep 2024
Validated
2 Oct 2024
Decided
23 Dec 2024
Ward
Saffron
Decision by
Delegated
Postcode
LE2 6QN

Timeline

Dates from the published record

  1. 30 Sep 2024

    Received by Leicester

  2. 2 Oct 2024

    Validated

    Checked as complete and ready for consideration.

  3. 23 Dec 2024

    Decision issued: Conditional approval

  4. 3 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

7 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Southfields Drive, Site Of Southfield Infant School

    20260103 Submitted 27 Jan 2026 180m away

    Variation of conditions 28 (drawings attached to planning permission 20240044 (Variation of condition 28 (Drawings) attached to planning permission 20220960 (Demolition of existing buildings and construction of 44 houses (2x1 bed, 30x2 bed, 12x3 bed) and 9 flats (5x1 bed and 4x2 bed) with associated landscaping, public open space, roads and car parking) to change approved drawing references (amended plans received 02/05/2024) to make the following alterations to the South Block: increase in overall height; alterations to roof layout (solar panels and sedum roof), fenestration, external materials, and internal layout (lobby and one ground floor flat), plant areas; removal of substation

    Granted Other New dwelling Demolition +1 18 docs
    Major scheme
  • 3 Babington Row

    20261134 Submitted 30 Jul 2026 266m away

    83% historically approved · decision due ~24 Sep

    Notification of proposed single storey extension at rear of dwellinghouse of dimensions: 4.3 metres beyond the rear wall of the original dwellinghouse; maximum height 3.8 metres; height of the eaves 2.9 metres (Class C3)

    Awaiting decision Extension 5 docs
    Small domestic
  • 3 Babington Row

    20260829 Submitted 8 Jun 2026 266m away

    Notification of proposed single storey extension at rear of dwellinghouse of dimensions: 5 metres beyond the rear wall of the original dwellinghouse; maximum height 3.6 metres; height of the eaves 2.9 metres (Class C3)

    Withdrawn Extension 4 docs
    Small domestic
  • 64 Windley Road

    20260910 Submitted 17 Jun 2026 334m away

    Installation of external wall insulation to house (Class C3)

    Granted Full applications 6 docs
  • 17 Burnside Road

    20260909 Submitted 17 Jun 2026 342m away

    Installation of external wall insulation to house (Class C3)

    Granted Full applications 6 docs
  • Elston fields Recreation grounds

    20260837 Submitted 8 Jun 2026 363m away

    Approval of details reserved by Conditions 5 (SUDs), 6 (drainage) attached to planning permission 20250470

    Granted Conditions 7 docs

In Leicester

  • 20261135 Granted

    11 Lyncote Road

    Construction of two storey extension at rear; alterations to dwellinghouse (Class C3)

    30 Jul 2026 Full applications
  • 20261001 Granted

    21 Lindsay Road

    Construction of single storey extension at rear of house (Class C3)

    1 Jul 2026 Full applications
  • 20261029 Granted

    14 Abbeymead Road

    Demolition of store and conservatory at rear; construction of single storey extension at side and rear; alterations to dwellinghouse (Class C3)

    7 Jul 2026 Full applications
  • 20260839 Granted

    9 Lutterworth Road

    Installation of new shopfront and replacement roller shutter at front; installation of extraction system, AC units at rear; alterations (Class E) (amendments received 16/07/2026)

    9 Jun 2026 Full applications
  • 20260985 Granted

    104 High Street

    Installation of replacement windows to ground floor

    26 Jun 2026 Full applications