Skip to content
PlanIndex Get alerts
Menu

Planning application

15 Dunholme Road

Granted Leicester 20241496 Operational development - full application

Works: Extension Loft or dormer

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Construction of single and two storey extension at rear; dormer extension at rear of house (Class C3) (Amended plans received 06/12/2024)

As published by the council, reference 20241496

Application record

Reference
20241496
Type
Operational development - full application
Status
Determined
Decision
Conditional approval
Received
20 Aug 2024
Validated
20 Sep 2024
Decided
12 Dec 2024
Ward
Troon
Decision by
Delegated
Postcode
LE4 9BW

Timeline

Dates from the published record

  1. 20 Aug 2024

    Received by Leicester

  2. 20 Sep 2024

    Validated

    Checked as complete and ready for consideration.

  3. 12 Dec 2024

    Decision issued: Conditional approval

  4. 27 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

8 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 10 Braybrooke Road

    20241660 Submitted 17 Sep 2024 259m away

    Notification of proposed single storey extension at rear of dwellinghouse of dimensions: 6 metres beyond the rear wall of the original dwellinghouse; maximum height 3.6 metres; height of the eaves 2.7 metres (Class C3)

    Granted Extension 5 docs
    Small domestic
  • 26 Edgehill Road

    20261292 Submitted 25 Aug 2026 304m away

    81% historically approved · decision due ~21 Oct

    Partial demolition of dwelling including removal of bay windows to front; first floor extension; extension to rear; outbuilding to rear; reconstruction of dwelling with two storey extension to front; upwards extension at first floor; single storey extension at side; two storey extension at rear; single storey extension to rear; boundary wall at rear; installation of hardstanding at front; alterations to dwellinghouse (Class C3)

    Awaiting decision Full applications Extension Demolition +1 2 docs
    Small domestic
  • 9 Carpe Road

    20260732 Submitted 26 May 2026 360m away

    Construction of single storey extension at rear of house (Class C3) (amended plans received 20 July)

    Granted Full applications Extension 13 docs
    Small domestic
  • 11 Carpe Road

    20260970 Submitted 24 Jun 2026 363m away

    Notification of proposed single storey extension at rear of dwellinghouse of dimensions: 6.00 metres beyond the rear wall of the original dwellinghouse; maximum height 3.00 metres; height of the eaves 2.90 metres (Class C3)

    Granted Extension 6 docs
    Small domestic
  • 85 Woodgreen Road

    20251866 Submitted 24 Nov 2025 407m away

    81% historically approved · decision due ~20 Jan

    Retrospective application for the change of use from hot food takeaway (Sui Generis) to restaurant (Class E); Alterations to the Flue

    Awaiting decision Full applications 23 docs
  • 61 Marston Road

    20261174 Submitted 5 Aug 2026 477m away

    80% historically approved · decision due ~5 Oct

    Construction of a single storey extension at side of house (Class C3)

    Awaiting decision Lawful development Extension 10 docs
    Small domestic

In Leicester

  • 20261135 Granted

    11 Lyncote Road

    Construction of two storey extension at rear; alterations to dwellinghouse (Class C3)

    30 Jul 2026 Full applications
  • 20261001 Granted

    21 Lindsay Road

    Construction of single storey extension at rear of house (Class C3)

    1 Jul 2026 Full applications
  • 20261029 Granted

    14 Abbeymead Road

    Demolition of store and conservatory at rear; construction of single storey extension at side and rear; alterations to dwellinghouse (Class C3)

    7 Jul 2026 Full applications
  • 20260839 Granted

    9 Lutterworth Road

    Installation of new shopfront and replacement roller shutter at front; installation of extraction system, AC units at rear; alterations (Class E) (amendments received 16/07/2026)

    9 Jun 2026 Full applications
  • 20260985 Granted

    104 High Street

    Installation of replacement windows to ground floor

    26 Jun 2026 Full applications