Skip to content
PlanIndex Get alerts
Menu

Planning application

73 Turner Road, Garage Court Adjacent

Granted Leicester 20232375 Operational development - full application

Works: Demolition Several homes

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Demolition of existing garages; construction of four houses (4 x 2 bed) (Class C3) (Amended plans received 10/10/24 and 04/12/24)

As published by the council, reference 20232375

Application record

Reference
20232375
Type
Operational development - full application
Status
Determined
Decision
Conditional approval
Received
13 Dec 2023
Validated
9 Feb 2024
Decided
6 Dec 2024
Ward
Humberstone & Hamilton
Decision by
Delegated

Timeline

Dates from the published record

  1. 13 Dec 2023

    Received by Leicester

  2. 9 Feb 2024

    Validated

    Checked as complete and ready for consideration.

  3. 6 Dec 2024

    Decision issued: Conditional approval

  4. 14 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

31 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 34 Gardenia Road

    20261300 Submitted 25 Aug 2026 125m away

    81% historically approved · decision due ~21 Oct

    Construction of two storey extension at rear of house (Class C3)

    Awaiting decision Full applications Extension 1 doc
  • 1 Humberstone Drive

    20241226 Submitted 9 Jul 2024 135m away

    Demolition of outbuilding and side and rear extension; removal of chimney; construction of timber canopy to the side; single storey extension at rear of house (Class C3)

    Refused Full applications Extension Demolition 15 docs
    Small domestic
  • 18 Tennis Court Drive

    20241476 Submitted 15 Aug 2024 156m away

    Construction of single and two storey side and rear extension to dwelling (Class C3); alterations (amended plans received 18/10/2024)

    Granted Full applications Extension 13 docs
    Domestic
  • 180 Uppingham Road

    20241581 Submitted 5 Sep 2024 238m away

    Installation of one non-illuminated fascia sign; one non-illuminated projecting sign; one non-illuminated wall sign; four non-illuminated window signs; window manifestation banding at front of shop (Class E)

    Granted Advertising Windows or glazing 9 docs
  • 263 Uppingham Road

    20241820 Submitted 14 Oct 2024 251m away

    Notification of proposed change of use of part ground floor & first floor from shop (Class E) to 3 flats (3x1 Bed) (Class C3)

    Refused Full applications New dwelling 18 docs
    Several homes
  • 16 Freeman Road North

    20241497 Submitted 20 Aug 2024 285m away

    Change of use from house (Class C3) to three flats (all 1-bed) (Class C3); construction of dormer extension at front; single and two storey extension at rear; alterations (Planning permission granted on appeal - 29 July 2025).

    Refused Full applications New dwelling Extension +1 11 docs
    Several homes

In Leicester

  • 20261135 Granted

    11 Lyncote Road

    Construction of two storey extension at rear; alterations to dwellinghouse (Class C3)

    30 Jul 2026 Full applications
  • 20261001 Granted

    21 Lindsay Road

    Construction of single storey extension at rear of house (Class C3)

    1 Jul 2026 Full applications
  • 20261029 Granted

    14 Abbeymead Road

    Demolition of store and conservatory at rear; construction of single storey extension at side and rear; alterations to dwellinghouse (Class C3)

    7 Jul 2026 Full applications
  • 20260839 Granted

    9 Lutterworth Road

    Installation of new shopfront and replacement roller shutter at front; installation of extraction system, AC units at rear; alterations (Class E) (amendments received 16/07/2026)

    9 Jun 2026 Full applications
  • 20260985 Granted

    104 High Street

    Installation of replacement windows to ground floor

    26 Jun 2026 Full applications