Skip to content
PlanIndex Get alerts
Menu

Planning application

19-23 Burleys Way

Granted Leicester 20212829 Operational development - full application

Works: New dwelling Extension Major scheme

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Variation of condition 15 (approved plans) attached to planning permission 20200791: (Change of use of storage space and office accommodation (Class B1 and B8); construction of third floor; construction of single storey rear extension; installation of wall/roof-mounted equipment and solar panels; alterations to create 42 flats (41x 1bed, 1x 2bed) (Class C3)(Amended Plans)) to allow removal of the sloping roof screen around the perimeter of the roof, remove the stairs on the third floor, remove the upper stairwell, clarify new sections of brickwork on Lichfield Street, installation of a ventilation opening on Grafton Place and change the roller shutter door to the bin store.

As published by the council, reference 20212829

Application record

Reference
20212829
Type
Operational development - full application
Status
Determined
Decision
Granted As published: Conditional approval
Received
16 Nov 2021
Validated
17 Nov 2021
Decided
10 Feb 2022
Ward
Abbey
Decision by
Delegated

Site history

Applications at this address on the Leicester register

This site has had 4 applications since 2021: 1 approved, 0 refused.

  • 20220364 Decided

    19-23 Burleys Way

    Discharge of conditions attached to planning permission 20212829: condition 3 (archaeology), condition 8 (bird and bat boxes/tiles/bricks) and condition 10 (first part)(energy efficiency measures)

    Decided 28 Mar 2022 Conditions
  • 20220003 Decided

    19-23 Burleys Way

    Discharge of conditions attached to planning permission 20212829: Condition 12 (Noise mitigation scheme) and Condition 14 (Construction Method Statement)

    Decided 11 Apr 2022 Conditions
  • 20212752 Decided

    19-23 Burleys Way

    Discharge of condition attached to Planning Permission 20200791 : Condition 3 (Written scheme of investigation)

    Decided 16 Dec 2021 Conditions

Timeline

Dates from the published record

  1. 16 Nov 2021

    Received by Leicester

  2. 17 Nov 2021

    Validated

    Checked as complete and ready for consideration.

  3. 10 Feb 2022

    Decision issued: Conditional approval

  4. 8 Oct 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

14 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Leicester granted permission on 10 February 2022, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 19-23 Burleys Way

    20220364 Submitted 17 Feb 2022 50 yards away

    Discharge of conditions attached to planning permission 20212829: condition 3 (archaeology), condition 8 (bird and bat boxes/tiles/bricks) and condition 10 (first part)(energy efficiency measures)

    Decided Conditions 8 docs
  • 19-23 Burleys Way

    20212752 Submitted 4 Nov 2021 50 yards away

    Discharge of condition attached to Planning Permission 20200791 : Condition 3 (Written scheme of investigation)

    Decided Conditions 4 docs
  • 19-23 Burleys Way

    20220003 Submitted 4 Jan 2022 50 yards away

    Discharge of conditions attached to planning permission 20212829: Condition 12 (Noise mitigation scheme) and Condition 14 (Construction Method Statement)

    Decided Conditions 17 docs
  • St Margaret's Bus Station, Gravel Street

    20212240 Submitted 3 Sep 2021 100 yards away

    Discharge of condition attached to planning permission 20202080: Condition 2 (Design and materials)

    Decided Conditions 11 docs
  • Gravel Street, St Margarets Bus Station

    20220276 Submitted 7 Feb 2022 100 yards away

    Discharge conditions attached to planning permission 20202080: Condition 8 (plant and services) and 9 (First part) (sustainability/energy efficiency)

    Decided Conditions 10 docs
  • Gravel Street, St Margarets Bus Station

    20212522 Submitted 6 Oct 2021 100 yards away

    Non-material amendment to planning permission 20202080: Omission of feature hole in north east corner of station canopy.

    Granted Amendments 8 docs

In Leicester

  • 20251275 Granted

    176-180 Loughborough Road

    Demolition of part of rear; change of use from former police station (Sui Generis) to 6 flats (4x1bed) (2x2bed)(Class C3); construction of first floor extension at rear; alterations to roof at front; associated car parking; bin and cycle storage; boundary treatment; alterations (Amendments received)

    Received 1 Aug, published by the council 22 Jul 2026 Full applications
  • 20261147 Granted

    3 Romway Avenue

    Construction of single storey extension at front and rear; first floor extension at side; increase in height of existing two-storey side extension; construction of hipped roof over existing two storey side extension; alterations to dwellinghouse (Class C3)

    Received 3 Aug, published by the council 27 Aug 2026 Full applications
  • 20261109 Granted

    65 Stoughton Drive North

    Construction of single storey extension at rear; alterations to dwellinghouse (Class C3)

    Received 24 Jul, published by the council 14 Aug 2026 Full applications
  • 20261018 Granted

    37 Ashfield Road

    Construction of single storey extension at rear with raised patio; alterations to the house (Class C3)

    Received 6 Jul, published by the council 14 Aug 2026 Full applications
  • 20261183 Granted

    12 Bunten Green

    Construction of single storey extension to rear of dwellinghouse (Class C3)

    Received 7 Aug, published by the council 9 Sep 2026 Full applications